PSS/E RAW File Format for appending to case

Slides:



Advertisements
Similar presentations
NERC Footnote b / 12 – Load Loss
Advertisements

Arsalan A Rahim EED, UET Lahore. The Edit Mode is used to create a new case or to modify existing cases. In Edit Mode: Create a new case Create a.
Reading a GE PSLF *.epc into PWS
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
ASENT_IMPORT.PPT Importing Board Data Last revised 08/10/2005.
London & Zurich Plc User Guide. Service Benefits Full on-line management of client accounts Paperless direct debit – no signatures required Standing orders.
Contingency Ranking by Time Domain Simulations ECE 422/522 Russell Patterson Micah Till Terry Jones.
User Guide. Service Benefits  Full on-line management of client accounts  Paperless direct debit – no signatures required  Standing orders fixed not.
Protection. Goals of Protection Operating system consists of a collection of objects, hardware or software Each object has a unique name and can be accessed.
PSS®E 34.0 Release Webinar 23 April 2015
TRANSFORMERS. TRANSFORMER PARAMETERS Turns Ratio (n) It is defined as the ratio of the number of turns in the secondary winding (N sec ) to the number.
Course Orientation Assignments Tool. If the Assignments tool has been added to the course, use the Assignments link in the Course Menu to access upcoming.
Doug Tucker and Jon Jensen WECC Staff SRWG Workshop July 15-16, 2014 ColumbiaGrid.
GEPUWG JUG / TSS February New Versions  PSLF v19 – primarily data enhancements  PSLV v20 – primarily UI enhancements.
Page 1 of 29 To the OASIS Roles Online Training Course Each company has an assigned ETS Site Administrator who is responsible to create their company's.
System Installation and Setup Doug Tucker Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RARF QnA Session April 17, Resource Registration Process and Schedule Final RARF forms sent during week of April 7 –New Resources should get blank.
Intro to Google Apps B3: Working in Google Drive.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
BCCS Update Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
Electrical Resistance and Ohm’s Law Electric circuits are used to convert electrical energy into some other form of energy we need.
ASENT_IMPORT.PPT Importing Part Lists and Board Data Last revised 10/28/2009.
Monthly TCR Calculation DRAFT 3 James J. Teixeira 05/11/02 Also review ERCOT Protocols Section 7 for more details and additional data.
Cataloging 12.3 to 14.2 Seminar. Cataloging 2 -New check routines -Cataloging authorizations -Other innovations -Fix and expand routines -Floating keyboard.
(Stream Editor) By: Ross Mills.  Sed is an acronym for stream editor  Instead of altering the original file, sed is used to scan the input file line.
Base Case Basics Jon Jensen Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
SRDR Quarterly Training Brown Evidence-based Practice Center Brown University June 20 th, :00pm-2:00pm Entering Data Retrospectively into SRDR The.
 Goals of this session  Updates available/coming to SADE and TRAX related options  SADE issues, understanding processes  TRAX issues, understanding.
Exploring Office 2003 – Grauer and Barber Exploring Microsoft Outlook 2003 A Desktop Information Manager Robert Grauer and Maryann Barber Committed to.
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
May 7, We manage documents and their changes with versioning and check out/check in procedures.
Status Update: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
Senior Elective Tutorial MS Access Database: Student Records.
Actions Queries. Understanding Action Queries  Action queries are a way to make corrections to database. They can make an enormous mess of database if.
CCSB223/SAD/CHAPTER131 Chapter 13 Designing the System Internals.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Electric Circuits Goals: electricity, voltage, current, resistance, ohm’s law, Kirchoff’s laws, power and energy.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Topology Comparison PowerWorld Users Tool Zach Gill Sanford Engineer, Energy Delivery May 21, 2014.
Building a Project Jon Jensen Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Immunization Inventory Reconciliation Training INTRODUCTION.
Material for 10/23/2015 PGDTF Meeting Michael Juricek.
Voltage Support Service (VSS) for CREZ Region Advanced Network Applications ERCOT.
Reliability and Operations Subcommittee Report 2/2/2012.
DATA MANAGEMENT AND DATABASES. Data Management Data management is the process of controlling the information generated during a research project or transaction.
Status Update to ROS: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
Midwest alio ® Conference November 13-14, 2013 Fixed Assets Michael Williams.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
SCR760 Preliminary Impact Analysis SCRTSP RequirementCost Delivery Keep TP current for all new PSS/E releases $610K - $760KDec Represent.
Data Requirements For Calculating Geomagnetically Induced Currents ROS Meeting March 3, 2016 Michael Juricek PGDTF Chairman 1.
Data Requirements For Calculating Geomagnetically Induced Currents PGDTF Meeting March 21, 2016 Michael Juricek PGDTF Chairman 1.
Siemens PTI GIC Data File Contents Presented to PGDTF February 11, 2015.
Copyright © 2014 Pearson Canada Inc. Ext. 5b-1 Copyright © 2014 Pearson Canada Inc. Application Extension 5b Using Microsoft Access Part 2: Using Information.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
PowerWorld Case Validation
Nick Hatton Associate Staff Engineer
Qiuli Yu, Jay Teixeira, and Ed Geer
2017 AQI Schema Improvements
Assembler Design Options
Learning to Program in Python
Base Case Build Process
Doug Tucker and Jon Jensen WECC Staff
Base Case Build Process
Topology Comparison PowerWorld Users Tool Zach Gill Sanford
Jon Jensen Associate Staff Engineer
Jon Jensen Associate Staff Engineer
Presentation Title Presentation Title
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

