TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Linac 4 PSB BI LTB LT L4T m from PIMS to foil: m new line (to BHZ20) m present Linac2 line Active elements : 4+2bendings; quads,
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
TE-CRG Activities D. Delikaris, TE-CRG.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
YETS & LS2 Works EN-EL / Power distribution
Linac4-PSB 160 MeV connection readiness review
CONS and HL-LHC day Analysis of needs from TE-EPC
Situation of the Static Var Compensators at CERN.
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
TE-MSC activities in SPS during LS2
EYETS David Hay EN-OSS.
Injector De-cabling Project
AD consolidation activities in LS2
LIU–PLI report LIU PSB meeting.
Planning and Installation
EC Activities Status for the LIU
TE-ABT Activities for LS2
Powering the LHC Magnets
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
MPE main activities planned for LS2
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
EN-CV interventions during EYETS for PS and PSB
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Experimental Areas – LS2 planning
Presentation transcript:

TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group

Contents Activities Projects Consolidation Under approval Resources availability Logistics Interfaces / interferences Conclusions V. Montabonnet TE-EPC2

3

Master schedule up to LS2 V. Montabonnet TE-EPC4 Long Shutdown Commissioning Operation Technical Stop YETS 2015*EYETS 2016YETS 2017LS Activities independent from the operation (i.e. surface) 3 periods are available for works before the Long Shutdown 2 (LS2) *: The connection of the Linac4 to the PS Booster is foreseen for the LS2 but all equipment need to be ready by the end of 2016 in case of an early full connection. Courtesy J. Coupard

V. Montabonnet TE-EPC5

6 EYETS 2016 * YETS YETS independent LIU project LINAC4, PS Booster, PS machine and TT2 351 Linac transfer line (LT, LTB, BI) * Bendings [06 racks*] PS Injection low beta quadrupoles Injection bumpers PS injection septum + bumper LIU Ions * LBS bending magnet PSB Injection DHZ/DVT correctors (BCER) [5 racks*] PSB under studies Finemet RF cavities (BRF1 & BRF2) PS Low energy focusing quad. [7racks*] Chromaticity sextupoles [3 racks*] PS High energy dipole [1 rack*] Linac4 * LBE magnets LS2 4 4 Injection stripping foil chicane (BRF2) [3 racks*] Injection Qstrip (BCER, BAT) [5 racks*] Dipoles (BCER) * Injection stripping foil chicane (BRF2) [48 racks*] * Distributor BI.DIS (BCER, BAT) to be removed * Injection BI.BVT (BHP) [5 racks*] * Injection QNO Quad. (BCER) [5 racks*] * Injection DHZ/DVT correctors (BCER) [5 racks*] * Injection septa (BRF2) [5 racks*] Transfer bending Upgrade (BHP) [17 racks*] MPS+ Trims (245) Under studies: -Position for the PS septum PI.SMH42, bumper PI.BSM41,42,43,44 -Position for the PS low beta quadrupole Low energy dipole [13 racks*] Low energy focusing quad [7racks*] Low energy skew quad [1 rack*] Linac3 Quadrupole [4 racks*] PS IPM magnets [1 racks*] TT2 Complete renovation [100 racks*] Courtesy J. Coupard More than 200 Racks* Rack* = Rack Equivalent (0.6m)

V. Montabonnet TE-EPC7 LIU SPS TCDI [SR2] 1x New RQIF Power Converter [COMET-2p] 1x New MQIF Power Converter [COMET-2p] LIU SPS TCDI [SR8] 1x new MQIF Power Converter [LEP Reno from TI2] 1x new MQID Power Converter [LEP Reno from TI2] AWAKE Proton Line [BB4] Installation Date: < 02/2016 2x New Power Converters [SPS Reno] 1x New Power Converter [COMET] AWAKE Electron Line Installation Date: 12/2016 – 03/ Circuits – Still under discussion EYETS 2016 YETS LS2 4 4 YETS independent LIU SPS project / AWAKE project activities SPS machine

V. Montabonnet TE-EPC8 EYETS LS2 4 4 independent LHC project R2E Project 1100x New FGC Control Upgrade in RR & Tunnel [FGCLite] 120x New LHC600A Power Converter for RR [R2E-LHC600A-10V] 1500x New LHC4-6-8kA Modules for RR [R2E-LHC4-6-8kA-08V] Total = [120 Racks Palettes] (Removal & Installation) New equipment but compatible with existing equipment - Only Transport service will be needed ! SR7 SE5 SR1 SR3 LHC-FMCM RD1.LR1 & LR5 / RD34.LR3 & 7 4x new Power Converters [SATURN] Total = 20 Racks* YETS YETS Rack* = Rack Equivalent (0.6m)

