October 2005 Qweak Collaboration Meeting Detailed Design of Shield House and Collimators wrt Backgrounds Yongguang Liang Just getting started – will probably.

Slides:



Advertisements
Similar presentations
CBM Calorimeter System CBM collaboration meeting, October 2008 I.Korolko(ITEP, Moscow)
Advertisements

Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Joanne Beebe-Wang 7/27/11 1 SR in eRHIC IR Synchrotron Radiation in eRHIC IR and Detector Background Joanne Beebe-Wang Brookhaven National Laboratory 10/
1/22 MOLLER Juliette M. Mammei. 2/22 Working Groups Polarized Source Hydrogen Target Spectrometer Integrating Detectors Tracking Detectors Polarized Beam.
Introduction Secondary electron secondary electron detector The electron beam interaction with near surface specimen atoms will make a signal which results.
E : HRS Cross Section Analyses Vincent Sulkosky Massachusetts Institute of Technology GMp Collaboration Meeting September 24 th, 2012.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Particle Production of a Carbon/Mercury Target System for the Intensity Frontier X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Spring.
Pion yield studies for proton drive beams of 2-8 GeV kinetic energy for stopped muon and low-energy muon decay experiments Sergei Striganov Fermilab Workshop.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
RF background, analysis of MTA data & implications for MICE Rikard Sandström, Geneva University MICE Collaboration Meeting – Analysis session, October.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Beijing, Feb 3 rd, 2007 LEPOL 1 Low Energy Positron Polarimetry for the ILC Sabine Riemann (DESY) On behalf of the LEPOL Collaboration.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
NEW COMMENTS TO ILC BEAM ENERGY MEASUREMENTS BASED ON SYNCHROTRON RADIATION FROM MAGNETIC SPECTROMETER E.Syresin, B. Zalikhanov-DLNP, JINR R. Makarov-MSU.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
HPS Beamline: Background Rates, Sensitivity to Field Uncertainties M. Ungaro1HPS Collaboration Meeting, JLAB, May Concrete Wall thickness Study.
Integrated Radiation Measurement and Radiation Protection of BES Ⅲ Zhang Qingjiang, Wu protection group, accelerator center, IHEP,
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Detector Monte-Carlo ● Goal: Develop software tools to: – Model detector performance – Study background issues – Calculate event rates – Determine feasibility.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
ECAL PID1 Particle identification in ECAL Yuri Kharlov, Alexander Artamonov IHEP, Protvino CBM collaboration meeting
Photon Flux Control Liping Gan UNCW. Outline PrimEx-  experiment requirement Tagged photon Procedure to obtain the number of tagged photons Relative.
E.C. AschenauerFebruary Inclusive Structure functions in eA or why momentum resolutions are important E.C. Aschenauer February How to extract.
DVCS – Hall A Study of the Background Noise HUGS 2008 Florian ITARD.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
The Q Weak Experiment Event tracking, luminosity monitors, and backgrounds John Leacock Virginia Tech on behalf of the Q Weak collaboration Hall C Users.
Interaction Region Issues M. Sullivan for the EIC User Group Meeting Jan. 6-9, 2016.
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
L. Keller 3/18/02 Beam-Gas-Bremsstrahlung and Coulomb Scattering in the NLC Beam Delivery System Conditions for Calculation: 1. Program is DECAY TURTLE.
IHEP/Protvino for FP420 R&D Collaboration 1 IHEP/Protvino Group: Igor Azhgirey Igor Bayshev Igor Kurochkin + one post-graduate student Tools:
The Luminosity Calorimeter Iftach Sadeh Tel Aviv University Desy ( On behalf of the FCAL collaboration ) June 11 th 2008.
1 LumiCal Optimization Simulations Iftach Sadeh Tel Aviv University Collaboration High precision design May 6 th 2008.
Mu to e Meeting BNL, June 2006 Extinction requirement relaxation (Kevin O’Sullivan) Stopping Target Geometry (Cenap Ozben, David Morse) Yannis Semertzidis.
11 GeV PV MøllerDetector Considerations 11 GeV PV Møller Detector ConsiderationsBRAINSTORMING JLab Workshop August 2008 Michael Gericke and Dave Mack.
Eduardo Nebot del Busto (1) CERN, Geneva, Switzerland (2) The University of Liverpool, Department of physics, Liverpool, U. K (3) The Cockcroft Institute,
SoLID Background Update Zhiwen Zhao UVa 2013/11/08 1.
Hall C Summer Workshop August 6, 2009 W. Luo Lanzhou University, China Analysis of GEp-III&2γ Inelastic Data --on behalf of the Jefferson Lab Hall C GEp-III.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Initial Study of Synchrotron Radiation Issues for the CEPC Interaction Region M. Sullivan SLAC National Accelerator Laboratory for the CEPC14 Workshop.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Further SR Studies for the Electron Polarimeter M. Sullivan for the JLEIC Collaboration Meeting Oct. 5-7, 2016.
R.W. Assmann, V. Boccone, F. Cerutti, M. Huhtinen, A. Mereghetti
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
Forward Tagger Simulations
CLAS12 Beamline Configurations
Electron Beam Therapy.
IHEP group Shashlyk activity towards TDR
Geant3 Simulation of Shielding for “sheet of flame” Background
Why Consider a Toroid Spectrometer Built Around Existing Hardware?
Final Focus Synchrotron Radiation
Update on GEp GEM Background Rates
Polarized WACS Experiment (E ) Using Compact Photon Source (CPS)
Monte Carlo studies of the configuration of the charge identifier
Jin Huang Los Alamos National Lab
RICH detector for CLAS12 … continue to explore feasibility of proximity focusing RICH in LTCC sector(s) INFN-Rome and ISS CLAS12-RICH Working Group Meeting.
Interaction Region Design Options e+e- Factories Workshop
Higgs Factory Backgrounds
SoLID SIDIS He3 target collimator optimization
Update on Ecal simulation
Background Simulations at Fermilab
SR Update for JLEIC June 8, 2017
Presentation transcript:

