Exec/Board Paris February 2008 WP3.1 Infrastructure Roadmap: Progress Report.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

1 RESEARCH INFRASTRUCTURES Synergy in using FP7 and SFs for the development of Research Infrastructures Warsaw, 13 February 2006 Hervé Pero, European Commission.
Analytical Evidence on Research & Innovation in the Danube Region Progress of WP4 Vienna, Béla Kardon, PhD; RCISD
TITLE DATE The Discover Sailing Program Club Implementation Guide Mar(1) Program Introduction & Purpose 1b) Planning & Prioritising (2) The gemba Report.
Cyberinfrastructure and the Social Sciences Bjørn Henrichsen Chair, ESFRI Social Science and Humanities Roadmap Working Group IASSIST - Ann Arbor - May.
Roadmap Name Strategic Roadmap #n Interim Report April 15, 2005.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
A MEMBER OF THE RUSSELL GROUP PGR PERIODIC REVIEW Sara Crowley
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP6 Communication and dissemination 10-11/07/2012COGEN Europe.
ERA-Net Project ASTRONET Towards a Strategic Plan for European Astronomy Astronet and Aspera Roadmap Synergies.
REF Information Session August Research Excellence Framework (REF)
1 ESFRI and the European Roadmap for Research Infrastructures Elena Righi European Commission OPTICON, Edinburgh, June 2006.
CHIPP Workshop on Detector R&D June - University of Geneva Common R&D for astroparticle physics: Activities of ApPEC and ASPERA Bernard Revaz and.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
GEO Strategic Plan : Implementing GEOSS AN UPDATE GEO WORK PLAN SYMPOSIUM 05 MAY 2015 GENEVA, SWITZERLAND.
Cultural Heritage and Global Change: a new challenge for Europe Working for strengthening the European Research Area Towards Joint Programming in Research.
NAVCA Quality Award Andrea Allez Performance Improvement Manager Excellent service for local groups.
A MEMBER OF THE RUSSELL GROUP PGR PERIODIC REVIEW Sara Crowley
Key Technologies Network Colin Cunningham. 11th Oct 2004 OPTICON Key Technologies Network Grenoble2 Objectives WP5.1: Workshops & Roadmapping: WP5.1:
WLE Operations Update Emma Greatrix 11 March 2013 WLE Management Committee Meeting.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
ASTRONET Roadmap Status Mike Bode Mike Bode Astrophysics Research Institute, Liverpool JMU, UK (Leader, WP 3.1)
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
GEO Strategic Plan : Implementing GEOSS IMPLEMENTATION PLAN WORKING GROUP GEO EXECUTIVE COMMITTEE MARCH 2015 GENEVA, SWITZERLAND.
The Commission's Impact Assessment system 18 September 2014 María Dolores Montesinos Impact Assessment unit Secretariat General 1.
Northern Lincolnshire Healthy Lives Healthy Futures Programme NEL CCG Partnership Board Update September 2014.
1 The RRFSS Evaluation Framework 2005 Background Information and Progress to Date Presenters  Amira Ali  Jane Hohenadel  Kate O’Connor  Deborah Radcliffe.
1 ASTRONET Coordinating strategic planning for European Astronomy.
WP2 – Strategy, governance and liaisons EuroVO-ICE– First review – 26 October 2011 Françoise Genova, EuroVO-ICE coordinator,1 WP2 Strategy, governance.
ASTRONET Board: WP 3.1 Infrastructure Roadmap Progress Report Mike Bode Astrophysics Research Institute, Liverpool JMU, UK.
What European needs to do to take the lead in Space Astronomy ESO Astronomy Faculty May 2004.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
2013 Common Block Development Evaluation and Feedback February 26, 2014.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
Strategic Planning The Big Picture Region 3 ESA September 30, 2004.
Update to NLAG board 22 nd December Sep Jan MCE Workforce and OD Oct Nov Dec IM&T Estates Finance In hospital Model Out of hospital Model Progress.
SIF II Briefing Session 21 st September Briefing Session Content SIF Cycle I – overview Funding and arising issues SIF Cycle II – Process for evaluation.
The Role of an Access Programme: Lessons for FP7 Birgitta Nordström Niels Bohr Institute, Copenhagen University Denmark.
Entrepreneurship Indicators Project Work Programme Entrepreneurship Indicators Project
Better regulation in the Commission Jonathon Stoodley Head of Unit C.1 Evaluation, Regulatory Fitness and Performance Secretariat General of the European.
ELIXIR SAB Feedback December 2014.
Florence 3 December 2010 EFRTC Policy & Research Committee Activity Report Jeremy Candfield Committee Chairman.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Research & Innovation Preparatory Phase and Early Phase Support under the WP * of Horizon 2020 Harry Tuinder Research Infrastructure Unit DG Research,
Bow Basin Watershed Management Plan Revised Terms of Reference
19th GRI Coordination Group meeting
Support- IRDiRC Proposed Work Plan And Communication Strategy
The GEO-6 Matrix Drafting Approach
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
GEOSS Data Sharing Principles
Joint IPR/DAI Workshop
Quality Workshop The Local Council Award Scheme is a great guide for good practice in our sector and a way for councils to build confidence in their.
WP4 Positioning European Astroparticle Physics in the world-wide context WP leader CNRS Partners: FOM, IFIN-HH, FRS-FNRS/FWO, FCT Total work: 22 months.
Improving assessment of GES Draft conclusions and Way forward
ISCED 2011 joint operational manual: Update
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
West Essex Business Planning Process
ASTRONET Coordinating strategic planning for European Astronomy
Update on progress since last WG meeting (13-14 June 2002)
Education and Training Statistics Working Group Meeting of 17 November 2010 Item 3 – Lifelong learning and outcomes of education Sylvain Jouhette Eurostat.
Discussion of the Draft Questionnaire IMPRESS Kick-off Meeting
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
Structural Funds: Investing in Roma
Scene setter European Commission DG Environment
Extension of the European statistical programme Roadmap
Matter and Technologies
Capacity Access Review
Task Force Peer reviews and quality Eurostat
Presentation transcript:

