18/03/2010 DPG Bonn – March 2010 -Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni.

Slides:



Advertisements
Similar presentations
GSI Event-driven TDC with 4 Channels GET4
Advertisements

20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
1 MTD Readout Electronics J. Schambach University of Texas Hefei, March 2011.
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
FEE/DAQ Demonstrator Walter F.J. Müller, GSI, Darmstadt for the CBM Collaboration 3 rd FutureDAQ Workshop GSI, Darmstadt, October 11, 2005.
1 Analysis of TOF data Yordan Karadzhov St.Kliment Ohridski University of Sofia.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
Wang Yi, Tsinghua University Joint meeting of HALL A and HALL C, SoLID status and Chinese contribution 1 Wang Yi Department of Engineering.
24/03/2011P.-A. Loizeau – Univ. Heidelberg The CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni Heidelberg DPG 2011, Münster.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
1 “Fast FPGA-based trigger and data acquisition system for the CERN experiment NA62: architecture and algorithms” Authors G. Collazuol(a), S. Galeotti(b),
PADI status Mircea Ciobanu 11 th CBM Collaboration Meeting February 26-29, 2007, GSI FEE1 PADI.
Jochen Frühauf CBM-Collaboration Meeting
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
CBM Software Workshop for Future Challenges in Tracking and Trigger Concepts, GSI, 9 June 2010 Volker Friese.
First results from PADI-2 Mircea Ciobanu CBM Collaboration Meeting March 10 –13, 2009 GSI-Darmstadt FEE1.
Third workshop on hadron physics in ChinaWang Yi, Tsinghua University A conceptional design of SOLID-TOF Outline: Development of low resistive glass and.
Frank Lemke DPG Frühjahrstagung 2010 Time synchronization and measurements of a hierarchical DAQ network DPG Conference Bonn 2010 Session: HK 70.3 University.
DABCDABC J. Adamczewski-Musch, H.G. Essel, S. Linev Software development for CBM DAQ J. Adamczewski-Musch, H.G. Essel, S.
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
Ingo DeppnerDPG-Frühjahrstagung, Mainz, A Multistrip-MRPC Prototype for the CBM Time-of-Flight Wall Outline: CBM-ToF requirements Conceptional.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
Summary DAQ Walter F.J. Müller, GSI, Darmstadt 12 th CBM Collaboration Meeting 17 October 2008.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
STaRBoard Jamal Rorie 5/09/06 Physics 476. Why do we need ToF info? Used to determine species of particle –Central Drift Chamber records path –ToF records.
Status DAQ Walter F.J. Müller, GSI, Darmstadt for the CBM Collaboration 14 th CBM Collaboration Meeting Friday, 9 October 2009.
Results from first beam tests for the development of a RICH detector for CBM J. Eschke 1*, C. Höhne 1 for the CBM collaboration 1 GSI, Darmstadt, Germany.
R&D for single gap -Use the HARDROC ASICs, SiGe technology (well tested and available) HARDROC : 64-channel, 2-bin readout (3 comparators, 3 thresholds),
CBM Collaboration Meeting, GSI Experimental features of strip-RPCs Motivation FOPIs Multistrip-Multigap-RPCs Results Conclusions.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
RPC Design Studies Gabriel Stoicea, NIPNE-HH, Bucharest CBM Software Week GSI-Darmstadt May 10, 2004.
DABCDABC ROC-based DAQ: latest developments and perspectives Jörn Adamczewski-Musch, Hans G. Essel, Sergey Linev GSI, Experiment Electronics: Data Processing.
Ingo DeppnerRPC 2012 Workshop, INFN, Feb A Mutistrip MRPC prototype for the CBM Time-of Flight wall Outline: Motivation / CBM-ToF Requirements.
Kevin Nash MaPSA-Light test system 1. The System 2.
TOFp Status Report Introduction: system overview Functional requirements Analysis status –track extrapolation & matching –start time –stop time –identified.
XIII workshop on RPC and related detectors. GENT university, Belgium, Feb Wang Yi, Tsinghua University 1 Development and test of real-size.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
Ingo DeppnerSTAR Regional Meeting at USTC Hefei Ingo Deppner Physikalisches Institut der Uni. Heidelberg CBM TOF prototypes STAR Regional.
Status of the Front-end-Electronics based on NINO ASIC for the Time-of-Flight measurements in the MPD V. A. Babkin, M.G. Buryakov, V. M. Golovatyuk, S.
C.Beigbeder, D.Breton, M.El Berni, J.Maalmi, V.Tocut – LAL/In2p3/CNRS L.Leterrier, S. Drouet - LPC/In2p3/CNRS P. Vallerand - GANIL/CNRS/CEA SuperB -Collaboration.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Results with the RPC system of OPERA and perspectives
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
– a CBM full system test-setup at GSI
Trigger System for a Thin Time-of-flight PET scanner
Performance studies of a single HV stack MRPC prototype for CBM
Department of Engineering Physics, Tsinghua University, Beijing, China
Beam detectors performance during the Au+Au runs in HADES
Jean-Sebastien Graulich, Geneva
AHCAL Beam Interface (BIF)
ETD meeting Electronic design for the barrel : Front end chip and TDC
Multigap Resistive Plate Chambers (MRPC)
PADI for straw tube readout and diamonds for MIPs and for high precision tracking beam test – Jülich, Feb Jerzy Pietraszko, Michael Träger, Mircea.
Conceptual design of TOF and beam test results
Status of n-XYTER read-out chain at GSI
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Update on SoLID-TOF Wang Yi Outline: Conceptual design of SoLID-TOF
High time resolution TOF for SoLID
Alexandre Camsonne January 13th 2015
Pierre-Alain Loizeau and David Emschermann for the CBM collaboration
TOF read-out for high resolution timing
Presentation transcript:

