Aki Maki1 GLD Costing Aki Maki KEK 27/4/2006. Aki Maki2 Cost Summary 27/04/06 GLD COST SUMMARY –Solenoid Magnet**-** B JPY –Cryogenic System***** B JPY.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
The CMS Detector Paoti Chang National Taiwan University
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
“GLD” Detector Concept Study 21. Mar. Y. Sugimoto KEK.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
The GLD Concept. MDI Issues Impact on Detector Design L*  Background (back-scattered e+-, , n) into VTX, TPC Crossing angle  Minimum veto angle for.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
3 March 2009M. Breidenbach1 SiD LoI Costs M. Breidenbach.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
1 GLD Surface Assembly Y. Sugimoto KEK
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
SID Engineering Marco Oriunno (SLAC), Jan CLIC Workshop, CERN Toward the TDR.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
111 ILD LOI Part-II: Detector Y. Sugimoto KEK for ILD concept group.
SiD Engineering Status Report Kurt Krempetz (Layer 5) (Layer 1) VXD.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
SiD Engineering: Iron and Solenoid Design Kurt Krempetz (Layer 5) (Layer 1) VXD.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
International Workshop on Linear Colliders, Geneve Muon reconstruction and identification in the ILD detector N. D’Ascenzo, V.Saveliev.
SiD Engineering Design for the LOI Kurt Krempetz (Layer 5) (Layer 1) VXD.
CEA DSM Irfu - F. KIRCHER - [Seoul Workshop, Feb 16-18, 2009] 1 ILD detector magnet: LoI version F. Kircher, O. Delferrière CEA Saclay, DSM/Irfu/SACM.
18/11/04DELPHI visits, PhC1 Visits to DELPHI/LHCb Ph.Charpentier.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
Cost Issues Y.Sugimoto, A.Maki Estimation Procedure Get unit cost from the cost estimation for GLD(DOD) Estimate (relative) amount of return-yoke.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
Coil and HCAL Parameters for CLIC Solenoid and Hadron-calorimetry for a high energy LC Detector 15. December LAPP Christian Grefe CERN.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
The HCAL barrel absorber structure
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
1. Introduction 2. Magnetic field design Optimization of yoke configuration in several conf. Boundary conditions -
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
12/20/2006ILC-Sousei Annual KEK1 Particle Flow Algorithm for Full Simulation Study ILC-Sousei Annual KEK Dec. 20 th -22 nd, 2006 Tamaki.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Magnetic System Overview Solenoid and Anti-DID
Layout of Detectors for CLIC
Update of experimental hall in Japanese mountain site
Magnetic System Overview Solenoid and DID
SiD Solenoid Status and Plans
Status of the PANDA Magnet
SiD LoI Costs M. Breidenbach 29 July 2010 M. Breidenbach.
Sub-Detector Assembly Area Summary of discussion at ALCW2015
The Compact Muon Solenoid Detector
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
SiD Engineering Status Report
SoLID Magnet - Engineering and Cost
Integration and IR Hall
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
Comments on Dual Readout Calorimeter
ILC Detector Technology
CLEO II Magnet in Hall A for SoLID
Detector Optimization using Particle Flow Algorithm
as a prototype for Super c-tau factory
LC Calorimeter Testbeam Requirements
Sheraton Waikiki Hotel
Presentation transcript:

Aki Maki1 GLD Costing Aki Maki KEK 27/4/2006

Aki Maki2 Cost Summary 27/04/06 GLD COST SUMMARY –Solenoid Magnet**-** B JPY –Cryogenic System***** B JPY –Return Yoke***** B JPY –Calorimeter**-** B JPY –Forward Calorimeters –Muon Tracker***** B JPY –Main Tracker (TPC)***** B JPY –Silicon Inner Tracker***** B JPY –Vertex Detector***** B JPY –Data Acquisition –Total**-** B JPY

Aki Maki3 Cost Summary Major items not included –CAL Electronics Under investigation by Berkeley engineer –Forward Calorimeter Hwanbae and/or Hong Joo –FIT Electronics Hwanbae –Data Acquisition Supplied by other experiments? –Analysis Supplied by other experiments?

