2 Davide Aguglia TE-EPC-FPC Sept. 23 rd 2014 3rd PSB injection EPC powering rack space coordination meeting Stripping foil chicane BSW magnets powering.

Slides:



Advertisements
Similar presentations
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

Wind Turbine Session 4.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
Alternating Current Circuits
E951 POWER SUPPLY SAFETY REVIEW 9/06/02 IOANNIS MARNERIS Brookhaven National Labs.
Workshop on Special Compact and Low Consumption Magnet Design
Magnetics Design Primary Constraints:
MSI-V J. Borburgh, B. Balhan, E. Carlier, J.M. Cravero, B. Goddard, D. Nisbet, P. Van Trappen, F. Velotti.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Inductors. Inductance Electrons in motion create electromagnetic fields – Recall from previous section that electrons in motion also create an electrostatic.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
Chapter 22 Alternating-Current Circuits and Machines.
Chapter 2 Transformers.
PSB Main Power Supply Serge Pittet Jean-Paul Burnet, Karsten Kahle, Fulvio Boattini, Max Chamiot-Clerc TE-EPC Serge PITTET LIU-2011 Event, 25/11/2011.
Alternating Current Circuits
Powering the main linac implications Daniel Siemaszko, Serge Pittet OUTLINE : Cost impact of power converters, power consumption and powering.
Fundamentals of Electric Circuits Chapter 11
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
The CNGS Horns Electrical Systems The CNGS Horns Electrical Systems 4th workshop on Neutrino Beams and Instrumentation 7 – 11 November 2003 at KEK Gilles.Maire.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
The Heavy Ion Fusion Virtual National Laboratory Pulsed Normal Quadrupoles for a Heavy Ion Fusion Driver Final Focus Section D. Shuman, S. S. Yu, LBNL.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Electrical Discharge Circuit for CNGS Horn & Reflector PH/DT1 Group Meeting, 23 October 2007 Gilles MAIRE PH/DT1-IC Section Leader.
BL1U at TRIUMF UCN Beamline Kicker Magnet (April 12, 2010)
Kicker generator and controls installation in ECA5? Etienne CARLIER
Basic Components. At the Atomic Level Nucleus made up of Protons (+) and Neutrons (no charge). Electrons occupy clouds of probability around nucleus.
The Stripping Foil Test Stand in the Linac4 Transfer Line
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Monday, Apr. 16, 2012PHYS , Spring 2012 Dr. Jaehoon Yu 1 PHYS 1444 – Section 004 Lecture #20 Monday, April 16, 2012 Dr. Jaehoon Yu Today’s homework.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
Consolidation of the Booster Injection Quadrupole Magnets (part 2) A. Aloev 14 th February 2013.
ESS | A Preliminary Feasibility Assessment of Power Converters and Magnets for Beam Raster System| | Carlos A. Martins, ESS Preliminary Feasibility.
Shock Tests on Tantalum and Tungsten J. R. J. Bennett, S. Brooks, R. Brownsword, C. Densham, R. Edgecock, S. Gray, A. McFarland, G. Skoro and D. Wilkins.
NEXT EXCELLENCE IN SOLID STATE PULSED POWER BY SCANDINOVA SYSTEMS AB Klas Elmquist.
Wednesday, Apr. 19, 2006PHYS , Spring 2006 Dr. Jaehoon Yu 1 PHYS 1444 – Section 501 Lecture #21 Wednesday, Apr. 19, 2006 Dr. Jaehoon Yu Energy.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Powering the damping rings wigglers Daniel Siemaszko, Serge Pittet OUTLINE : Powering superconductive magnets, Powering wigglers strategy, Existing.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
The power supply for magnetic elements at CR D.Senkov IWAPT 2015, BINP, Novosibirsk The power supply for magnetic elements at CR D. Senkov/
1 T. Mohite and H. Welker LINAC and Operation/ Electric Power Systems GSI Darmstadt Power Converters for the Magnets of Collector Ring in FAIR
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
Pulsed Magnet Power Supply Feasibility Study
Presentation CERN SPAIN | ITALY | FRANCE | GERMANY | MEXICO | USA | BRAZIL | UAE | QATAR | OMAN | SAUDI ARABIA jema.es.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
ILC Power and Cooling VM Workshop
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Real vs. Ideal Batteries Capacitance
LINAC4 ADVISORY COMMITTEE
CLIC Civil Engineering & Infrastructure Working Group Meeting
Power converters for 2GeV injection
Friday 15th June 01:11 Injection.
Powering the LHC Magnets
Integration – preliminary ideas on routing and tests
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
SCANDINOVA IN UPPSALA, SWEDEN
TEST PLANS for HL LHC IT STRING
Klystron Power Supplies for ILC
Power Magnetic Devices: A Multi-Objective Design Approach
Overview of mechanical design & construction
Equations, Performance, Electrical Equivalent Circuits
Presentation transcript:

