© 2012 Pearson Prentice Hall. All rights reserved. Using Budgets for Planning and Coordination Chapter 10.

Slides:



Advertisements
Similar presentations
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
Advertisements

Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Standard Costing and Variances
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Budgeting.
CHAPTER 15 Cost Analysis for Control. McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved Decision Making Strategic, Operational,
Cost Analysis for Control
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Flexible Budgets Distinguish between.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Cost Allocation, Customer- Profitability Analysis, and Sales-Variance.
The Islamic University –Gaza
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
1-1.
Additional Topics in Variance Analysis Chapter 17 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Standard Costing and Variance Analysis
C H A P T E R 9 Evaluating Personnel and Divisions.
C H A P T E R 6 Monitoring Performance in Cost, Profit and Investment Centers.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Copyright © 2003 Pearson Education Canada Inc. Slide 7-76 Chapter 7 Flexible Budgets, Variances and Management Control: I.
© 2009 Pearson Prentice Hall. All rights reserved. Sales-Variance Analysis.
Standard Costs and Balanced Scorecard
The Master Budget and Flexible Budgeting
© 2012 Pearson Prentice Hall. All rights reserved. Flexible Budgets, Direct-Cost Variances, and Management Control.
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Use with Management and Cost Accounting 8e by Colin Drury ISBN © 2012 Colin Drury Part Four: Information for planning, control and performance.
Chapter 17 – Additional Topics in Variance Analysis
Chapter 10 The Use of Budgets for Cost Control and Performance Evaluation.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 8 - Flexible Budgets and Variance.
Financial and Managerial Accounting
Standard Costs Budget for a single unit
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17 Flexible Budgets, Overhead Cost Management, and Activity-Based.
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
Chapter 23 Flexible Budgets and Standard Cost Systems
Chapter 21 Flexible Budgets and Standard Costing.
1 Module 22 Standard Costs and Variance Analysis.
Copyright © 2015 Pearson Education, Inc., All Rights Reserved Flexible Budgets, Direct-Cost Variances, and Management Control.
Copyright © 2008 Prentice Hall All rights reserved 11-1 Flexible Budgets and Standard Costs Chapter 11.
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
Performance Evaluation
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Sales-Variance Analysis
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
Copyright 1998 Dekker, Ltd. 1. Copyright 1998 Dekker, Ltd. 2.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 22. Prepare a flexible budget for the income statement.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 17 Budgeting.
9-1 Standard Costing: A Functional-Based Control Approach 9.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
MANUFACTURING FIRMS USE STANDARD COSTS AND STANDARD QUANTITIES TO BUDGET FOR AND ANALYZE PRODUCTION Standard Cost Variance Analysis.
20 Monitoring Performance in Cost, Profit and Investment Centers
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
© 2017 by McGraw-Hill Education
The Master Budget and Flexible Budgeting
© 2017 by McGraw-Hill Education
Flexible Budgets, Variances, and Management Control: I
Presentation transcript:

© 2012 Pearson Prentice Hall. All rights reserved. Using Budgets for Planning and Coordination Chapter 10

© 2012 Pearson Prentice Hall. All rights reserved. What-If Analysis Structure and information required to prepare the master budget can be used to easily provide the basis for what-if analysis – Evaluating Decision-Making Alternatives – Sensitivity Analysis The process of selectively varying a plan’s or budget’s key estimates for the purpose of identifying over what range a decision option is preferred

© 2012 Pearson Prentice Hall. All rights reserved. Variance Analysis Variance analysis – comparison of planned (or budgeted) results with actual results Variance—difference between planned and actual results – Should be investigated to determine: What caused the variance What should be done to correct that variance

© 2012 Pearson Prentice Hall. All rights reserved. Variance Analysis Budgeted or planned costs can come from three sources: – Standards established by industrial engineers – Previous period’s performance – A benchmark—the best in class results achieved by a competitor

© 2012 Pearson Prentice Hall. All rights reserved. Variance Analysis The financial numbers are the product of a price and a quantity component: – Budgeted amount = standard price per unit * budgeted quantity – Actual amount = actual price per unit * actual quantity Variance analysis explains the difference between planned and actual costs by evaluating: – Differences between planned and actual prices – Differences between planned and actual quantities

© 2012 Pearson Prentice Hall. All rights reserved. Variance Analysis Managers focus separately on prices and quantities because in most organizations: – One department or division is responsible for the acquisition of a resource and determining the actual price – A different department uses the resource and determines the quantity A variance is a signal that is part of a control system for monitoring results

© 2012 Pearson Prentice Hall. All rights reserved. Basic Variance Analysis If managers learn that specific actions they took helped lower the actual costs, then they can obtain further cost savings by repeating those actions on similar jobs in the future If the factors causing actual costs to be higher than expected can be identified, then actions may be taken to prevent those factors from recurring in the future If cost changes are likely to be permanent, cost information can be updated for future jobs

© 2012 Pearson Prentice Hall. All rights reserved. First-Level Variances The first-level variance for a cost item is the difference between the actual costs and the master budget costs for that cost item Variances are favorable (F) if the actual costs are less than estimated master budget costs Unfavorable (U) variances arise when actual costs exceed estimated master budget costs

