Experimental Areas Technical Meeting, 3 June 2014 CLOUD office and meeting room Antti Onnela, PH-DT, CLOUD Technical coordinator and GLIMOS Experimental.

Slides:



Advertisements
Similar presentations
CLOUD Financial Review Committee meeting #3 1 October 2014 Financial plan for 2014 and beyond 1 Oct 2014, indico: rd FRC meeting, Antti Onnela,
Advertisements

Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Cosmic Ray Research in the Rochester Area Susen Clark PARTICLE lead teacher Bioscience & Health Careers H.S. at Franklin Professor Kevin McFarland, University.
The Catholic Community of St. Thomas More New Building Committee.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
CLOUD Financial Review Committee meeting #1 Financial plan for 2012 and beyond Proposal for cost sharing between CLOUD institutes for approval by the FRC.
European Metrology Research Program (EMRP) MeteoMet Project (October 2011) WP3. Traceable measurements methods and protocols for ground based meteorological.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Status and Plans of the CLOUD Experiment Urs Baltensperger Laboratory of Atmospheric Chemistry Paul Scherrer Institute, 5232 Villigen, Switzerland SPSC.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
Long-Baseline Neutrino Facility LBNF Summary of FSCF Final Design Parameters Meeting at SURF, 10 Aug 2015 Elaine McCluskey, LBNF Project Manager EFIG 19.
Proposal for the CLOUD experiment; Cosmic Ray – Aerosol – Cloud - Climate Interactions Markku Kulmala University of Helsinki Department of Physical Sciences.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
FILM DISCUSSION CARD 2. OUTREACH PLANNING WHAT IS OUTREACH PLANNING? Outreach planning is a process using various tools that facilitate individual.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
CERN Report (II) Rolf-Dieter Heuer ECFA Meeting Frascati 1 July
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
An introduction to Energy aspects at CERN June 2014.
Experimental Areas Technical Meeting EATM, 1 Sep 2015 CLOUD news Antti Onnela, PH-DT, CLOUD Technical and Resource coordinator, GLIMOS
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Welcome to the PRECIS training workshop
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
1 Ukraine Higher Education Final conference Kiev 12 November 2015 European Investment Bank 03/02/2016.
ENLIGHT,12/2/20021 Health and Science, can CERN contribute? The Mission of CERN (1954): “The Organization shall provide for collaboration among European.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
PH-EDU Education lab in Bat Space Policy Board Meeting 17 November 2011.
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 OUTLINE 1.Status 2.Preliminary conclusions of the CNGS Review Board (30.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
DT2 Scientific Tea CLOUD Technical Challenges Antti Onnela PH / DT2.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
MODULAR CONTAINERS OF SANDWICH PANELS. At the present, more and more increasing significance of modular construction. Every year modular houses from sandwich.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
IDEA  PROJECT Create an idea to a project
Aerosols, Clouds and Trace gases Research Infrastructure
High School study space committee report
The CLOUD experiment Cosmics Leaving Outdoor Droplets
WP13: Access to Plasma Beam testing facilities
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
4th FRC meeting, Antti Onnela, CERN-PH-DT
2S module geometry updates Module positioning concepts
User instrument policy
HL-LHC upgrade at IPHC news
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Presentation transcript:

Experimental Areas Technical Meeting, 3 June 2014 CLOUD office and meeting room Antti Onnela, PH-DT, CLOUD Technical coordinator and GLIMOS Experimental Areas Technical Meeting, 3 June CLOUD office and meeting room Antti Onnela, PH-DT, CLOUD Technical coordinator and GLIMOS

