2015 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting April 23, 2015.

Slides:



Advertisements
Similar presentations
Soil Erosion.
Advertisements

1 Restoration of Quail Habitat on Surface Mined Lands Kale HortonRamona Briggeman U.S. Dept. of the InteriorIndiana Dept. of Natural Resources Office of.
GOLF COURSE HOSPITAL AGRICULTURE WILDLIFE HABITAT WETLANDS OPEN SPACE SCHOOL RECREATION HOUSING DEVELOPMENT WHAT DO ALL THESE PLACES HAVE IN COMMON?
June 6, 2013 SURFACE RECLAMATION OF THE CAPTAIN JACK MILL SUPERFUND SITE Nick Anton, CDM Smith Todd Bragdon, CDM Smith Mary Boardman, CDPHE Joy Jenkins,
Twin Cities Army Ammunition Plant 2007 Remedial Actions at TCAAP Site C Excavation/Stabilization/Disposal of Contaminated Soils, Placement of Soil Covers,
Site Grading Site Grading Civil Engineering and Architecture
1 Effluent Guidelines for Construction Greg Davis USEPA
The Process of Mining Ridge Road Elementary 3 rd Grade Rice’s Homeroom.
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
Practice – CP-39 Farmable Wetland Program Constructed Wetland.
Bringing Marginal Land Into Production Don Day Extension Associate - Energy.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Vineyard Planting in Sonoma County Nick Frey Sonoma County Winegrape Commission.
Sec 2.5 – Max/Min Problems – Business and Economics Applications
Lignite Mining and Reclamation Process Joe Friedlander The Coteau Properties Co.
Erosion and Weathering. Erosion Erosion is the natural process of wind, water, or ice wearing away soil. Erosion becomes dangerous when humans cause erosion.
Erosion is the process by which the land surface is worn away by the action of wind, water, ice, or gravity - it is the process where soil particles are.
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
Comparative Regional Economic Advantages for Cellulosic Feedstocks for Bioenergy Production. Burton C. English.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Most Common Conservation Practices Forestry Illinois.
Kern River Natural Gas Line Expansion: A Case Study in Overcoming Adversity on a Mountainous Lineal Reclamation Project David Chenoweth, Joe Schneider.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Production Operations U.S. Department of the Interior Bureau of Land Management November 2006.
Seasonal High Tunnel Systems for Crops Interim Standard 798 Technical and Program Guidance National bulletin: National Bulletin: Idaho.
Forestry BMPs OUR GOAL: To Protect Our Waters and Site Productivity Through the Proper Use and Application of Best Management Practices. (BMPs)
Wes Marshall, P.E. University of Connecticut March 2007
Apex Mine Reclamation UTAH BOARD OF OIL, GAS AND MINING 2015 EARTH DAY AWARD Presented by: Dave Enos Manager, Dormant Properties Teck American Incorporated.
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
InVEST Analysis Lafarge Ecosystem Services Project Avoided Reservoir Sedimentation Results Lafarge Presque Isle Quarry.
$200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 Radius & Diameter Volume.
Minerals as Non-Renewable Resources in BC
By: Rick Ayers Yates County Soil & Water Conservation District
Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
The Mining Cycle Exploration MiningReclamation Metals-6-1 Images: Martin Miller.
Mineral Mining. Take a ride inside a mine video – Warm Up Video.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Soil and Rock Soil and rock are the principle components of many construction projects. Knowledge of their properties, characteristics, and behavior is.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Analysis of Sediment Yield from Unpaved Roads. Phase I: Unpaved Roads Inventory Field Data Collection  subwatershed scale  ~90 miles of roads  diversity.
Nonfarm Erosion Control
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Chapter 4 Land and Soil Resources Section 1 Conserving Land and Soil Notes 4-1.
© 2010 The Williams Companies, Inc. All rights reserved. Safe and Reliable.
Sustainable Aviation Biofuels Workshop Georgia Tech: H. Milton Stewart School of Industrial Systems & Engineering, December 3, 2015.
Mining Types, Effects & Reclamation Potash Solution Mining Ponds – Moab, Utah.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
Best 20 jobs jobs sites.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Rivanna Water & Sewer Authority Presentation to City of Charlottesville Workshop South Fork Rivanna Reservoir (SFRR) Dredging Concept Review May 6, 2008.
How Humans Impact the Lithosphere. Urbanization Destroying natural areas can reduce the beauty of an area and have a potential economic impact. Rapid.
2017 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting July 21, 2016.
EXAMPLE A 400 m2 (40 x 10 m) area is to be excavated, 1 m deep, with side slopes 2:1. As the width (10 m) is less than 30 times the depth (30 x 1 m), the.
Mining.
2017 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting January 19, 2017.
2017 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting October 20, 2016.
PS&E – Plans, specifications and estimate
JOHN HENRY NO. 1 MINE - SUMMARY
Costs: Harvest and process: $20-$30 per dry ton.
EPA Public Meeting Dallas, Texas May 10, 2005
Second Semester Exam Review Day 4
Costs: Harvest and process: $20-$30 per dry ton.
Olives for oils.
64 +/- ACRE SITE AVAILABLE
Presentation transcript:

2015 Bond Rate Guidelines for the Calculation of Land Reclamation Bonds on Coal Mining Operations MRAB Meeting April 23, 2015

Bond Rates for 2015 effective April 5 Unit OperationUnit MeasureUnit Costs ($) Mobilization/DemobilizationJob 4% of direct costs or $40,000, whichever is less Grading (< 500-foot push)Cubic Yard0.95 Grading (  500-foot push/haul) Cubic Yard1.20 Selective GradingAcre1, RevegetationAcre1, Tree PlantingTree0.75 Ditch ExcavationCubic Yard7.00 Jute MattingSquare Yard4.00 High Velocity Erosion ControlSquare Yard3.80 AASHTO No. 1Ton29.00 AASHTO No. 57Ton30.00 R3 Rock LiningSquare Yard33.00 R4 Rock LiningSquare Yard25.00 R5 Rock LiningSquare Yard27.00 Geotextile/Filter FabricSquare Yard2.80 PVC Lining 1 Square Yard12.00 Subsurface DrainLineal Foot19.00

5 Year Revegetation Trend

Bond Rates for 2015 effective April 5 Unit OperationUnit MeasureUnit Costs ($) Erosion and Sedimentation Control (Temporary Installation) Job Lump sum (5% of direct costs for site) Pond Removal Active Phase 2 Pond 3, Stage 3 Maintenance Bond Non-Cropland Areas (Land Uses Where Crop Yields Are Not Required) Acre Stage 3 Maintenance Bond Cropland (Not Row Crops) Pastureland Or Land Occasional Cut For Hay (Excludes Seed Cost) Acre Stage 3 Maintenance Bond Cropland Area- Row Crops (includes seed cost) Acre850.00

Bond Rates for 2015 effective April 5 Unit OperationUnit MeasureUnit Costs ($) Stage 3 MobilizationJob2, Pond Removal-Stage 3 Cubic Yards (Embankment Volume) Plus Top Soiling & Revegetation Cost Use <500 Grading For Pond Embankment Volume Plus Top Soiling & Revegetation Cost For The Area Disturbed Ditch Removal-Stage 3Lineal Foot0.75 Equipment Tire Removal and DisposalTire Structure Demolition Costs Will Be Calculated Using Costs Listed In The Construction Industry’s Latest Annual Cost Publications, Such As Means Building Construction Cost Data.

Bruce Carl Bureau of Mining Programs