2 Davide Aguglia TE-EPC-FPC Sept. 23 rd rd PSB injection EPC powering rack space coordination meeting Stripping foil chicane BSW magnets powering BRF2 EPC infrastructure

Goals 3 Introduce functional specs / general powering layout Explain/justify needs for short cable length Give preliminary needs for all kind of interconnections with power converters Derive next actions and identify missing info 3rd PSB injection EPC powering rack space coordination meeting

functional specs / general powering layout 4 16 power converters required for feeding 16 magnets separately 2 types of converters (BSW1 different from BSW2, 3, & 4) 2 power converters spares – total of 18 converters 3rd PSB injection EPC powering rack space coordination meeting BSW1BSW2&3BSW4 L (µH) R (mΩ)3.577 I peak (A) I rms (A) V max (V)450 BSW magnet’s electrical specifications

functional specs / general powering layout 5 Overall current/voltage specification 3rd PSB injection EPC powering rack space coordination meeting t rise (ms)5 t flat (ms)1 to 2 t fall (ms)5 t rep (ms)900 Because infinite dv/dt not possible, current smoothing agreed with beam optics Absolute precision: 100 ppm (±50 ppm) during flat-top (starting from when beam is injected) 1000 ppm (±500 ppm) during ramp-down

functional specs / general powering layout 6 Power converter topology and features 3rd PSB injection EPC powering rack space coordination meeting Main features: Bi-directional energy exchanges between magnet and capacitor bank with minimum losses Possibility to slightly change/re-program the current reference Minimum power fluctuation and good power quality withdrawn from the mains Remote control and diagnostics via the new FGC3-based controller Possibility of re-using standard EPC converter components

Need for short cables length 7 Simplified analysis – referring all to primary 3rd PSB injection EPC powering rack space coordination meeting Supposing 800V as maximum voltage which can be delivered from power converter (standard technology limitation) Knowing that cable inductance L cs depends on its length Overall design parameters are k and cable length!

Need for short cables length 8 Example– limitations vs cable length 3rd PSB injection EPC powering rack space coordination meeting 4 conductors of 75mm 2 each, DC, L=0.26µH/m: Converters power, volume and cost increase with cable length (analysis considering resistive effects):

Need for short cables length 9 General powering layout 3rd PSB injection EPC powering rack space coordination meeting Possibility of deporting pulse transformers of BSW2, 3, & 4 nearer the magnet

Need for short cables length 10 Re-arrangement of power converters rack & connections 3rd PSB injection EPC powering rack space coordination meeting Each converter 3 racks access from front and rear of each rack! 54 racks total List of connections to power converter:

Interconnections with power converters 11 Re arrangement of power converters rack 3rd PSB injection EPC powering rack space coordination meeting Average power conv. Consumption: ~ 5-10 kW – outlet switchgears 32 A Losses: ~ 1 kW Cooling: Water or air If EPC standard components water Otherwise forced air For water cooling each converter needs ~12 l/min, 250 mbar pressure drop For BSW1 DCCTs cables are provided by EPC (15 mm diameter cables) Ethernet switch and gateway probably need a supplementary rack. Is there a magnet interlock? (water, vacuum, overcurrent) Beam Interlock System (BIS) connection? EIS? All this is preliminary! Need cable type and start final design!

next actions / missing info Obtain final DC cable for starting design (EN/EL) Re-evaluation of maximal cable length with final cable (Davide) Make sure that cable length does not affects DCCTs precision (Davide with EPC/HPM) Start final design (Davide) Identify cooling requirements Verify power converter volume, or rack number Fix converter current of BSW1 converters, derive cables 12 3rd PSB injection EPC powering rack space coordination meeting