MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.

Slides:



Advertisements
Similar presentations
Bob MichaelsParity Collab. Mtg. May 17, `07 Integrating Compton DAQ and Analysis Bob Michaels with Reminder about Nov 2006 Results Specification of new.
Advertisements

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
GlueX Collaboration Meeting May 12-14, GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation.
Outline Experiments Setup and DAQ configuration Fastbus for SBS: performance and status GEn/GMn - trigger and DAQ GEp - trigger and DAQ GEM readout Outline.
Hall D Trigger and Data Rates Elliott Wolin Hall D Electronics Review Jefferson Lab 23-Jul-2003.
 Brief status update of DAQ/Trigger production hardware  Firmware development for HPS application  CLAS12 CTP ‘upgrade’ notes  Summary Status of the.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
TRIUMF Qweak Electronics Des Ramsay Nov Status of Electronics November, 2008  36 VME modules (# 001 and # ) delivered to JLab  001, 003,
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
Detectors and read-out DetectorNo. of ch.Read-out method Device candidates CsI(Tl)768Flash ADCCOPPER + 65 MHz FADC FINESSE Active Polarimeter600 x 12 x.
David Abbott - JLAB DAQ group Embedded-Linux Readout Controllers (Hardware Evaluation)
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
1 FADC Boards for JPARC-K Preliminary Proposal Mircea Bogdan November 16, 2006.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
Compton Trigger Design Update Tanja Horn Compton Working Group 6 June 2008.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
SoLID review DAQ recommendations Alexandre Camsonne.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
ECE 101 Exploring Electrical Engineering Chapter 7 Data Acquisition Herbert G. Mayer, PSU Status 11/30/2015 Derived with permission from PSU Prof. Phillip.
R. Michaels, JLAB PREX Mtg, July 2008 Compton DAQ (General) Remaining experts : Sirish Nanda, Alexandre Camsonne, me Recent Exercises Port to vxWorks 5.5.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
LUIS MERCADO UMASS 7/10/09 HAPPEX DAQ / 18-bit ADCs.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Hall A Moller Polarimeter DAQ Upgrade B. Sawatzky CNU 12 GeV Trigger Workshop July 8, 2010.
Digital Acquisition: State of the Art and future prospects
"North American" Electronics
ATLAS calorimeter and topological trigger upgrades for Phase 1
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Counting Mode DAQ for Compton
Iwaki System Readout Board User’s Guide
Data Acquisition (DAQ) Status
Hall A Compton Electron detector overview
Alexandre Camsonne August 27th 2016 SoLID collaboration meeting
VETROC for Edet DAQ Bob Michaels (presenting) Scott Barcus Alexandre Camsonne Ben Raydo and the GRINCH group (Todd Averett et. al.) Compton Meeting.
Example of DAQ Trigger issues for the SoLID experiment
BESIII EMC electronics
Hall D Trigger and Data Rates
JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
Mott DAQ Timing R. Suleiman February 12, 2014.
Alexandre Camsonne January 12th 2016 SoLID collaboration meeting
Alexandre Camsonne January 13th 2015
Alexandre Camsonne September 12th 2015 SoLID collaboration meeting
The CMS Tracking Readout and Front End Driver Testing
August 19th 2013 Alexandre Camsonne
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015

Overview of DAQ System Two separate DAQs, some signals (e.g. detectors) go to both. 1.Production mode integrates over helicity period 2.Counting mode for tracking studies and Q 2 Also: test stands for detectors, beamline, DAQ development, etc Trigger Supervisor (CODA) Detector VME Injector VME Beamline VME Online Farm / Event builder Tape Silo CODA Configs: crates alone or in groups expect ~6 crates ~ 1000 TByte 1 cpu Event Building 50 cpu online analysis 50 TB volatile disk 20 TB staging disk

DAQ Requirements Production mode zero deadtime at 2 kHz rate (helicity reversals) ADC channels, 5 MB/sec/crate x 6 crates Negligible contribution to noise (<< 200 ppm counting stats per azimuthal sector )  Similar to Qweak, but a higher data rate like CLAS Counting mode kHz trigger, depending on mode FADCs, regular ADCs, TDCs, I/O, scalers. R. Michaels, MOLLER Meeting, Aug, 2015

DAQ Strategy Production mode Capitalize on experience of Qweak, HAPPEX, PREX. Need to write specification for integrating ADCs and auxiliary electronics : timing control and I-to-V converter In the meantime, test setups can use Qweak or HAPPEX DAQ elements. Counting mode Prefer to avoid Fastbus. Deploy pipelining FADCs, VETROC. Also, scalers, I/O, etc. R. Michaels, MOLLER Meeting, Aug, 2015

From Qweak: TRIUMF VME integrator FPGA FPGA Prog/ Debug Ports VME Module Select Switches Status LEDs VME Access Ext Clock Enb Ext Gate Enb Ext NIM Gate Ext NIM Clock DC-DC Converter Analog Filters 8 inputs ADC See proposal for specification

From Qweak: TRIUMF VME integrator FPGA FPGA Prog/ Debug Ports VME Module Select Switches Status LEDs VME Access Ext Clock Enb Ext Gate Enb Ext NIM Gate Ext NIM Clock DC-DC Converter Analog Filters 8 inputs ADC Good module with excellent specs May improve design with modern chips ( obsolescence ) A faster readout is likely and desired (to increase from limit of 10 boards per crate) Need engineering support and a procurement strategy (current plan: TRIUMF ) A specification should be written. DAC noise not needed (given resolution and Shot noise)

Data Rates, Online Computing Needs 30 Mbytes/sec total = 10x Qweak rate Need >1 Gbit/sec network, ~1000 Terabytes of tape (MSS), and 20 Tbyte staging disk. 50 cpu farm to handle online tasks Real-time helicity-correlated feedback Online checks of data quality Prompt analysis of 100% of data with full corrections R. Michaels, MOLLER Meeting, Aug, 2015

Present Status of Parity DAQ in Hall A Crate in Counting Room is working good for beamline checkout, but no signals plugged in Two Qweak ADCs were added (thanks Rakitha Beminiwattha) together with HAPPEX ADCs, scalers, and I/O Plan to revive I njector Crate (Qweak) – by ~November R. Michaels, MOLLER Meeting, Aug, 2015 Testing Qweak ADCs with a few-volt ramping function  ADC value Event # glitch

A Fast Counting-Mode DAQ for Compton, but a precursor for MOLLER needs. VETROC CTP (FPGA) Logic signals (128) Trigger JLab FADC Integrate threshold ADC channel Sample number Deployed in Hall A plan is to commission it this Fall if we have opportunity Based on JLab FADC together with scalers and I/O. VETROC -- pipelining TDC (s) whose hits form trigger in a CTP (readout at >200 kHz, trigger formed at ~1 MHz) -- VETROC under test by Scott Barcus (W&M student; advisor Todd Averett) + Bryan Moffit and Ben Raydo

Conclusions -- MOLLER DAQ (thanks, Paul King, for valuable inputs) Extrapolating from successful DAQ experience from JLAB PV Experiments Need integrating DAQ, counting DAQ, and small test stands Excellent Qweak ADCs and I-to-V are good baseline designs, need an updated specification and a plan (new components, engineering support, procurement strategy) Data rates ~10x Qweak: Looks manageable with anticipated hardware (VME, network, multicore PCs, tapes), but need to keep up with 100% prompt analysis ` R. Michaels, MOLLER Meeting, Aug, 2015