PSS/E RAW File Format for appending to case Raw append file needs all sections, even if there is nothing in the section Insert complete data record in sections, not just data being modified This data will overwrite existing data Records to be deleted can be inserted into the file as comments Can’t use idv file 0, 100.00, 33, 0, 0, 60.00 0 / END OF BUS DATA, BEGIN LOAD DATA 0 / END OF LOAD DATA, BEGIN FIXED SHUNT DATA 0 / END OF FIXED SHUNT DATA, BEGIN GENERATOR DATA 0 / END OF GENERATOR DATA, BEGIN BRANCH DATA 0 / END OF BRANCH DATA, BEGIN TRANSFORMER DATA 0 / END OF TRANSFORMER DATA, BEGIN AREA DATA 0 / END OF AREA DATA, BEGIN TWO-TERMINAL DC DATA 0 / END OF TWO-TERMINAL DC DATA, BEGIN VOLTAGE SOURCE CONVERTER DATA 0 / END OF VOLTAGE SOURCE CONVERTER DATA, BEGIN IMPEDANCE CORRECTION DATA 0 / END OF IMPEDANCE CORRECTION DATA, BEGIN MULTI-TERMINAL DC DATA 0 / END OF MULTI-TERMINAL DC DATA, BEGIN MULTI-SECTION LINE DATA 0 / END OF MULTI-SECTION LINE DATA, BEGIN ZONE DATA 0 / END OF ZONE DATA, BEGIN INTER-AREA TRANSFER DATA 0 / END OF INTER-AREA TRANSFER DATA, BEGIN OWNER DATA 0 / END OF OWNER DATA, BEGIN FACTS CONTROL DEVICE DATA 0 / END OF FACTS CONTROL DEVICE DATA, BEGIN SWITCHED SHUNT DATA 0 / END OF SWITCHED SHUNT DATA, BEGIN GNE DEVICE DATA 0 / END OF GNE DEVICE DATA Q

PSLF epc File Format for appending to case epc append file needs only sections being modified or added or deleted Insert complete data record in sections Flag deletion with -4 for status (if bus, then type is -4) Can’t use epcl file bus data ty 1 "One " 138.00 : -4 branch data ck se long_id st resist react charge rate1 rate2 rate3 rate4 aloss lngth 2 "Two " 138.00 3 "Three " 138.00 "1 " 1 " " : -4 7 "Seven " 138.00 5 "Five " 138.00 "1 " 1 " " : 1 0.020000 0.060000 0.040000 200.0 200.0 200.0 0.0 0.000 1.0 / 1 1 0.000000 0.000000 1.000000 400101 391231 0 1 0 0.0 0.0 0.0 0.0 1 1.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0 6 "Six " 138.00 7 "Seven " 138.00 "1 " 1 " " : 1 0.080000 0.240000 0.050000 200.0 200.0 200.0 0.0 0.000 1.0 / 3 1 0.000000 0.000000 1.000000 400101 391231 0 1 0 0.0 0.0 0.0 0.0 1 1.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0

Optional Submittal for Contingency Definitions Modify and add to the existing auto-generated single branch outage spreadsheet list (existing procedure) PSLF SSTools users can submit *.otg files PSS/E ACCC users can submit *.con files Management of *.otg and *.con The data owner needs to test the file with the draft WestConnect case and correct prior to submittal The files often have other data owner contingency definitions The data owner is assigned authority of the contingency name and actions