Brad Oliver – Structural Option Advisor – Professor Memari.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
University Health Building Thesis Final Presentation
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
CHINESE HOSPITAL NEW ACUTE CARE AND SKILLED NURSING FACILITY TIM ARIOSTO STRUCTURAL OPTION AE 482 – SENIOR THESIS DR. RICHARD BEHR – FACULTY ADVISOR.
Duquesne University Forbes Expansion
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Structural Option Senior Thesis Presentation Spring 2007 Advisor: Dr. Lepage Eric R. Mueller th Street – Oakland, CA.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
1776 WILSON BOULEVARD ARLINGTON VIRGINIA Penn State University Senior Thesis 2012 Faculty Advisor: Thomas Boothby Joshua Urban Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Reinsurance Group of America (RGA) Global Headquarters Natasha Beck Structural Option Faculty Advisor: Heather Sustersic Images courtesy of Gensler & Tom.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Hyatt Regency Pittsburgh International Airport Hiro McNulty Structural Option AE Senior Thesis Spring 2006.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Brad Oliver – Structural Option Advisor – Professor Memari

Johns Hopkins Graduate Student Housing Introduction Existing Structural Systems Proposal New Gravity System Lateral System (Baltimore) Lateral System (San Francisco) Construction Management Breadth Conclusions

Johns Hopkins Graduate Student HousingProject Information North Wolfe Street, Baltimore Maryland Science and Technology Park 20 floor residential tower 276, 211 sq. ft. August 2010 – June 2012 $44 million (hard costs) Courtesy of Bing maps

Johns Hopkins Graduate Student HousingGeneral Information Owner – Education Realty Trust Architect – Marks, Thomas Architects Contractor – Clark Construction Structural Engineer – Hope Furrer Associates Mechanical/Plumbing Engineer – Burdette Kohler Murphy Architecture

Johns Hopkins Graduate Student HousingGravity System 20’ – 25’ Typical spans 8” Post-tensioned concrete slab system (5ksi) 30”X20” Columns with varying strengths Short Tower Tall Tower 167’109’ 67’ 4 ksi concrete 6 ksi concrete 8 ksi concrete Roof

Johns Hopkins Graduate Student HousingLateral System 12” Thick concrete shear wall with varying strengths Foundation Drilled caisson system 75’-91’ Deep 3’-6’ Diameter 30”X30” Grade Beams 4 ksi concrete 6 ksi concrete 8 ksi concrete

Johns Hopkins Graduate Student HousingProposed Study Problem Move the site to San Francisco Shear walls not permitted in SDC “D” for that height Depth Solution Solve by designing dual system: Eccentric Braced Frame with moment connections Composite Steel Beam gravity system Construction Management Breadth Create new schedule and compare to existing Perform cost analysis to compare steel to concrete Architectural Breadth Study two public areas that would be most affected by the additional braces. (Lounge and Fitness Rooms) Create renderings to visualize the space and modify the layout of the rooms

Johns Hopkins Graduate Student HousingProject Goals Successfully design EBF Minimize height change Minimize architectural impact Reduce torsional irregularity Learn Ram Structural Design

Johns Hopkins Graduate Student Housing Steel Framing Typical bays of 24’ x 25’ and 16’ x 25’ 2” VLI composite deck with 2” topping 2 hour fire rating designated by IBC 2006 Typical Size is W12x19

Johns Hopkins Graduate Student Housing Eccentric Braced Frame Link element is most essential part of design Short link elements are controlled by shear Relatively more stiff than long elements Seismic Design Handbook

Johns Hopkins Graduate Student Housing Design Process First attempt – 28” link length, C Shape braces Wind deflections – 27” – unacceptable L/400 = 6.21” Final Design – 20” link length, W-flange braces, more frames Deflection = 5.97” Original Layout Final Layout

Design Process Strength checks by Ram and hand calculations Seismic Provisions used as a guide Web stiffener requirements calculated

Johns Hopkins Graduate Student Housing Design Criteria San Francisco University – Proposed site Decrease wind loads 90 mph to 85 mph Base shear reduction kips to 450 kips Seismic accelerations increased Base shear increase – 165 kips to 362 kips Courtesy of Bing maps

Johns Hopkins Graduate Student Housing Results Earthquake loads control in the long direction Members needed upsized lbs/ft Torsionally irregular Tall tower frame layout

Johns Hopkins Graduate Student Housing Torsional Effects Design connections between diaphragm and vertical members for 25% more force 3D model with 3 DOF at each floor Story Drift ratios must be taken at extreme point of deflection (indicated by star) Tall tower frame layout

Johns Hopkins Graduate Student Housing Construction Assumptions RS Means and Ram takeoffs used Steel columns were spliced every 2 levels for constructability, OSHA requirements, and economy Crew cost adjusted to account for tower crane

Johns Hopkins Graduate Student Housing Cost Analysis Splices estimated at 500 lbs of steel Connections estimated at 10% of steel weight Studs estimated at 10lbs of steel per stud Hard costs only (no overhead) Existing Concrete Steel Structure $5.75 million$4.37 million 32% Savings

Johns Hopkins Graduate Student Housing Schedule Analysis Schedule started at foundation to top of structure Schedule accounts for on-site activities Concrete wasn’t able to be poured in cold weather Over 2 months savings Existing Concrete July 15, 2010June 23, 2011 Steel Structure July 15, 2010April 12, 2011

Johns Hopkins Graduate Student Housing Conclusions Goals Successfully design EBF Minimize height change Minimize architectural impact Reduce torsional irregularity Learn Ram Structural Design Complete? Yes Partially Yes

Acknowledgements AE Department and Faculty Dr. Memari Hope Furrer and Assoc. Stephanie Slocum Education Realty Trust Jeffrey Resetco Marks, Thomas Architects Michael Blake Friends and Family

Johns Hopkins Graduate Student Housing Thank You Questions?

Johns Hopkins Graduate Student Housing Period T1 = 3.53 seconds T2 = 2.58 seconds T3 = 2.53 seconds

Johns Hopkins Graduate Student Housing Story Drift Ratio Calculations

Johns Hopkins Graduate Student Housing Baltimore Frame San Francisco Frame

Johns Hopkins Graduate Student Housing