October 2005 Qweak Collaboration Meeting Detailed Design of Shield House and Collimators wrt Backgrounds Yongguang Liang Just getting started – will probably take months to finalize! 1.Shield wall and entrance window design 2.Strategy for detailed design of collimator: 2 bounce system 3.Summary

October 2005 Qweak Collaboration Meeting Possible Backgrounds Include background from target windows, beam pipe, collimators, … background from secondary reactions (Compton scattering Bremsstrahlung process, multiple scattering, …) background from inelastic reactions and Moller scattering Only ep-elastic scattering in target and consider secondaries

October 2005 Qweak Collaboration Meeting Shield Wall and Window Design Goal: Minimize soft backgrounds near region III chamber while not introduce noise or dilution from showers Consider: 1.Location, material, and thickness of the shielding wall location of main torus and region III chamber  Z= cm 10 radiation lengths normal shielding concrete  least 1.0 m thick MAX space ~ 70 cm 2. Shape and size of shielding entrance window Found we must address more basic issues (such as the source of the upstream background, design of a “two bounce system”) before we can design a suitable entrance window.

October 2005 Qweak Collaboration Meeting Comparison of 0.5 m Wall to 1.0 m Wall case Red: charged particles (mostly e-) Blue: neutral particles (mostly photon) 0.5m wall 1.0 m wall

October 2005 Qweak Collaboration Meeting Source of Photon Background that hits the Quartz and Deposits > 5 MeV Energy Primary collimator X vs Z x vs z y vs z

October 2005 Qweak Collaboration Meeting Photon Background (continued) Significant amount of  background from shower leakage at primary collimator E  > 5 MeV  signal at Quartz. Based on VPI “final” primary collimator  background ~0.08% But these studies: only ep elastic in target in the first octant Consider eight octants and inelastic reactions  get larger AND difficult to measure Reduce this background with “Two Bounce System” ie quartz NO direct line of sight to  source

October 2005 Qweak Collaboration Meeting View of Spectrometer from the Quartz Looking upstream from Quart location along the central scattered electron trajectory: we see * inner lips of the primary collimator opening (yellow) Qweak spectrometer is a “one bounce” system. Modified to “two bounce” system in later slide

October 2005 Qweak Collaboration Meeting Another view of the Spectrometer Looking upstream from left edge of quartz to the spectrometer: See *adjacent octant opening, *minitorus(violet), *upstream cleanup collimator (green).

October 2005 Qweak Collaboration Meeting Block line of sight between quartz and primary collimator

October 2005 Qweak Collaboration Meeting Demonstration of “Lintel Collimator” 60 cm downstream of Downstream Cleanup Collimator Looking upstream from Quart location along the central scattered electron trajectory with * “lintel collimator” * primary collimator thickness cm  5.25 cm Defining collimator barely seen

October 2005 Qweak Collaboration Meeting From Left Edge of Quartz with “Lintel Collimator” 60 cm downstream of Downstream Cleanup Collimator

October 2005 Qweak Collaboration Meeting Elastic Collimator Detailed Design Strategy Reduce  background from the defining collimator  two bounce system 1. Change primary collimator from Lead to Tungsten (W- Cu) Reduces the background from 0.08% to 0.04% 2. Cost management: reduce primary collimator thickness cm  5.25 cm AND this 15 radiation lengths is sufficient 3. Cantilever a lintel from downstream collimator to block line of light between quartz and defining collimator 4. Move defining collimator slightly upstream if necessary (?) 5. Optimize primary collimator tilt angles (both x and y directions) 6. Finalize upstream cleanup and beam-defining collimation Iterate with region I, II, III folks, VPI acceptance folks, and Neven to make sure we DON'T break anything. Finally, Neven's background simulation needs to be repeated with the final collimator configuration.

October 2005 Qweak Collaboration Meeting Summary * We are just getting started on the detailed collimator design with respect to backgrounds using the outlined strategy * General shape of elastic e envelope will not change * Work in Progess!