CLOUD experiment CERN Austria:University of Innsbruck University of Vienna Finland:Finnish Meteorological Institute Helsinki Institute of Physics University of Eastern Finland University of Helsinki Germany:Johann Wolfgang Goethe University Frankfurt Karlsruhe Institute of Technology Leibniz Institute for Tropospheric Research Portugal:University of Beira Interior University of Lisbon Russia:Lebedev Physical Institute Switzerland:Paul Scherrer Institute Tofwerk AG United Kingdom:University of Leeds University of Manchester United States:Aerodyne Research Inc. California Institute of Technology Carnegie Mellon University Studies the influence of galactic cosmic rays on the Earth's climate through the media of aerosols and clouds. Uses CERN’s PS T11 beam as artificial ‘cosmic rays’, up to 100x natural levels. Multi-disciplinary collaboration of 20 partners from 8 countries: EATM Meeting, 3 June 2014 / CLOUD, A.Onnela2

CLOUD in the PS East Hall EATM Meeting, 3 June 2014 / CLOUD, A.Onnela3

CLOUD in the PS East Hall EATM Meeting, 3 June 2014 / CLOUD, A.Onnela4 Note that between runs all measurement instruments return to their home institutes for other campaigns.

CLOUD experiment 2006: Approved as CERN experiment Technical pre-run with a 8 m 3 chamber in the East Hall T11 area : Design and construction of 27 m 3 aerosol chamber Modification of East Hall T11 area to accommodate the chamber, its supplies and measurement instruments Until now 8 beam-runs of 1-3 months. 9 th in autumn EATM Meeting, 3 June 2014 / CLOUD, A.Onnela Continuous upgrades between beam-runs: Gas system and its controls Thermal system (-70C operation, temperature measurements) UV-systems Additional / improved measurement instruments RunMonthYearAim CLOUD1Nov–Dec2009Commissioning CLOUD2Jun–Jul2010Binary H 2 SO 4 and NH 3 ternary nucleation CLOUD3Oct–Nov2010Binary H 2 SO 4 and NH 3 ternary nucleation CLOUD4Jun–Jul2011Dimethylamine & pinanediol ternary nucleation CLOUD5Oct–Nov2011Free tropospheric binary H 2 SO 4 & NH 3 ternary nucleation CLOUD6Jun2012Initial cloud formation (cloudy) experiments CLOUD7Oct–Dec2012NH 3, dimethylamine & alpha-pinene ternary nucleation & growth CLOUD8Oct-Dec2013Low H 2 SO 4 nucleation & cloudy expts. (aqueous phase & ice, with GCRs – no PS) CLOUD9Sep-Nov2014Cloudy experiments (aqueous phase & ice) & small ion studies 5

CLOUD experiment CLOUD is a unique research facility, combining: High-energy particle beam State-of-the-art aerosol chamber: o Temperature stability: <0.1°C o Temperature range: from -70°C (in 2015: -90°C) to +30°C; cleaning at +100°C o Surface cleanliness: <10 pptv (10 x ) organics contamination, stainless steel (and gold), no teflon, no O-rings o Ultrapure gas supplies o UV system: negligible heat load by use of fibre optics o Field cage 30 kV/m Best suiting measurement instruments brought from the institutes for each run. CLOUD’s scientific potential is proven to be very high o Results published in Nature 2011 and 2013, Science 2014, and several scientific proceedings. The field of studies ahead is large o Scale: Further 10 years Bottle-neck of CLOUD activities at CERN: lack of office and meeting room space. o CLOUD team has grown in number of scientists resident at CERN or visiting during runs o Daily run coordination meetings are crucial and need to involve also people off CERN. EATM Meeting, 3 June 2014 / CLOUD, A.Onnela6

Space available / needed Space currently available for CLOUD T11 beam area T11 control room Cryogenic fluid and gas storages outside East Hall Shared material storage space inside East Hall (for heavy equipment like racks) Small storage room in the basement of building 13 (for delicate equipment) 3 offices on temporary loan from PH-DT group in building 17, used by 6 CLOUD fellows and students o The PH-DT group needs to get these offices for their use. Space needed Office space for the 6 fellows and students resident at CERN. Office space for scientists visiting CERN during beam runs. o Must be close to T11 Meeting room o Daily data analysis and run planning meetings during data taking campaigns, with up to 30 participants + Videoconferencing equipment to involve scientists off CERN. Must be close to T11. o Weekly technical and physics meetings for CERN team, including videoconferencing with the CLOUD Analysis Working Group members in other institutes. EATM Meeting, 3 June 2014 / CLOUD, A.Onnela7