V. Montabonnet TE-EPC9 HL-LHC project SM18 Test Bench Upgrade S1-2016S2-2016S1-2017S2-2017S1-2018S2-2018S1-2019S2-2019S1-2020S2-2020S1-2021S Cluster D Cluster A SC link Cluster C HL-String Cluster A 1x [20kA/±61V] (upgrade of RM.A) 2x New Power Converter 2kA/10V [COMBO] Cluster D 1 x [30kA/±16V] (RM.D + RM.F in parallel) Cluster C 1x New Power Converter [20kA/±26V] [CMS type] 2x New Power Converter [2kA/10V] [COMBO] SC Link 3x New Power Converter [20kA/8V] 4x [±600A/±12V] (old cluster F and A) HL-LHC String 2x New Power Converter 16.5kA (Q1-Q3 and Q2a-Q2b circuits) 1x New Power Converter 13kA(D1 circuit) 3x New Power Converter 2kA(Q3-Trim and corrector circuits) 1x New Power Converter 0.3kA(Q2-Trim circuit) 7x New Power Converter 0.2kA (corrector circuits) 2x New Power Converter 0.12kA (corrector circuits) SC link Cluster E Cluster D Cluster A Cluster B Cluster C Cluster F STRING EYETS 2016 YETS LS2 4 4 YETS independent Under discussions

V. Montabonnet TE-EPC10 S-FRS Project EYETS 2016 YETS LS2 4 4 YETS independent Installation Date: 04/2016 – 05/2016 6x ±600A-±40V circuits [LHC600A-40V] 3x [±500A/±120V]-2MJ circuits [COMET-2p – 2MJ] 9x Load Commutator Switches Total = 15 Racks Equivalent (0.6m)

V. Montabonnet TE-EPC ELENA Without Electron Cooler ELENA PHASE 2 Installation Date: 01/12/2016 – 01/08/ Electrostatic Circuits [High Voltage Power Converters] Total = 03 Racks Equivalent (0.6m) AD Powering Room CANCUN-5S, APOLO Upper Platform [COMBO-DELTA, HV] ELENA PHASE 1 w/o electron cooler Installation Date: 02/ new Power Converters [CANCUN-50S, COMBO-DELTA, APOLO-2P with spares] 68 Electrostatic Circuits Total = 13 Racks Equivalent (0.6m) EYETS 2016 YETS LS2 4 4 YETS independent

V. Montabonnet TE-EPC12

V. Montabonnet TE-EPC13 EYETS LS2 4 4 YETS independent Consolidation project RF PSB RF Cavities Power Converters included in LIU Project ; see Slide 7 HighVoltage PS RF Cavities Power Converter 5 new Power Converters in Bld. 355/R-021 Total : 5x [2700 mm x 800mm] HighVoltage SPS RF Cavities Power Converter [SPS-200] 13 new Power Converters in Bld. BA3 LS EYETS YETS

Consolidation project Electrical Power Quality V. Montabonnet TE-EPC New MEQ59 Static Var Compensator [Meyrin Machine] needed when the Machine and General Service networks will be divided into separate networks New BEQ1 Static Var Compensator [SPS Machine] Under approuval SPS BEF4 Stable Filters Consolidation [non-pulsing network] LHC Static Var Compensator Consolidation Meyrin Filters consolidation LS LS3 EYETS 2016 YETS YETS independent

Consolidation project Under approval V. Montabonnet TE-EPC15 LINAC2 part (LINAC4 to PS Booster) - 48x New Power Converters PS - 13x New Capacitor Discharge Power Converters PS Injector Converter Control – New Electronics for 100 Power Converters to standardize one control over the Injector Chain Quantity = converters not covered by LIU / Consolidation projects SPS COD - 300x New Power Converters (Electronics & Power included) SPS Aux Power Converter Control - New Electronics for 200 Power Converters to standardize one control over all the Injector Chain AD - 25x New Capacitor Discharge Power Converters East Experimental Area - 59x New Power Converters nTOF - 7x New Power Converters North Experimental Area – 1x New Power Converter for COMPASS Spectrometer 4 4 EYETS 2016 YETS LS2 YETS independent

Consolidation project Under approval V. Montabonnet TE-EPC16 Oil transformer consolidation [Total Quantity : 202] Over a period of about 10 years Replacement of oil transformers by cast resin transformers when possible Consolidation of LHC RF oil transformers and transformers with high power ratings and their oil retention system 4 4 EYETS 2016 YETS LS2 YETS independent 5 5 LS3 Cast Resin Transformer Type Oil Transformer Type