18/03/2010 DPG Bonn – March Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni Heidelberg People: GSI: M. Ciobanu, H. Deppe, H. Flemming, J. Frühauf, D. Gonzalez-Diaz, M. Kis, K. Koch, S. Linev, W. F.J. Müller KIP: N. Abel, U. Kebschull, S. Manz PI: N. Herrmann, P.-A. Loizeau, I. Deppner, K. Wisniewski

A demonstrator for the CBM Time of Flight wall electronic readout chain 2/10 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK Readout chain demonstrator design 1. Main requirements for the electronics Conclusion & Outlook 3. Current components of the demonstrator 4. Clock synchronization 5. First observations on the full chain

A demonstrator for the CBM Time of Flight wall electronic readout chain 3/10 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK Main requirements for the electronics ~75000 channels Global electronic time resolution < 30ps (TDC < 25ps) Self triggered system (Timestamp & Epoch markers) Compatible readout, synchronization and time domain with other detectors Low power consumption: < 60 mW/ch (~30mW/ch for both Analog and TDC) Rate per electronic channel, Au+Au at 25 AGev, mbias, 10 MHz interaction rate, field scaling = (from a simulation by A. Kiseleva) Information about the conceptual design: see I. Deppner talk in Session HK58

A demonstrator for the CBM Time of Flight wall electronic readout chain 4/10 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK Readout chain demonstrator design CLOSY2 + Distribution CLK250 CLK156 Sync TDC 156/250 MHz clock & SYNC_TDC distribution some aux dets SYNC message sender RPC Test Bench FOPI RPC Test Environment MBS System A ROC Eth A B SYNC-S AUX Opt R2F (AD1) CLK250 A B C D E F CLK156 G Sync TDC PADIGET4 PADIGET4 PADIGET4 PADIGET4 PADIGET4 PADIGET4 CBM M-RPC Demo 1 Start counter Data readout, Epoch synchronization check, first data aggregation DABC Online/ Offline Analysis GO4 FAIRROOT ABB Opt B PCIe Opt A PC Hybrid DAQ System: triggered + time-stamped Other systems: nXYTER, …

A demonstrator for the CBM Time of Flight wall electronic readout chain 5/10 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK Components: Front end Analog part: Fast Pre-Amplifier & Discriminator PADI project by M. Ciobanu at GSI-DetLab Performances: resolution <15ps rms Digital part: Free running High Resolution TDC GET4 project at GSI by H. Deppe & H. Flemming from GSI-EE: See first talk of this session Performances: ~25ps rms resolution, data readout >150 kHz/ch possible Clock System: Generate 2 low jitter phase coupled clocks and a synchronization signal for GET4 and ROC CLOSY2 (Cbm-cLOck-SYnthesizer) developed at GSI by K. Koch from GSI –EE