© 2012 Pearson Prentice Hall. All rights reserved. Decomposing the Variances A flexible budget adjusts the forecast in the master budget for the difference between planned volume and actual volume Cost differences between the master and the flexible budget are called planning variances – Reflect the difference between planned output and actual output – Arise entirely because the planned volume of activity was not realized

© 2012 Pearson Prentice Hall. All rights reserved. Planning and Flexible Budget Variances Flexible budget variances are the differences between the flexible budget and the actual results Flexible budget variances reflect: – Quantity variances—the difference between the planned and the actual use rates per unit of output – Cost variances—the difference between the planned and the actual price or cost per unit of the various cost items

Static and Flexible Budgets Static Budget Master budget Carefully forecasted sales and operating targets Actual Budget Variances Units 7,0009,000 Sales$217,000$279,000 Variable costs: Manufacturing$151,270$189,000 Shipping. 5,0005,400 Administrative 2,000 1,800 Total variable$158,270$196,200 Contr’n margin $58,730 $82,800 Fixed costs: Manufacturing$37,300$37,000 Sell & Admin33,00033,000 Total fixed costs$70,300$70,000 Op income (loss)$(11,570)$12,800 2,000 U 62,000 U 37,730 F 400 F 200 U $37,930 F $24,070 F 300 U UNCH 300 U $24,370 U

Evaluation of Financial Performance Subdivision of total difference between master or static budget and actual results to evaluate performance FlexibleSales Actual BudgetFlexibleActivityMaster ResultsVariancesBudgetVariancesBudget Units7,0007,0002,000 U9,000 Sales$217,000$217,000$62,000 U$279,000 Variable costs158,2705,670 U152,60043,600 F196,200 Contribution Margin58,7305,670 U64,40018,400 U82,800 Fixed costs70, U70,000 70,000 Operating income$(11,570)$5,970 U$(5,600)$18,400 U$12,800

© 2012 Pearson Prentice Hall. All rights reserved. Second and Third-Level Variances The second-level variances are the planning variance and the flexible budget variance The direct material flexible budget variances and direct labor flexible budget variances can be decomposed further into third-level variances: – Efficiency variances – Price variances

Copyright  2010 Pearson Education Canada Price and Efficiency Variances Static-Budget Variance Flexible-Budget VarianceSales-Volume ( Planning ) Variance Price VarianceEfficiency Variance

A General Model for Variance Analysis AQ x (AP – SP) (AQ – SQ) x SP AQ = Actual Quantity SP = Standard Price AP = Actual Price SQ = Standard Quantity Price VarianceQuantity Variance Actual Quantity Actual Quantity Standard Quantity × × × Actual Price Standard Price Standard Price

© 2012 Pearson Prentice Hall. All rights reserved. Direct Material Variances Quantity variance = (AQ - SQ) x SP Where: AQ = actual quantity of materials used SQ = standard quantity of materials allowed SP = standard price of materials

© 2012 Pearson Prentice Hall. All rights reserved. Direct Material Variances Price variance = (AP - SP) x AQ Where: AP = actual price of materials SP = standard price of materials AQ = actual quantity of materials used – The price variance may be calculated using the quantity purchased rather than the quantity used

© 2012 Pearson Prentice Hall. All rights reserved. Direct Labor Variances Efficiency variance = (AH - SH) x SR Rate variance = (AR - SR) x AH Where: AH = actual number of direct labor hours AR = actual wage rate SR = standard rate SH = standard number of direct labor hours allowed The sum of the rate variance and the efficiency variance equals the total flexible budget direct labor variance

© 2012 Pearson Prentice Hall. All rights reserved. Support Activity Cost Variances Support costs can reflect either flexible or fixed costs The quantity of fixed costs may not change from period to period, but the spending on them may fluctuate Monitoring spending variances on fixed costs is possible and desirable

© 2012 Pearson Prentice Hall. All rights reserved. Support Activity Cost Variances Flexible support costs reflect behind-the-scenes operations that are proportional to the volume of activity but are not directly a part of the product or service provided to the customer Flexible support costs consist of a quantity (or usage) component and a price component Flexible support cost variances may be analyzed in a manner similar to direct material or direct labor variances

Sales Variances Sales volume effects – Sales mix variance – Sales quantity variance © 2012 Pearson Prentice Hall. All rights reserved. Actual totalActualPlannedPlanned = units of allx sales – sales xrevenue products soldmix %mix %per unit Actual totalPlanned totalPlannedPlanned =units of all–units of allxsales xrevenue products soldproductsmix %per unit

Copyright  2010 Pearson Education Canada Profitability Variances Static-Budget Variance Flexible-Budget VarianceSales-Volume (Planning) Variance Sales-Volume Variance = (Actual unit sales – Budgeted unit sales) x Budgeted contribution margin per unit Sales-Mix Variance Sales-Quantity Variance Level 1 Level 2 Level 3

Sales Variances Sales price effects – Sales price variance Actual number of units sold x (Actual price per unit – Planned price per unit) © 2012 Pearson Prentice Hall. All rights reserved. Actual numberActualPlanned of unitsx price per – price soldunitper unit