Colmar, 9-13 Sept. 2002LECC 2002 8 th Workshop on Electronics for LHC Experiments: Progress in Radiation and Magnetic Field tests of CAEN HV and LV boards.

Slides:



Advertisements
Similar presentations
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Advertisements

HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Rainer Renfordt IKF Frankfurt TPC meeting 10/11December GSI Low Voltage System for the Alice TPC " Test of Wiener PL500 supply " Alternative scenario:
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
ACES 2011 The third common ATLAS CMS Electronics Workshop for LHC upgrades March 9-11, 2011, CERN, Geneva, Switzerland Hardware:  ATMEL ATmega128 microcontroller.
DC-DC Buck Converter in Inner Detector Environment
Siena, Oct th Topical Seminar on Innovative Particle and Radiation Detectors: Progress in Radiation and Magnetic Field tests of CAEN HV and.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
CMS ME CSC HV system Alex Madorsky University of Florida.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
ATLAS ATLAS DCS H.J.Burckhart, Muon Electronics Meeting, December 11th Status of Embedded Local Monitor Board (ELMB) Overview Radiation tolerance.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
FP420 Tracker and Timing detector Low and high voltage supply INFN/Univ. of Torino Cern meeting, Jan
FP420 Low and high voltage supply INFN/Univ. of Torino Sep
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Developments on power transfer at CERN (DC-DC converters) Philippe Farthouat CERN.
February 24, 2003PDR on Muon Elx Services - A. Lanza1 MDT – TGC power supply system HV distribution Cabling and connectors Specifications for distributors.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
PHOTOMULTIPLIER HIGH VOLTAGE POWER SUPPLY SYSTEM FOR THE CMS FORWARD HADRON CALORIMETER Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute.
SA Ch High Voltage Module Main Features for each channel: V out = 12 kV I out = 1 mA R ipple = < 200 mVpp.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
SA2004 Test conditions: Vout= 5V Iout =50Amp 0-5KGauss.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
Preliminary conducted noise test results for LV power supplies Bruno Allongue CERN-PH-ESS Fernando Arteche Imperial College – CERN 21 January 2005.
Como, Oct 20017th Conf. on Advanced Technology and Particle Physics Radiation tolerance and magnetic field behavior of CAEN HV and LV boards for.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
FP420 Low and high voltage supply Henning E. Larsen, INFN Feb
FP420 Low and high voltage supply Henning E. Larsen, INFN/Univ. of torino April
Study of the Radiation Damage of Hamamatsu Silicon Photo Multipliers Wander Baldini Istituto Nazionale di Fisica Nucleare and Universita’ degli Studi di.
Compact data acquisition and power supply system designed for hostile environment condition concerning radiation and magnetic field A. Mati, S. Petrucci,
3/FEB/2015G. Blanchot, F. Faccio, S. Michelis1 FEASTMP DCDC Converters G. Blanchot On behalf of the PH-ESE Power Project Team.
Electronic Instrumentation
ATLAS MDT HV – LV Detector Control System (DCS)
CAEN power supply group
Cosmic Ray Tracker and Detector Control System at the GIF++
Evaluation and testing of advanced low-voltage power supplies
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
RPC’s HV-LV project Introduction HV and LV requirements
RPC HV&LV systems Introduction Detector description Requirements
Report on radiation test done in Casaccia on January 11, 2006
RPC HV&LV systems Introduction Detector description Requirements
Pierluigi Paolucci - I.N.F.N. Naples
Resistive Plate Chambers in CMS
A. Boiano1, F. Loddo2, P. Paolucci1, D. Piccolo1, A. Ranieri2
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Alfonso Boiano1, Flavio Loddo2, Pierluigi Paolucci1, Antonio Ranieri2
RPC Detector Control System
RPC HV&LV systems Introduction Detector description Requirements
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
RPC HV-LV project Introduction System requirements and description
Presentation transcript:

Colmar, 9-13 Sept. 2002LECC th Workshop on Electronics for LHC Experiments: Progress in Radiation and Magnetic Field tests of CAEN HV and LV boards UNI EN ISO 9001 CERT. N CAEN Nicola PAOLI Nicola PAOLI COSTRUZIONI APPARECCHIATURE ELETTRONICHE NUCLEARI Via Vetraia, 11 - I VIAREGGIO (Italy) Tel URL:

Colmar, 9-13 Sept. 2002LECC 2002 Summary CAEN approach to LHC power supplies CAEN approach to LHC power supplies Implemented devices working in hostile area Implemented devices working in hostile area Result of last tests in radiation and magnetic field Result of last tests in radiation and magnetic field Conclusions Conclusions

Colmar, 9-13 Sept. 2002LECC 2002 SY1527 Integration in DCS TCP/IP LAN OPC LAN Telnet ClientLabView on PC/MAC Internet Router WAN Link Telnet Client ETH I/F OPC Server (via RS232) RS232 I/F Custom HV Distr. Detector OPC Server (via TCP/IP) OPC Client HV/LV Out Custom LV Distr. Custom HV Distr. HV+Control

Colmar, 9-13 Sept. 2002LECC 2002 CAEN approach to the problems in power supplies of LHC Radiation tolerance Radiation tolerance Magnetic field tolerance (up to 10 KGauss) Magnetic field tolerance (up to 10 KGauss) Low Cost (COTS) Low Cost (COTS) Efficient energy transmission Efficient energy transmission Hi-Power (up to 1 KWatt) Hi-Power (up to 1 KWatt) Low noise Low noise Floating ground Floating ground Basic requirements

Colmar, 9-13 Sept. 2002LECC 2002 CAEN Experience in LHC “Hostile Area” ’97: First COTS rad-tolerance tests (ENEA - La Casaccia) ’97: First COTS rad-tolerance tests (ENEA - La Casaccia) ’98: NIC Non Inductive Converter ’98: NIC Non Inductive Converter ’99: Tests with p and n in Louvain-la-Neuve of A877 ( CMS Muon Chambers ) ’99: Tests with p and n in Louvain-la-Neuve of A877 ( CMS Muon Chambers ) ’00: Special material research ’00: Special material research ’01: A New design (Patent Pending) for a family of High and Low voltage DC/DC converters ’01: A New design (Patent Pending) for a family of High and Low voltage DC/DC converters

Colmar, 9-13 Sept. 2002LECC 2002 System Philosophy

Colmar, 9-13 Sept. 2002LECC 2002 Functional Prototype SASY : a S ub A ssembly SY stem SASY : a S ub A ssembly SY stem Functional Prototype for Easy Testing Functional Prototype for Easy Testing Floating ground Floating ground Parameters controlled via SY1527/SY2527 mainframe Parameters controlled via SY1527/SY2527 mainframe

Colmar, 9-13 Sept. 2002LECC 2002 The SASY 2000 A “functional prototype” solution A “functional prototype” solution

Colmar, 9-13 Sept. 2002LECC 2002 SASY 2000 Design SASY 2000 Power Supply and Control Diagram: SASY 2000 Power Supply and Control Diagram:

Colmar, 9-13 Sept. 2002LECC 2002 SASY 2000 Design SASY 2000 Power Supply and Control: Actual Implementation SASY 2000 Power Supply and Control: Actual Implementation

Colmar, 9-13 Sept. 2002LECC 2002 Common Noise Reduction Viewpoint Common Noise Reduction Viewpoint

Colmar, 9-13 Sept. 2002LECC 2002 Expected Radiation and Magnetic Field Tolerance Magnetic Field: Magnetic Field: »up to 10 kGauss Radiation: Radiation: »60 MeV protons, up to 2*10 10 p/cm 2 »Up to 60 MeV neutrons, up to n/cm2 »up to 7 kRad

Colmar, 9-13 Sept. 2002LECC 2002 SASY 2000 family: SA2xxx (Custom Development)

Colmar, 9-13 Sept. 2002LECC 2002 SA Ch Low Voltage Module SA Ch Low Voltage Module Main Features for each channel: V out = 4.5 ÷ 5.5 V V out = 4.5 ÷ 5.5 V 6.5 ÷ 7.5 V I out = 2 A 1 A I out = 2 A 1 A R ipple = < 20 mVpp R ipple = < 20 mVpp