Exec/Board Paris February 2008 WP3.1 Infrastructure Roadmap: Progress Report

Exec/Board Paris February 2008 Activities Since Last Board Panel membership completed. Panel membership completed. 5 Working Group and 25 Panel meetings held to-date. 5 Working Group and 25 Panel meetings held to-date. Panels A-C: Questionnaire sent to 112 facilities (>90% returns by early July; facilities’ list posted on ASTRONET website). Panels A-C: Questionnaire sent to 112 facilities (>90% returns by early July; facilities’ list posted on ASTRONET website). Evaluation template formulated and completed by each assigned Panel rapporteur for each facility. Evaluation template formulated and completed by each assigned Panel rapporteur for each facility. Evaluation Criteria developed to give first-pass rankings, then each facility further discussed and judgements refined (e.g. in the light of the Cosmic Vision results). Evaluation Criteria developed to give first-pass rankings, then each facility further discussed and judgements refined (e.g. in the light of the Cosmic Vision results). Science Vision launched 28 Sept 2007; Cosmic Vision results available 17 October 2007 to Panels. Science Vision launched 28 Sept 2007; Cosmic Vision results available 17 October 2007 to Panels.

Exec/Board Paris February 2008 Activities (cont.) Roadmap Symposium contract signed, event widely publicised and draft programme formulated (see below). Roadmap Symposium contract signed, event widely publicised and draft programme formulated (see below). First draft including all Panel Reports and introductory chapter completed. First draft including all Panel Reports and introductory chapter completed. Meeting held in London with the Agencies (Feb ) and actions (including further prioritisation, cost/funding envelopes, detailed comments on individual chapters) now being worked on to enable completion of the draft for release. Meeting held in London with the Agencies (Feb ) and actions (including further prioritisation, cost/funding envelopes, detailed comments on individual chapters) now being worked on to enable completion of the draft for release.

Exec/Board Paris February 2008 Interrelationships ESO and ESA representatives on the WG ESO and ESA representatives on the WG Similarly for OPTICON and RadioNet Similarly for OPTICON and RadioNet Europlanet representation on Panel C (and on WG in initial phases) Europlanet representation on Panel C (and on WG in initial phases) Information exchange with ASPERA, including round-table meetings (latest 22 Jan 2008) Information exchange with ASPERA, including round-table meetings (latest 22 Jan 2008) ESFRI links, but need to be strengthened ESFRI links, but need to be strengthened

Exec/Board Paris February 2008 Working Group June 7 (second meeting - initial meeting in March discussed e.g. Panel membership, ToR): June 7 (second meeting - initial meeting in March discussed e.g. Panel membership, ToR): –Received progress reports of Panels. –Agreed criteria for inclusion and list of facilities to survey (Panels A-C). –Discussed form of questionnaire. October 30: October 30: –Received and commented on initial findings of each Panel, particularly with respect to initial rankings. –Referred back to Panels any issues as appropriate. –Agreed the next steps in formulation of the Roadmap.