Aki Maki4 Cost Fraction Low High

Aki Maki5 Coil Basic Parameters –Field=3 T, IR=4 m, L=8.9 m –Stored Energy=1.6 GJ –Weight=78 tons (Cold Mass) =191 tons (Cryostat) –Power Supply: I(max)=12,000 A (8,000 A operation) –Cryogenic System: He Temp=5.0 K, He Consumption=60 l/hr

Aki Maki6 Coil Cost Estimate –Coil: Green+Lorant (’93) C1=0.458[E(MJ)]^0.7=80 M USD 9.6 B JPY Breidenbach (’05) C2=0.81[E(MJ)]^0.662=107 M USD 12.8 B JPY –Power Supply: Negligible –Cryogenic System: 4*(SDC Cold Mass)=4.5 M USD 0.54 B JPY

Aki Maki7 Return Yoke Basic Parameters –Yoke Shape: Dodecagon Dimension: 16.3 m x 16.3 m x 16 m Total Weight: 16,600 tons –Moving Mechanism Weight of GLD: 16,600+3,000=19,600 tons Weight of Endcap: 5,600 tons Distance to move and Speed: 19 m, 1 m/min

Aki Maki8 Yoke Unit Price –Steel Low carbon 180 k JPY SUS100 k JPY Structure 20 k JPY –Machining200 k JPY –Labor100 k JPY/person/day

Aki Maki9 Return Yoke Cost Estimate Barrel Endcap Material6260 tons***** B JPY5170 tons***** B JPY Machining400 m^2***** B JPY 330 m^2***** B JPY Subtotal***** B JPY ***** B JPY Total***** B JPY ***** B JPY Assembly0.1 Myen x 8 persons x 25 days x 12 months = ***** B JPY Grand Total***** B JPY

Aki Maki10 Calorimeter Basic Parameters ECAL –W3 mmt –Scintillator2 mmt –Gap1 mm –WLS Fiber 40 mml –Fiber Pitch 10 mm –Layers 33 –Depth 200 mm HCAL –Pb 20 mmt –Scintillator5 mmt –Gap1 mm –WLS Fiber 200 mml –Fiber Pitch 10 mm –Layers 46 –Depth 1200 mm

Aki Maki11 Calorimeter Basic Parameters Barrel –Dimension IR2.1 m OR3.5 m Length6.0 m –Sector Unit Division 12(phi)x5(l) IW1.10 m OW1.80 m Depth1.40 m Unit Length1.20 m Endcap –Dimension IR0.4 m OR (HCAL)3.5 m (ECAL)2.3 m Depth1.4 m –Sector Unit Division 12(phi)x2 IW0.21 m OW (HCAL)1.80 m (ECAL)1.20 m Depth1.40 m

Aki Maki12 Calorimeter Unit Price (k JPY) –Material Scintillator (m^2) –2 mmt 3.30 –3 mmt 8.25 WLS Fiber(m) 0.10 MPPC (pc) 0.50 W (m^2,3 mmt) 1200 Pb (m^2,20 mmt) 123 SUS (ton) 100 –Machining(m^2) 200 –Labor(person/day) High100 Med 50 Low 30 Required Labor –Scint+WLS 3 min/pc –Light Shield 10 min/tile –Casing 20 min/tile –Installation 5 hr/unit

Aki Maki13 Calorimeter Cost Estimate

Aki Maki14 Muon Detector

Aki Maki15 Muon Detector

Aki Maki16 TPC IR=400 mmOR=2000 mmDrift Length=2300 mm Gas ChamberOperation at 1 atmosphere Micromegas or GEM readout No. of Readout channel ~1.5 Mdesign cost/channel < 10 $ Cost Estimate Mechanics Outer Field Cage4000 k$ Inner Field Cage 800 k$ Central Membrane 300 k$ Endcap Sectors6500 k$ Sector Support Structure1500 k$ Laser System1000 k$ Gas & Cooling System1800 k$ TPC Assemble & Test2000 k$ Transport Fixtures/Shipping 750 k$ TPC Management 850 k$ Sub total 19,500 k$

Aki Maki17 TPC Electronics Prototypes & Engineering Models 750 k$ Front End Electronics3500 k$ Readout Board Assembly 450 k$ FEE Power 400 k$ Mounting, Cooling & Interlocks 140 k$ Slow Controls & Fast Timing System Interface 200 k$ Engineering Workstations 1 50 k$ Final Debug & Test/Shipping 10 k$ System Design Documentation 50 k$ TPC FEE Project Management 150 k$ Subtotal5,800 k$ Total 25.3 M$

Aki Maki18 Silicon Inner Tracker

Aki Maki19 Silicon Inner Tracker

Aki Maki20 What to do before summer Collect missing information about GLD Collect information about past experiments Refine the calculation sitting with experts