A demonstrator for the CBM Time of Flight wall electronic readout chain 6/10 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK Components: readout & aggregation ROC: FEB readout, first data processing, synchronization, FEB control SYSCORE v2 based solution Firmware developed at KIP by S. Manz: see previous talk Software environment: DAQ: DABC = Data Acquisition Backbone Core (HK49.1) Data analysis: GO4 = GSI Object Oriented On-line-Offline (HK30.2) Developed by J.Adamczewski-Musch, S.Linev, M.Al- Turany, D.Bertini & H.G.Essel (GSI - EE)

A demonstrator for the CBM Time of Flight wall electronic readout chain 7/10 18/03/ Clocks Synchronization Why so important? 2 free running systems with different clocks in CBM =>Event building! channels  ~19000 TDC chips with current design, with measure of each hit against the received clock! In the CLOSY2 system: Sync signal generated every 5th coincidence Correspond to 25 GET4 Epoch Correspond to 40 NXYTER timestamp cycle P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

A demonstrator for the CBM Time of Flight wall electronic readout chain 8/10 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK First observations on the full chain Assembled for the first time middle of February Using first version of the ROC firmware and an online analysis tool In a first time focus on hardware checks: -2 FEET-TDC & 3 FEET-PADI tested -Presence of all voltages & error messages -Clock system: Synchronization of the epochs between chips and between the 2 clock signals=> every 25 epochs Results: The readout of the chain using current versions of the electronic components and of the FAIR software environment is working 1 FEET-TDC board was operated successfully with all voltages at nominal value and no synchronization error messages

A demonstrator for the CBM Time of Flight wall electronic readout chain 9/10 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48 Conclusion  The full readout chain for the demonstrator of the CBM ToF wall is a project involving 4 different groups, with strong requirement on the time resolution  Each of its components showed performance meeting the requirements during individual tests  This readout chain is now assembled for the first time since a few weeks and tests just started Goals Building & testing a full demonstrator including a differential RPC, with 64 channels (32 strips), until end of 2010 Demonstration of the readout chain performance with different kinds of Multi-Gap Resistive Plate Chambers

A demonstrator for the CBM Time of Flight wall electronic readout chain 10/10 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48 Thank you for your attention

A demonstrator for the CBM Time of Flight wall electronic readout chain 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48

A demonstrator for the CBM Time of Flight wall electronic readout chain 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48 FEET-PADI CAEN v1290A Rising edge VME & MBS Readout System Closy2 CAEN v1290A Falling edge Splitter FEET-PADI VME readout and evaluation system (Pulser) Online/ Offline Analysis GO4 PC

A demonstrator for the CBM Time of Flight wall electronic readout chain 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48 some aux dets RPC Test Bench FOPI RPC Test Environment MBS System START CardTACQUILA HD M-RPC PMT PADITACQUILA + ToT board PADI TACQUILA + ToT board PADI PADI2 VME readout and evaluation system with TACQUILA system (BEAM) PAW PC

A demonstrator for the CBM Time of Flight wall electronic readout chain 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48 CLOSY2 CLK250 CLK156 Sync TDC 156/250 MHz clock & SYNC_TDC distribution A ROC Eth A B SYNC-S AUX Opt AD-1 (R2F) CLK250 A B C D E F CLK156 G Sync TDC FEET - PADI FEET - TDC Pulser RocUtils Online/ Offline Analysis GO4 PC System for the first full chain tests

A demonstrator for the CBM Time of Flight wall electronic readout chain 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48 Minimal Numbers of boards for each electronic layer per SM: FEET-PADIFEET-TDCR2F (AD-1)ROC Central Middle Middle Outer Total number of channels: ~75500! Total ROCs: ~710!

A demonstrator for the CBM Time of Flight wall electronic readout chain 18/03/2010 P.-A. Loizeau –DPG Bonn –March 2010 –Session HK 48