Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
0ATLAS Pixel Mechanics meeting at LBNL 13 April 2000 P.Netchaeva, INFN/Genoa Study of bump stresses The aim of this study is to check the effect of stresses.
HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
CALICE: WP4 Thermal and Mechanical Roger Barlow Cambridge 10 September 2005.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
RO400FC Forced convection hot air reflow oven. In a flexible production, what do you need for soldering of  Complex PCB’s  Soldering of fine pitch on.
Hybrid Integrated Circuit
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Ray Thompson, Julian Freeston, Andy Elvin WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Manchester Qualification M-O-048. Mechanical dummy. Check that tuning of alignment parameters had correct sign and adjustment of transfer chucks Z was.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Ray Thompson Calice meeting Mar 07 Ray Thompson WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise Atlas SCT experience effort weighted to latter.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
Low Mass Rui de Oliveira (CERN) July
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
Hybrid Mechanical/Thermal Design FP420 Ray Thompson Julian Freestone, Andy Elvin.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
ATHENA - Module Construction P. Riedler, J. Rochet.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
ATLAS pixel module assembly flow
T. Bowcock University of Liverpool
Ladder Assembly All tools and jigs produced Glue dispensing works
Update on Module Mounting on Staves and Stavelets and a description of how the new system will work 11/7/11.
Hybrid Issues.
Ladder Assembly All tools and jigs produced Glue dispensing works
Step-by-step assembly instructions
Equipment for Assembly – UK Experiences
Hybrid Mechanical/Thermal Design ideas
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Module/Ladder Assembly
Pixel module assembly tooling
Presentation transcript:

Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06

Detector assembly

Started assembling components for first mechanical /thermal prototype tests 1.25 mm carbon-carbon plate thinned to 0.5mm in centre- 5mm plate on order

Corner of Atlas wafer showing fiducial dots Hybrid Fiducials Stick off cuts on each hybrid in staggered fashion so all hybrid fiducials visible through end plates Survey entire stack detector to hybrid fiducial - hybrid fiducial to hybrid fiducial each measurement 1 micron so 1 detector to another detector on another hybrid 2 micron

Detector Positioning on Hybrid Adapt atlas assembly stages to position detectors on both sides of hybrid relative to dowel holes. 3 detectors on one hybrid relative to each other - aim for positioning +/- 5 micron ( sigma 2.5 micron) - survey on one face each measurement sigma 1 micron Positioning Hybrid to hybrid via precision washers stuck to hybrid and dowels hole tolerance to 3010 microns +/- 5 micron Stability after temp cycle ?????? 50mm x 40 deg x = 10 micron Flatness

Atlas Sct Assembly stages Microscope camera xy  translation stages

 X Y Vac chuck Translation stages Turn plate + locating dowels Microscope xyz travel Auto focus + pattern recognition Detector 1.Place detector on chuck - locate fiducially -translation stages align relative to transparent fiducials on turnplate Detector to Hybrid Alignment

 X Y Vac chuck Pickup chuck aligns on big dowels using kinematic touch bearings 2. Detector in correct place. Lower pickup chuck and change over vacuums Detector now aligned on first pickup chuck 3. Turn turnplate over. Repeat alignment process with 2 nd detector 2 nd detector now transferred to 2 nd pickup chuck Transfer chucks

4Insert hybrid into turnplate using small alignment dowels 5Place in glue robot deposit glue pattern Hybrid gluing

Vac chuck 6Replace pickup chucks on large dowels allow glue to cure Atlas experience : silicon to silicon positioning for 600 detectors sigma 2.5 microns

Precision alignment washers Used on Atlas Sct Modules 3mm Diam 2mm Diam +1mm Tolerance Wirecut Al +/- 5 micron

Glue Robot- repeatabilitySmart scope – optical or touch probe survey to 1 micron

Starting to get set up to do thermal measurements -IR camera - Thermocouples - SMD resistors

Starting to put together First mechanical hybrid prototype End July instrument with smt resistors /thermocouples Atlas mechanicals for fiducials More pixel mechanicals would be useful Thermal August…….. Check crude thermal performance Thermal link solder / foil v grease joint Alignment August……. Check Stability of hybrid to hybrid positioning thermal cycling on Smart scope In the light of measurements /experience with mech prototype start mid and elec prototype start first full prototype - working chip(s), kapton September layout, controller card etc. Gas box, front window etc Full thermal simulation, - dynamic effects (MSSL) In parallel jigs and modifications for assembly stages Summary and aims