9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.

Slides:



Advertisements
Similar presentations
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
Advertisements

March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Module production at Heidelberg Responsibilities: assembly and test of 60 F- modules (5 m) September 28: Series module # 12 finished  20% reached Full.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
13 Oct 2006Ageing Meeting Geneva, Niels & Gras1/15 NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry,
19 Oct NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry, gas tightness, gain? Q2: Effect.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
9 Jan Ageing History 2005 Niels, Gras, Eduard & Sebastian 18 January 2006 TestModWireDateSourceCurrent/st raw DurationTests 90 Sr Scans I002A24L20-31.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
Status report on studying and preventing ageing in the LHCb OT S.Bachmann (on behalf of the LHCb OT group) Physikalisches Institut Heidelberg Many thanks.
Test of HV Prototype Boards for LHCb Outer Tracker NIKHEF, Amsterdam The Netherlands
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
1 Status of module production in Warsaw (1) Module number Panel A number Panel B number # of exchanged wires A/B # of shorts A/B Gas test (Δp/1min) Production.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
HV boards 1.FIRST ASDBLR HV PROTO BOARD: leakage currents on 100nA CH, humidity at cern. 2. TRIAL 1 Encapsulate caps in Printed Circuit Board C schock,
22 Aug Ageing studies: the Miracle HV training.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
19/5/2004LHC-b OTR PRR1 Schedule and Resources Jan Spelt.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Service channels between Tracker and PP1
Jack Fowler Duke University Spain Workshop
Long irradiation at the side
Mini-drawers, FE-ASIC , Integrator
G. Carboni for the Muon Group
Ageing workshop - N.Tuning
WELCOME.
LHC-b Outer Tracker module production
Hybrid & Module Testing Status
Hi-pot results summary
Presentation transcript:

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress  Quality Assurance

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 2/19 Module Production at NIKHEF Courtesy of Jan Spelt

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 3/19 50% Milestone met 15/05/2003: EDR (Engineering Design Review) 02/2004: 10% prod. 04/2004: EDR (Electronics Design Review) 05/2004: PRR (Production Readiness Review) 03/2005: 50% prod. 12/2005: 100% prod

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 4/19 Module Production at NIKHEF (1) ModuleDateLogbook 0AprilGas Tightness 1MayCurved panels discovered 2-3JuneSelf-sustained currents 4JulyChanged to Ar/CO 2 70/30 5JulyDiscovered bad wire quality 6-8AugustOK 9AugustChanged threshold HV in air 20  100 nA 10-15SeptemberOK 16OctoberSecond team of (Russian) technicians started 17-18OctoberOK 19OctoberObserved loose soldering connections 20OctoberOK 21NovemberDouble glue on side walls 22-25NovemberOK 26-30NovemberLow response on 1side 29NovemberBad wire quality in HV in air, and tripping Sr scan 30DecemberBad wire quality in HV in air, and tripping HV in gas 31DecemberBeing build today 32NovemberPanel glueing with ropes Poor man’s logbook

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 5/19 Module Production at NIKHEF (2) ModuleDateLogbook 32-38DecemberOK 39JanuaryUse 90 Sr point source 40-48JanuaryOK 49-57FebruaryOK 58March4 broken wires 59-60MarchOK Poor man’s logbook

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 6/19 Module Production at NIKHEF (3) Production process: some minor problems:  Watch glue on connectors  Module 58: 4 broken wires  Module 59: peculiar wire response

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 7/19 Glue on Connector (1) Traces of glue. Affects leakage current for wires 1 and 64 (~20-100nA)

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 8/19 Glue on Connector (2) Traces of glue. Affects leakage current for wires 1 and 64 (~20-100nA) Discovered on Heidelberg modules 21 and 22 8 channels with high currents (10 – 270 nA) Checked at NIKHEF: found 6 wires 64L: M16A M19A M26A 1L: M20A M26A M41B Investigated influence of humidity on M16 and M19: 1)measure current after production; 2)measure current after drying; 3)put module in cold, wet environment (= outside); 4)measure current; 5)scratch of glue; 6)measure current. After production DryingCoolingHumidityScratching Date26/10/200416/02/ /02/2005 Time10:0016:0010:0017:00 M16A, ch 64L 7 nA0.5 nA5 nA15 nA0.2 nA M19A, ch 64L 8 nA0.3 nA23 nA1.9 nA0.1 nA

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 9/19 Broken wires in Mod 58 Discovered 4 broken wires in Mod 58 History:  23 Feb Wired full panel  24 Feb 50U broken  01 Mar 60U broken, just before gluing module  04 Mar 56U short circuit  07 Mar 55U short circuit after shaking the module Hypothesis:  Middle print tilted ? ?

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 10/19 Selection of 10% spares We foresee 10% spares Which ones would we select as spares? How many bad channels are we left with?

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 11/19 Quality Criteria Not used in quality criteria now:  HV in air : correlated to the 90 Sr numbers  HV training : correlated to the 90 Sr numbers  Wire Tension: OK. Ignore modules 5012 and 0…  Consider only modules 1-60 Number of bad wires from 90 Sr scan. Define bad:  Low response: <15% on average Typically disconnected due to tripping HV supply  High response: >15% on average Typically noisy  High response: >100% at any place on the wire Spikes Self-sustained currents Missing wire locators

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 12/19 Module Data (1)

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 13/19 Module Data (2)

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 14/19 Module Data (3) Module 60 about to be scanned… Just found peculiar wire in Mod 59:  Low current, then self-sustained current  Being investigated  90 Sr source Position  Current Wire locator position

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 15/19 Module Selection NMod<15%>15%>100%TotalComment “Disconnected”“Noisy”“Suspicious” Self-sustained currents Bad wire Bad wire Broken wires The rest77317 Out of 55*256 channels = 1.2‰ Selection of 6 worst modules:

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 16/19 The worst modules from the rest… Probably module 16, 26 or 30: NMod<15%>15%>100%TotalComment Rest54211 Out of 55*256 channels = 0.8‰

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 17/19 Special Tests Weighing all panel and module components  Calculate X/X 0 Survey of module flatness  Requirement: dZ < +/- 500 um  Result: dZ < +/- 400 um Humidity of modules  Compare in-leak between leaky and gas-tight module  Confirm gas-tightness requirements see Peter LHCb in preparation LHCb

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 18/19 Summary Production:  Only minor changes in production process Only minor changes in production process  Satisfactory production speed Satisfactory production speed Wire quality very good now Gas tightness OK, with occasional leaky exceptions 17 bad channels in best 90% of the modules = 1.2 ‰ 11 bad channels in best 85% of the modules = 0.8 ‰

9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 19/19 References LHCb week September 2004, Chia  Scan of 4 Warsaw modules Scan of 4 Warsaw modules  NIKHEF – Results Mod 0-10 NIKHEF – Results Mod 0-10 LHCb week December 2004, CERN  NIKHEF - Module glueing, Connector soldering NIKHEF - Module glueing, Connector soldering OT meeting February 2005, Warsaw  NIKHEF - Module selection 1-50 NIKHEF - Module selection 1-50 All quality plots for each module can be found here: /