Trigger/inner liner work in Perugia KOPIO collaboration meeting Feb 7,2004.

Slides:



Advertisements
Similar presentations
Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
Advertisements

Jin Huang Los Alamos National Lab.  Cited from March collaboration Meeting EC group Internal Communication Jin Huang 2 Preshower ID power drop significantly.
HCAL-J Status Hadron Calorimeter HCAL-J SBS Collaboration Meeting July, 2014 G. B. Franklin Carnegie Mellon University 7/8/2014 Carnegie Mellon INFN, Catania.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
8/17/031 Geant4 Simulations Guilherme Lima, Jeremy McCormick General Comments Test Stand (JM) Test Beam (GL)
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
M.Gallinaro, ``Innovative Particle and Radiation Detectors’’, Siena, October slide 1 The CDF MiniPlug Calorimeter Forward Physics Conceptual.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
Geometry of WLS bar + Fiber
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
Peter-Bernd Otte – Sep CB collaboration meeting, Edinburgh.
Status of TPC experiment ---- Online & Offline M. Niiyama H. Fujimura D.S. Ahn W.C. Chang.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
CALORIMETER system for the CBM detector Ivan Korolko (ITEP Moscow) CBM Collaboration meeting, October 2004.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
C.Vigorito, University & INFN Torino, Italy 30 th International Cosmic Ray Conference Merida, Mexico Search for neutrino bursts from Gravitational stellar.
Hadron Calorimeter HCAL-J GEp Electron Calorimeter BigCal Hadron Calorimeter 1 G. Franklin, Carnegie Mellon University 10/13/2011.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Nov Beam Catcher in KOPIO (H. Mikata Kaon mini worksyop1 Beam Catcher in the KOPIO experiment Hideki Morii (Kyoto Univ.) for the KOPIO.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
28 June 2007G. Pauletta: ALCPG Tests of IRST SiPMs G. Pauletta Univ. & I.N.F.N. Udine Outline 1.IRST SiPMs : baseline characteristics 2.first application.
P. Checchia ECFA-DESY Prague1 Status report of the tile-Si Lccal * project Prototype description Production Beam test results Future plans *
B.G.Cheon Mini-Trigger/DAQ workshop,OCU ECL Trigger overview ByungGu Cheon (SKKU) Outline  ECL calorimeter  ECL trigger scheme & performance.
V. Korbel, DESY1 Progress Report on the TESLA Tile HCAL Option To be filled soon.
Muon triggering system for the ALICE TOF cosmic tests for the ITEP Moscow: A.Akindinov Yu.Grishuk S.Kiselev D.Mal’kevich M.Ryabinin A.Smirnitski K.Voloshin.
CMS Torino meeting, 4 th June, 2007 R. Castello on behalf of Torino Tracker’s group Tracker Alignment with MillePede.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
PMT measurements in Antares Oleg Kalekin on behalf of Antares collaboration VLVnT 2011 Erlangen
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
Strip-scintillator/Si avalanche photo-diode Muon System Fermilab Test beam + Inst INFN Udine APDs Notre Dame Scint /WLS Baseline: Resistive Plate Chambers.
Presentations for this session Anton – Detector concept and rate estimations Scott – Readout Jonathan – Data Management.
May 26-27, 2005Tadashi Nomura (Kyoto U), KRare05 at Frascati, Italy1 KOPIO Beam Catcher Tadashi Nomura (Kyoto U.) Contents –What is Beam Catcher? –Concept.
LAV efficiency studies with photons T. Spadaro* *Frascati National Laboratory of INFN.
P. Checchia LCWS02 Jeju1 Lccal * : an R&D project for the Electromagnetic barrel Calorimeter Design principles Prototype description Status of.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
Super-IFR Detector R&D summary Wander Baldini Ferrara, Padova, Roma1 INFN and University on behalf of the superB-IFR group: Ferrara, Padova, Roma1 INFN.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
L. Bosisio - 2nd SuperB Collaboration Meeting - Frascati SuperB SVT Update on sensor and fanout design in Trieste Irina Rashevskaya, Lorenzo.
IFR Detector R&D status
An Active TARget for MEG-II, a status report
FTK: update on progress, problems, need
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
GLAST LAT tracker signal simulation and trigger timing study
5% The CMS all silicon tracker simulation
Tadashi Nomura (Kyoto U), KRare05 at Frascati, Italy
Rick Salcido Northern Illinois University For CALICE Collaboration
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Dual readout calorimeter for CepC
Report from LNF Perugia, DCH II 17 June 2009
The LHCb VErtex LOcator
Update on Ecal simulation
for the trigger subsystem working group:
Presentation transcript:

Trigger/inner liner work in Perugia KOPIO collaboration meeting Feb 7,2004

-2- Trigger/Inner liner – KOPIO meeting - 7/2/04 Subjects l Trigger u Ermanno’s rate/efficiency estimates u 10 X 10 tunable coincidence matrix u Plans for simulation of “tracking” algorithms l Inner liner u The detector scheme we have in mind u Test program and status u Simulation plans l Manpower+financial situation

-3- Trigger/Inner liner – KOPIO meeting - 7/2/04 L0 trigger: the bottom line of Ermanno’s simulation l Ingredients u Cluster counting on prerad+shashlik x-y “strips” integrated in depth u Penetration condition (at least two adjacent layers in PR) u Use of vetoes (±5ns time window) except v Far downstream v Catcher u Prerad scintillator timing with resolution from position compensated coincidences l Typical results u Rate 32 kHz u Efficiency 62%

-4- Trigger/Inner liner – KOPIO meeting - 7/2/04 Ermanno’s trigger simulatiom l Further simulation plans u Test pattern recognition algorithms with sensitivity to track directions u New undergraduate (Michele Viti) will start working on this

-5- Trigger/Inner liner – KOPIO meeting - 7/2/04 Improve PR online time resolution l Second prototype of x-y coincidence matrix with delay compensation 10 X 10 matrix on an ACTEL A54SX08A ( no placement & routing costraints ) Delay value set in 4 steps of ~0.4ns (value loaded serially)

-6- Trigger/Inner liner – KOPIO meeting - 7/2/04 Performance of 10 X 10 coincidence matrix l Measure delays of each output wrt first in same row/column: l Reprogram delay values to 1.3ns per cell l Histogram  =(measured value) – (set value) Small tail of delays too large at minimum setting Can be improved with:  placement/routing constraints  higher speed-grade devices

-7- Trigger/Inner liner – KOPIO meeting - 7/2/04 I.L. : what we have in mind Legend: shashlik crystal WLS bar/fibre beam l Assumptions: u IL only inside Shashlik u All crystals in a row parallel to beam axis can be read out with a single WLS plate running on top of the fins u If crystals match the Shashlik modules they can be held in the same mechanical structure

-8- Trigger/Inner liner – KOPIO meeting - 7/2/04 Test setup l Motivated by u Results of Woody,Stoll,Frank, IEEE Trans.Nucl.Sci 42(1995)292 v BC 404: 85 p.e./MeV ( no longer produced by Bicron ) v BC 408: ~25% less ( no longer produced by Bicron ) u Optical simulation by Mauro Raggi l We plan to test u Bicron BC 408 3mm u Bicron BC 499 6mm u Kuraray SCSN-81 3,6,9mm u Kuraray SCSN-61 3mm l Test stand with tracking for cosmic rays u Expect to start sometimes in march

-9- Trigger/Inner liner – KOPIO meeting - 7/2/04 CsI crystal assembly

-10- Trigger/Inner liner – KOPIO meeting - 7/2/04 CsI crystal assembly

-11- Trigger/Inner liner – KOPIO meeting - 7/2/04 Absorption spectra SCSF-81,61 BC-408 BC-404 BC-499

-12- Trigger/Inner liner – KOPIO meeting - 7/2/04 Inner liner simulation studies l Need to learn u Is inner liner needed ? u Can we do without PR inner liner? u What is an optimized configuration ? l Tools u Inner liner geometry v Basic description included in KOPIO Geant v Has to be made compatible with subsequent modifications u Fast/hybrid option of KOPIO GEANT MC v Developed and tested by Ermanno on version v04 v If GEANT simulation only for tracks within 20 cm from the beam hole, execution time improved by >5X v Note + update to version v06 in preparation l New undergraduate (Alessandro Grelli) will start working on this

-13- Trigger/Inner liner – KOPIO meeting - 7/2/04 Manpower + financial situation l The work described here has been performed by u Ermanno Imbergamo research contract, now Ph.D student (NA48) u Riccardo Cenci undergraduate, now Ph.D student in Pisa u Mauro Raggi now Ph.D. student (NA48) u N.Nappi, G.Anzivino, M.Valdata, P.Cenci v None at full time + some interests are shifting l Material for crystal tests bought with INFN FY 2003 money l Very small budget allocated by INFN on FY 2004 u 4.000(+4000)€ € (travel) l INFN has strongly recommended to enlarge the italian component of the collaboration l Deadline for final assessment of interests in Perugia and Italy v 2005 budget requests, to be filled in june