V. Montabonnet TE-EPC17

Maintenance Activities Preventive Maintenance V. Montabonnet TE-EPC18 Recurrent Preventive Maintenance Activities during LS Few impact on other activities / groups Shall be integrated in the Coordination Schedule for access and service readiness List Current Calibration Measurement Campaign for all accelerator complex Equipment's fans replacement Transformer maintenance Visual inspection ……

V. Montabonnet TE-EPC19

Resources availability Versus Activities V. Montabonnet TE-EPC20 Project & Approved Consolidation Activities Manpower available Consolidation Activities under approval Synergy could be found during the procurement of equipment with approved activities Nevertheless, additional manpower will be needed Unforeseen Activities or New Projects No doubt that the activity list will increase depending on operational issues found during Run 2. Depending of the volume and priority, additional manpower will be needed. New Project will not be possible to manage up to LS2

Resources availability Versus Planning V. Montabonnet TE-EPC21 Manpower during INSTALLATION and COMMISSIONING EDMS EDMS : Length of the YETS / EYETS / YETS Machine s Opening of the machine (weeks) not including the xmas break of 2 weeks YETS 2015EYETS 2016YETS 2017 PSB10138 PS8138 SPS811 (BA1) (BA1) – 8 LHC Lot of activities concentrated in short periods Need flexibility for increasing manpower during these periods, mainly through Field Support Unit (FSU) Need optimization at the level of the LS2 coordination to optimize the group load by resources leveling across ALL facilities (Injector, LHC and Experimental Areas) Need to be aware in advance of any change of planning

Resources organization Versus Planning & Activities V. Montabonnet TE-EPC22 For efficiency and manpower estimation/optimisation, TE-EPC needs : During INSTALLATION phase, a detailed schedule with the different steps to performed across the different groups (who is doing what when) During (Re)COMMISSIONING phase, the planning of the Individual System Tests period dedicated to TE- EPC group taken into account the readiness of the services, access, control, EIS ….. the clarification of TE-EPC contribution during the Circuit (Re)Commissioning

Logistics Storage V. Montabonnet TE-EPC23 Irradiated Equipment Some equipment removed from the LHC tunnel for consolidation could be activated after Run2 Need dedicated radioactive storage place Need area for repairing / testing irradiated electronics (blg. 867) Storage TE-EPC will need buffer area to store converter parts received from industry before their test and integration in the power converters the power converters ‘ready for installation’ before their final installation in the machines Around 1000m 2 needed

Interface / Interference V. Montabonnet TE-EPC24 Interference - Any change of the interfaces with an impact on the power converters should be agreed with TE-EPC group especially for the CONTROL part (BE-CO) Electricity Control Cooling Ventilation Structure Handling Magnets PIC / WIC EIS Power Converter Interface New Power converters imply service support (transport, infrastructure structure) and in most of cases upgrade or consolidation of cooling, electricity distribution and cabling Reminder : TE-EPC contributes to the definition of the cables BUT is neither responsible of the ‘Demande de Cables’ nor the different cables needed to interconnect the different systems

Interface Definition / Database V. Montabonnet TE-EPC25 Interface Need a clear overview of the different systems per circuit Not clear who is doing this definition / coordination Need a clear definition of the interface between systems per circuit Interconnection as cabling, cooling are discussed during Integration meeting Databases – Need a good support for the definition of the Functional Positions and the layouts of the new circuits through the Layout Database managing the change especially in Injector Complex the equipment code definition through the Naming Service

Conclusions V. Montabonnet TE-EPC26 High volume (bigger than LS1) of activities for TE-EPC group with high technical challenge in some case Few margins to complete unforeseen activities during LS2 No margin for new projects LS2 can only be successful with a global planification and coordination for the entire facilities Long Shutdown Commissioning Operation Technical Stop YETS 2015 *EYETS 2016YETS 2017LS ELENA AWAKE S-FRS SM18 Upgrade Installation

V. Montabonnet TE-EPC28

HL-LHC project LS2 Work Packages V. Montabonnet TE-EPC29 WP3 - New Q5 magnets in LSS6 for ATS Optics 2x New Power Converters (Integration not yet started) 11T Dipole uncertainty “We ask to keep open the possibility to install 2 units of 11T around P2 or P7 in case of need in the second part of LS2.The issue will be defined at Chamonix 2016 or in Spring 2016 at latest.” Lucio’s presentation 2x New Power Converters (Integration not yet started) 4 4 EYETS 2016 YETS LS2 YETS independent

LHC project CMS V. Montabonnet TE-EPC30 20kA Free-wheel Thyristor

Others V. Montabonnet TE-EPC31 Recommissioning Plans of Machines and Experimental Areas for beam after LS2Recommissioning Plans of Machines and Experimental Areas for beam after LS2