Colmar, 9-13 Sept. 2002LECC 2002 SA ch DAC Module Main Features for each channel: 14 bit progammable voltage = 0 ÷ 3 V 14 bit progammable voltage = 0 ÷ 3 V I out = 30 mA I out = 30 mA

Colmar, 9-13 Sept. 2002LECC 2002 SA ch Low Voltage High Current Module Main Features: V out = 4 ÷ 6 V V out = 4 ÷ 6 V I out = 60 A I out = 60 A R ipple = < 150 mVpp R ipple = < 150 mVpp

Colmar, 9-13 Sept. 2002LECC 2002 SA200x 1 ch Low Voltage High Current Module Main Features: V out = 5 V V out = 5 V I out = 80 A I out = 80 A R ipple = < 30 mVpp R ipple = < 30 mVpp Patent Pending

Colmar, 9-13 Sept. 2002LECC 2002 Test under Radiation Louvain la Neuve, August 26 th 2002 Modules tested: SA2002, SA2003 and SA2004 Modules tested: SA2002, SA2003 and SA2004 Time of test: 2h 40’ Time of test: 2h 40’ Radiation: up to 60 MeV, Fluence 10 8 N/Cm 2 Radiation: up to 60 MeV, Fluence 10 8 N/Cm 2 Average target distance: 75 cm. Average target distance: 75 cm. Total dose: n/cm 2 Total dose: n/cm 2 Branch controller on SY2527 Branch controller on SY2527

Colmar, 9-13 Sept. 2002LECC 2002 Test Setup Louvain la Neuve, August 26 th 2002

Colmar, 9-13 Sept. 2002LECC 2002 Test Setup Louvain la Neuve, August 26 th 2002

Colmar, 9-13 Sept. 2002LECC 2002 Test Setup Louvain la Neuve, August 26 th 2002

Colmar, 9-13 Sept. 2002LECC 2002 Tests Performed During the test lots of cycles of ramp-up and ramp-down were performed During the test lots of cycles of ramp-up and ramp-down were performed Output voltages Output voltages were changed were changed continuously continuously

Colmar, 9-13 Sept. 2002LECC 2002 Test Results During the test the communication with the SASY was lost for three times but the problem was recovered with a remote operation. During the test the communication with the SASY was lost for three times but the problem was recovered with a remote operation. After the test and the total dose of N/Cm 2 the SASY works perfectly. After the test and the total dose of N/Cm 2 the SASY works perfectly.

Colmar, 9-13 Sept. 2002LECC 2002 Test in Magnetic Field CERN, September 5 th 2002

Colmar, 9-13 Sept. 2002LECC 2002 Test Setup

Colmar, 9-13 Sept. 2002LECC 2002 Test Setup

Colmar, 9-13 Sept. 2002LECC 2002 SA2004 Tests performed Channel efficiency checked in the following condition: Channel efficiency checked in the following condition: »Vout= 5 Volt »Iout = 30, 40, 50 Amp »B= 0, 1, 3, 5 Kgauss

Colmar, 9-13 Sept. 2002LECC 2002 SA2004 Test results Worst Case:

Colmar, 9-13 Sept. 2002LECC 2002 SA200x Tests performed Channel efficiency checked in the following condition: Channel efficiency checked in the following condition: »Vout= 5 Volt »Iout = 40, 60, 80 Amp »B // and  = 0, 1, 2, 3, 4, 5 KGauss

Colmar, 9-13 Sept. 2002LECC 2002 SA200x Test results - 1 Worst Case:

Colmar, 9-13 Sept. 2002LECC 2002 SA200x Test results - 2 Best Case:

Colmar, 9-13 Sept. 2002LECC 2002 Conclusions & Comments Test in Magnetic Field: Test in Magnetic Field: –R&D steps completed Test under Radiation: Test under Radiation: –Problems known solved Components: Components: –Purchasing strategy Time Schedule: Time Schedule: –From the prototype to the production