What could be the solution? 1.Existing space from PH department? o NO. Requested since the beginning of CLOUD. Due the general lack of space no solution has been found. With the growing number of CERN users (essentially in PH department) the situation does not seem to improve. 2.Existing space from some other department? o VERY UNLIKELY. The Meyrin area close to T11 lacks office and meeting space in general. o Let me know if there are opportunities! 3.A new, small building at the proximity to the East Hall? One single multi-purpose room addressing all space needs: o Open office for the CLOUD fellows and students resident at CERN, as well as for visiting scientists. o Meeting room for daily data analysis and run planning meetings during measurement campaigns, and for weekly technical and physics meetings for CLOUD CERN team. EATM Meeting, 3 June 2014 / CLOUD, A.Onnela8

Possible solution? EATM Meeting, 3 June 2014 / CLOUD, A.Onnela Here an example: bat made of 2 pre-fabricated units at LHCb site (LHC Point 8) - Full dimensions 6 m x 7.5 m - Open space, modulates between meeting and office use. 9

Possible location for a bungalow? EATM Meeting, 3 June 2014 / CLOUD, A.Onnela Must be close to T11 where all work takes place, in particular during measurement campaigns. For radiation protection reasons cannot be inside bat 157 Following initial discussions involving Raul Fernandez Ortega (GS-SE), Lau Gatignon (EN-MEF), Michael Lazzaroni (EN-MEF, TSO of 157), Antti Onnela and Robert Kristic (CLOUD) the area between bat 512, 251 and 352 seems best suited. T11 ???? 10

New “bat 657” ? EATM Meeting, 3 June 2014 / CLOUD, A.Onnela11

New “bat 657” ? EATM Meeting, 3 June 2014 / CLOUD, A.Onnela12

New “bat 657” ? EATM Meeting, 3 June 2014 / CLOUD, A.Onnela13 Doors

New “bat 657” ? EATM Meeting, 3 June 2014 / CLOUD, A.Onnela14 ~ 6 m x 6 m Initial cost estimate: 50 kEuro, including foundations and electricity. Use existing sanitary facilities in b. 512 (already used from East Hall)

Summary CLOUD has no access to adequate office and meeting room space. Particularly problematic during beam runs. Time scale of the need: 10 years. The office/meeting space needs to be close to East Hall / T11. No solutions amongst existing facilities has been found. A multi-purpose open-space office/meeting room would be a well-matching solution. Preliminary study of a new “building 657” located close to East Hall. Now going through involved technical parties: o East Hall TSO and Radiation protection: a priori OK. o Experimental Area Technical Meeting: Today. o PH Space Policy Board SPOB: To be done. o Others? Financing to be agreed. Consider also rental. o Investment cost estimated at ~50 kEuro, including foundations and electricity. EATM Meeting, 3 June 2014 / CLOUD, A.Onnela Thank you for your attention. Comments, feed-back ? 15

Spare slides EATM Meeting, 3 June 2014 / CLOUD, A.Onnela16

CLOUD systems EATM Meeting, 3 June 2014 / CLOUD, A.Onnela Large size beam 17

Slow data collection rate in CLOUD The measured processes are slow. Typically only few data points collected per beam day; All beam days are precious. EATM Meeting, 3 June 2014 / CLOUD, A.Onnela18

CLOUD Facility Aerosol chamber (27 m 3, ultra-high cleanliness) Platforms at chamber mid-level and top Beam and cosmic ray hodoscopes Thermal housing and ventilation system Thermal measurement and control systems UV systems Gas and water supply and control systems Dewars and Gas supply racks (located outside East Hall) Expansion system Electrical supplies, including HV. DAQ and on-line monitoring systems (in the T11 counting room) Thermally controlled racks for measurement instruments EATM Meeting, 3 June 2014 / CLOUD, A.Onnela19