LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow, 06-07.05.2008.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY,
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
1 Laser alignment system Status report Leszek Zawiejski INP PAN, Cracow EUDET Annual Meeting 2008, October 6-8, Amsterdam, Holland W. Wierba, K. Oliwa,
FCAL silicon sensors at INP PAN Cracow Current status Our plans Some remarks FCAL Hardware WGArkadiusz Moszczynski INP PAN Cracow1.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
Tracking Integration Challenges Y. meeting 2013/9/25.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
FCAL mechanics – by (at) CERN Konrad Elsener FCAL HW WG meeting, 9 February
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Silicon sensors for LumiCal Two possible options Wojciech Wierba Institute of Nuclear Physics PAN Cracow.
Si sensors for LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
1 Laser alignment system Status report Leszek Zawiejski Eryk Kielar, Krzystof Oliwa, Wojciech Wierba, INP PAN, Cracow, Poland Wojciech Slominski, Jagiellonian.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Silicon Sensors for LumiCal Status Wojciech Wierba, J. Błocki, W. Daniluk, E. Kielar, J. Kotuła, A. Moszczyński, K. Oliwa, B. Pawlik, L. Zawiejski Institute.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
Dec
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
February 12-13, 2006 FCAL Collaboration Meeting INP PAN, Kraków, Poland Readout electronics for LumiCal – first approach Wojciech Wierba Witold Daniluk.
Laser Alignment System for LumiCal and BeamCal Arkadiusz Moszczyński, Wojciech Wierba, Leszek Zawiejski Institute of Nuclear Physics PAN, Cracow 22nd FCAL.
Albuquerque 1 Wolfgang Lohmann DESY On behalf of the FCAL collaboration Forward Region Instrumentation.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
November, 7, 2006 ECFA06, Valencia, Spain LumiCal & BeamCal readout and DAQ for the Very Forward Region Wojciech Wierba Institute of Nuclear Physics Polish.
Octobre 2007LAL Orsay Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
Thermal jumble! (Action list review) C. Marinas IFIC-Valencia DEPFET-Valencia 1 Valencia
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
Progress with System Integration of the CBM Silicon Tracking Detector
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Status of GASPARD mechanics
FCAL R&D towards a prototype of very compact calorimeter
Technical Design for the Mu3e Detector
Layout of Detectors for CLIC
Update of experimental hall in Japanese mountain site
C.Clerc ILD session, ALCPG /03/2010
LumiCal mechanical design, integration with LDC and laser alignment
Requirements of the support mechanics
10/month is the present production rate 2 FTE + sporadic contributions
ECAL – CLIC_ILD vs. CLICdet_2015
WG4 – Progress report R. Santoro and A. Tauro.
on behalf of the FCAL collaboration
AIDA 2020 Tel Aviv group.
Conlusions of the Cracow Meeting
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,

LumiCal inside ILD LumiCal can be mounted to special support fixed to the ‘construction’ pipe. Cables and cooling water pipes can be feed out in the gap between TPC and ECal endcap. Space for connectors Access to connectors LumiCal has to be centered on the outgoing beam.

Gravity! VXD ? LumiCal ~250 kg LHCal ~1000 kg ? BeamCal ~200 kg

How to fix the LumiCal? x & y initial positioning better than 0.5 mm x & y initial positioning better than 0.5 mm z initial positioning better than 0.1 mm z initial positioning better than 0.1 mm Temporary support for detector assembly on the beam pipe Temporary support for detector assembly on the beam pipe Fine x, y, z position adjustment Fine x, y, z position adjustment

Mechanical design Two options 1.Silicon sensors glued on both sides of every second tungsten plate 2.Silicon sensors glued on one side of each tungsten plate Cooling system Water pipes going around half plate. Estimated water flow – a few liters per minute (P mean = 20 W, Δt = 0.1 ºC)

Space for sensors & electronics

Sensor prototype Masks for prototypes have been ordered from Hamamatsu (~2 months, ~20 k€) Masks for prototypes have been ordered from Hamamatsu (~2 months, ~20 k€) Sensors order depends on money (price from ~900 €/40 pcs. order to ~1400 €/10 pcs. order per one tile) Sensors order depends on money (price from ~900 €/40 pcs. order to ~1400 €/10 pcs. order per one tile) „Dummy” sensor ready „Dummy” sensor ready

Fan out Traces on Kapton foil (50 µm) Traces on Kapton foil (50 µm) Double sided Double sided Trace 150 µm, space between 150 µm (can be smaller) Trace 150 µm, space between 150 µm (can be smaller) Sensor pads will be glued with conductive glue to fan out traces Sensor pads will be glued with conductive glue to fan out traces

Summary – Mechanical design Very challenging project for mechanical design. Very challenging project for mechanical design. We have to choose between single sided and double sided version. We have to choose between single sided and double sided version. Opening and closing the half barrels with accuracy better than ~5 µm. Opening and closing the half barrels with accuracy better than ~5 µm. Work in progress on precise adjustment of x, y, z and tilt position of LumiCal. Work in progress on precise adjustment of x, y, z and tilt position of LumiCal. Need detailed study on cooling. Need detailed study on cooling. More information about ‘construction’ tube. More information about ‘construction’ tube.

Summary – Sensor design Sensor prototypes will be ready by the end of this year. Sensor prototypes will be ready by the end of this year. Fan out have to be tested (crosstalk, stray capacitance, conductive gluing, bonding on Kapton foil). Fan out have to be tested (crosstalk, stray capacitance, conductive gluing, bonding on Kapton foil). „Dummy” sensor have to be equipped with capacitors and tested with fan out – can be used for FE electronic tests. „Dummy” sensor have to be equipped with capacitors and tested with fan out – can be used for FE electronic tests. Test beam prototype - the design should start soon Test beam prototype - the design should start soon