Exec/Board Paris February 2008 Working Group (cont.) December 14: December 14: –Reviewed amended version of Panel Reports, focusing on narratives related to high priority projects (A-C) and main recommendations (D, E). –Provided further feedback. –Discussed form of final report. –Agreed preparation for meeting with the Agencies. –Cost profiles, technological readiness further pursued. February 11/12: February 11/12: –Preparatory, main and summary meetings held wrt the Agencies’ Workshop. Additional WG meeting scheduled March 13th to consider actions resulting (Panel telecons in between also). Additional WG meeting scheduled March 13th to consider actions resulting (Panel telecons in between also).

Exec/Board Paris February 2008 Outline Timetable Appointment of Panel (Co-)Chairs and constitution of Working Group Jan 2007 Appointment of Panel (Co-)Chairs and constitution of Working Group Jan 2007 Appointment of Panel Members and schedule first Panel meetings Mar 2007 Appointment of Panel Members and schedule first Panel meetings Mar 2007 First Draft Panel ReportsOct 2007 First Draft Panel ReportsOct 2007 First Draft Working Group ReportDec 2007 First Draft Working Group ReportDec 2007 Workshop with AgenciesFeb 2008 Workshop with AgenciesFeb 2008 Draft to Board Apr 2008 Draft to Board Apr 2008 Public Draft Roadmap released Apr/May 2008 Public Draft Roadmap released Apr/May 2008 Roadmap Symposium – LiverpoolJun 2008 Roadmap Symposium – LiverpoolJun 2008 Final Roadmap Document producedSep 2008 Final Roadmap Document producedSep 2008

Roadmap Symposium: June , Liverpool European Capital of Culture 2008

Exec/Board Paris February 2008 Main Criteria for Inclusion in Ranking (of Panels A-C) Main focus is on future facilities (includes well-defined major upgrades and significant operational prolongations). Main focus is on future facilities (includes well-defined major upgrades and significant operational prolongations). Only facilities with a significant European content (likely funding requirement) are included. Only facilities with a significant European content (likely funding requirement) are included. Funding requirement > €10M capital cost and/or > €10M operational cost over 5 years (unless special reason). Funding requirement > €10M capital cost and/or > €10M operational cost over 5 years (unless special reason). Only those facilities where a major European funding decision was expected to be required from were included in the rankings. Only those facilities where a major European funding decision was expected to be required from were included in the rankings. It is however better to have too much than too little information overall! It is however better to have too much than too little information overall!

Exec/Board Paris February 2008 Evaluation Framework Broad categories of prioritisation (High, Medium and Low; only High normally discussed in detail in final report; other facilities may be included for “context” and some smaller scale current facilities have been grouped). Broad categories of prioritisation (High, Medium and Low; only High normally discussed in detail in final report; other facilities may be included for “context” and some smaller scale current facilities have been grouped). Sub-divided into cost categories (unfunded European cost): Sub-divided into cost categories (unfunded European cost): Small €10M-€50M; Medium €50M-€400M; Large >€400M Small €10M-€50M; Medium €50M-€400M; Large >€400M (Small: cf. last Decadal Survey for Ground-based; Medium, Large: ~fits with Cosmic Vision wrt “M” missions and “Flagships” for Space-based, including instruments) (Small: cf. last Decadal Survey for Ground-based; Medium, Large: ~fits with Cosmic Vision wrt “M” missions and “Flagships” for Space-based, including instruments) Timescale division (to “full operation”): Short-term (-2015); Medium Term ( ); Long-term (2020+) Timescale division (to “full operation”): Short-term (-2015); Medium Term ( ); Long-term (2020+) Evaluation criteria included Scientific Impact (relation to delivering SV), uniqueness, European involvement, user base, industrial relevance - gave a first-pass ranked list Evaluation criteria included Scientific Impact (relation to delivering SV), uniqueness, European involvement, user base, industrial relevance - gave a first-pass ranked list

Exec/Board Paris February 2008 Panels D and E Terms of reference somewhat different from Panels A, B, C Terms of reference somewhat different from Panels A, B, C Specific questions on the questionnaire to facilities, but also undertook information gathering as detailed in Chapters 6 and 7 of the draft Report Specific questions on the questionnaire to facilities, but also undertook information gathering as detailed in Chapters 6 and 7 of the draft Report Panel D gave members responsibility for specific areas Panel D gave members responsibility for specific areas Panel E sub-divided into Task Groups Panel E sub-divided into Task Groups Information exchange with other Panels Information exchange with other Panels