Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.

Slides:



Advertisements
Similar presentations
DIS 2008, London Transverse Spin Physics at PHENIX Douglas Fields (University of New Mexico) For the PHENIX Collaboration 4/9/20081 Douglas Fields for.
Advertisements

Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
RHIC/AGS User’s Meeting PHENIX Run-15 Goals and Status Douglas Fields University of New Mexico For the PHENIX Collaboration.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
PHENIX Run12 Spin John Koster RBRC RSC Meeting 2012/05/11.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Yosuke Watanabe….. University of Tokyo, RIKEN A, KEK C, Development of a GEM tracker for E16 J-PARC 1 Thanks to ???????????
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Run15 pp Achievement and pAu status Itaru Nakagawa RIKEN/RBRC.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Update on DHCAL and RPC progress Lei Xia ANL - HEP.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Status of TPC/HBD for PHENIX Craig Woody BNL DC Upgrades Meeting February 12, 2002.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
High Multiplicity Trigger Operation Status RIKEN/RBRC Itaru Nakagawa On behalf of Toru Nagashima, Aaron Key, SeYoung Han, Shoichi Hasegawa 1.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Study of J/  ->e + e - in d-Au Collision with Electron Triggers in PHENIX W. Xie (UC. Riverside) PHENIX Collaboration April APS in 2003.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Reduction of Background in Observation of W Decay Using the Forward Vertex (FVTX) detector at PHENIX Abraham Meles New Mexico State University APS April.
Muon Arm Physics Program Past, Present + Future Patrick L. McGaughey Los Alamos National Laboratory Santa Fe June 17, 2003.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
Reduction of background in observation of W – decay using FVTX tracker Abraham Meles New Mexico State University DNP2012 – Newport Beach, CA. Oct 25, 2012.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
PHENIX J/  Measurements at  s = 200A GeV Wei Xie UC. RiverSide For PHENIX Collaboration.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Ran HAN Peking University For PHENIX The Polarization of Anti-Lambda Produced In sqrt(s)=200GeV Polarized Proton-Proton Collision.
FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN16 Status Y. Akiba (RIKEN/RBRC) 2016/05/27 Radiation lab meeting.
RIKEN/RBRC Itaru Nakagawa
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
Muon Recording Studies and Progress for the MICE Tracker
Preparation of the CLAS12 First Experiment Status and Time-Line
Heavy Ion Physics in RUN14-16
Y. Akiba (RIKEN/RBRC) Radiation Lab meeting 2016/06/30
Presentation transcript:

Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico

Time Meeting 3/10/2015 Out of Gas (Ethane) We ran out of Ethane on Sunday. This means we have to turn off HV to our central tracking detectors (Drift Chamber, Pad Chamber), so lose our central HF physics, but we continue with our forward HF and continue commissioning MPC-EX (our two primary goals). Normally, we buy enough gas for the entire run before it starts, but the vendor changed the gas purity, and we wanted to verify that this wouldn’t negatively impact running, so we got a late start. We had an order placed (in time) for an emergency (expedited) delivery on the 4 th. It appears that a miscommunication was made in the purchasing process that changed this to a normal delivery. Airgas found a few more cylinders. We will be getting two today from NJ, two on Thursday and 9 by end of week from TX. The rest (7) will come from TX next week, followed by the tube trailer. Should be back in business after APEX on Wed. 12/10/2014Douglas Fields 2

Time Meeting 3/10/2015 Meanwhile… J/Psis in Forward Arms 12/10/2014Douglas Fields 3

Time Meeting 3/10/2015 FVTX Multiplicity Trigger 12/10/2014Douglas Fields 4 Slide from Wei Lei, Rice University

Time Meeting 3/10/2015 FVTX Multiplicity Trigger 12/10/2014Douglas Fields 5 Trigger : #track > Threshold ~ 3/4 active wedges Online Coarse Track

Time Meeting 3/10/2015 Trigger performance 12/10/2014Douglas Fields 6 >6 tracks >7 tracks >12 tracks

Time Meeting 3/10/2015 MPCEX update Progress last week – Updated firmware to solve start run issue (now reliable) – Integrator reset properly located in abort gap – First timing scan in north completed - clear MIP signal (next slide) – Zero suppression in DCM's (north and south) fully commissioned – Both North and South MPC-EX run successfully in big partition, analyzing data from extended timing scan Issues Remaining to be Addressed – Fine timing setup (with one BCLK) – Finalize setup of detector gains by layer – Commission multi-event buffering

Time Meeting 3/10/2015 ADC “Distrubutions” by layer in different timing runs (North) More hits in one configuration – narrows down the North timing to one beam clock

Time Meeting 3/10/2015 ADC “Distrubutions” by layer in different timing runs (South) More hits in one configuration – narrows down the South timing to one beam clock

Time Meeting 3/10/2015 PHENIX Efficiency 12/10/2014Douglas Fields 10

Time Meeting 3/10/2015 Goal Feb 23 projection Run-15 max Luminosity Progress RHIC projections ( gave Run- 12 achieved delivered luminosity as 9.3 pb −1 /week and 22 pb −1 /week max expected in Run-15 (after 5 weeks running). Converting to our recorded luminosity: 4.5 pb −1 /week and 10.1 pb −1 /week (for the |z| < 40cm program) and 1.6 pb −1 /week and 3.85 pb −1 /week (for the |z| < 10cm program) 12/10/2014Douglas Fields 11 Goal Run-12 Run-15 max Current Run-12

Time Meeting 3/10/2015 Summary Taking physics data for HF in Muon and Central arms. Should have central tracking back after APEX on Wed. New High Multiplicity trigger now in physics mode. MPC-EX could begin physics data taking (with single-event buffering) in the coming few days. 12/10/2014Douglas Fields 12

Time Meeting 3/10/2015 Backup 12/10/2014Douglas Fields 13

Time Meeting 3/10/2015 Progress Towards Physics Goals (p+p) Two physics programs: – Forward direct gamma physics with the MPC-EX 200 GeV with transverse polarization for 9 weeks [Physics driven goal is 50 pb −1 recorded within |z| = 60%] – Heavy Flavor physics using the F/VTX 200 GeV with transverse polarization for 9 weeks [Physics driven goal is 21 pb −1 recorded within |z| = 60%] In our BUP, ( &materialId=0&confId=764) we state that we assume PHENIX uptime 70%, fraction of events within +/- 10 cm (25%) and +/- 40 cm (70%). &materialId=0&confId=764 12/10/2014Douglas Fields 14