Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Tuesday 3 rd May 7:30 Access in the SPS to replace injection kicker magnet terminating resistor after radiation cool down overnight 9:45 probes injected.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
Friday 2 nd November 08:45 Stable beams Fill 3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Saturday 14:10 Cryogenics back [26 hours 40 minutes] Pre-cycle 15:30 Beam 2 in  Interlock on TCLIB.6R2.B1. Alessandro Masi found a broken sensor, it would.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Friday 15th June 01:11 Injection.
Wednesday September 14th
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Tue :25 Beams dumped due to RF vacuum interlock
Tuesday 22nd January - morning
Monday 6th August & night
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Thursday morning 09:30 Dump of pPb fill.
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Chromaticity can make a difference…
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Friday 25 bunch fill dumped just before (BLM in 5)
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Friday morning 08:00 Stable beams with 840b.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Thursday
Saturday 24 September 2011.
Saturday 2nd October BLM threshold follow-up - Bernd Dehning and Joerg Wenninger Following MPP approval, Bernd Dehning has increased the BLM thresholds.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Monday 10th December - morning
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
31/3/2010 Difficult day… but at the end stable beams.
Tuesday
Presentation transcript:

Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78, replacement of the faulty sub-modules;  TCDQ.B1, tightening of the clutch screw already done in the last days;  Investigation on ROF.A81B2 (QPS+ElQA+EPC), a power converter module was changed, but no clear evidence of the fault of the last days;  BE-BI accessing at point 4 to fix the LDM, the FBCT system C, the Schottky;  EN/EL to fix a problem on an open switch;  CO accessing to repair a broken Wiener alimentation on cfi-ua63- mkdpm2;  EPC depositing spare modules in UJ14 and UA63. LHC status

Friday afternoon During the accesses, the thresholds of the warm magnets at point 7 were increased by a factor 2→ End of the access, started precycling… 14:00 Ready for beam but… RF fault: klystron filament current incorrect Access to fix the problem Cleaning of Klystron filament contacts. LHC status

Threshold changes All 48 monitors in family THRI_MQW (BLMs protecting warm quadrupoles) have their thresholds increase by a factor 2 in RS8-RS12 (integration windows from 0.8s and until 83s). The monitor factor is reduced from 1.0 to 0.5 and the Master threshold is properly scaled to keep the applied thresholds at the same level as before the change.  Note that the applied thresholds are reduced from 23.17Gy/s to in the integration windows of 2.5 ms and below due to the limit of the electronics. Two TCLA monitors in IP7 (BLMEI.06R7.B1E10_TCLA.C6R7.B1 and BLMEI.06R7.B1E10_TCLA.D6R7.B1) have their monitor factor increased by a factor 2 (from 0.1 to 0.2). LHC status Eduardo Nebot Del Busto

Friday afternoon 16:10 Beam in following access for RF 17: bunches – very smooth injection 17:50 Stable beams Fill 2511  Initial luminosity in Atlas 3.78x10 33 cm -2 s -1  1.29e11 ppb 19:00 Internal fault of ROD.A12B1 converter. For coupling also ROF.A12B1 and RSF/D.A12B1 tripped.  Access required, RP piquet a wee way away, biometry didn’t work… Precycle etc. 23:40 Injecting probes LHC status

Saturday morning LINAC2 quadrupole problem 01:30 re-injecting 02:45 Squeeze  Hitting ~30% dump threshold on two BLM *TCLA*.L7.B2 between 2.5 and 2.0 m. Probably orbit. 03:08 Colliding  Hitting ~45% dump threshold on two BLM *MQWA*.L7 03:10 Stable beams - fill 2513  1.26e11 ppb  3.37 x cm -2 s -1  (~2.6 micron from luminosity) LHC status

Injection LHC status

Beam loss spikes LHC status

Collisions LHC status

Performance LHC status

LBDS issue We have had this morning (7h52) a partial “trip” of the UPS in point 6 (UA63) used in LBDS general purpose racks (lost of electrical power simultaneously in 8 racks). The result of this UPS trip is that we have lost all our LBDS FECS (BETS, TSU, IPOC), the triggering system (Trigger fan-out) and re- triggering systems… EN/EL has had to intervene on the UPS to restart it. Failure happened when there was no beam in the machine… and when some tests were done in the CCC on an electrical circuit in sector 56. During the recovery phase, we have found a WIENER power supply broken (short-circuit on the mains input) in one of the two IPOC FECs. We have also found the rack UPS circuit breaker tripped. LHC status Etienne Carlier

LBDS issue Not clear for me if the WIENER power supply failure is the consequence of the UPS trip or if it is the failure of the power supply that has tripped the UPS. My feeling is that the second option is the most probable. Such a failure with beam in the machine will result in an “asynchronous dump”. As it is the second time that we have this type of failure within the LBDS this year, I think it is worth to see how we can improve the protection of the electrical distribution system against WIENER power supply failure. As it seems that there is no internal protection within the WIENER power supply (still to be confirmed by BE/CO) and that the selectivity of the different EN/EL protection (circuit breakers) to avoid a propagation of the short-circuit current up to the output protection of the UPS is not correct, I start to be worried to continue to operate the LBDS under such conditions and I don’t see “easy to implement” additional protections within our system LHC status