Preparation for Sept 9mA studies: Follow-up items from February J. Carwardine, 22 May 2012.

Slides:



Advertisements
Similar presentations
Tuning FLASH for high beam currents July 6 th 2010 J. Branlard.
Advertisements

of LFD Compensation Study S1 Global Cryomodule
J. Branlard ALCPG11 – March 2011 – Eugene OR, USA Results from 9mA studies on achieving flat gradients with beam loading P K |Q L studies at FLASH.
11 ways to - High Dynamic Range Images 4 masking techniques 4 PS HDR methods 3 Third party tools Net tutorials:
Component-Level Design
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
Stimulating a discussion on cavity performance metrics.
November 2009 Network Disaster Recovery October 2014.
1 9 mA study at FLASH on Sep., 2012 Shin MICHIZONO (KEK) LCWS12(Sep.24) Shin MICHIZONO Outline I.Achievement before Sep.2012 II.Study items for ILC III.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
May 14, 2001E. Gallas/Trigger Database1 Status of the Trigger Database Elizabeth Gallas, Rich Wellner, Vicky White Fermilab - Computing Division See my.
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Grzegorz Jablonski, Technical University of Lodz, Department of Microelectronics and Computer Science XFEL-LLRF-ATCA Meeting, 3-4 December 2007 XFEL The.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
FAIR Accelerator Controls Strategy
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Recent LFD Control Results from FNAL Yuriy Pischalnikov Warren Schappert TTF/FLASH 9mA Meeting on Cavity Gradient Flatness June 01, 2010.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
Pulse for TM1 Version 4 New features, improvements and lots more.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Systems Solution Marketing Group Industrial Automation Business Headquarters Yokogawa Electric Corporation ISD-MASP-S05011 Copyright © Yokogawa Electric.
John Carwardine 21 st October 2010 TTF/FLASH 9mA studies: Main studies objectives for January 2011.
Definition: Automation is the use of control systems for operating equipment with minimal or reduced human intervention. + save labour + reproducibility.
1 Global Design Effort Beijing GDE Meeting, February 2007 Global Controls: RDR to EDR John Carwardine For Controls Global Group.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Hamburg European Linear Collider Workshop ECFA LC2013 Krzysztof Krzysik XFEL AMTF Cavity and Module RF Measurement Procedures.
1 Data Analysis of LLRF Measurements at FLASH Shilun Pei and Chris Adolphsen Nov. 16 – Nov. 20, 2008.
John Carwardine 29 October, mA meeting 1. Agenda 9mA workshop Data analysis DAQ refresher / online database 2.
John Carwardine 13 th April, 2011 Report on the 9mA program.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
1 The Software Development Process ► Systems analysis ► Systems design ► Implementation ► Testing ► Documentation ► Evaluation ► Maintenance.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
John Carwardine (Argonne) First Baseline Allocation Workshop at KEK September 2010 Experience from FLASH ‘9mA’ experiments Gradient and RF Power Overhead.
LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 LLRF for the FLASH 9mA Program S. Simrock DESY, Hamburg, Germany.
John Carwardine January 16, 2009 Some results and data from January studies.
Eurostat Standardisation DIME-ITDG 2015 Item 6 DIME-ITDG February
Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
RF control and beam acceleration under XFEL conditions Studies of XFEL-type Beam Acceleration at FLASH Julien Branlard, Valeri Ayvazyan, Wojciech Cichalewski,
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
John Carwardine TDR Writing: FLASH 9mA Experiment.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
2 Introduction ● Goals/deliverables: – Developed applications that will support LLRF controller work, operation and commissioning efforts as well as other.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
dependence on QL can not longer be seen
Studies Leader Report: 9mA webex meeting, 15th March 2011
LLRF systems status update
Tuner system Zhenghui MI 2017/01/17
Planning the Experiment
Outlook of future studies to reach maximum gradient and current
Automation and Feedbacks
Test plan of ESS HB elliptical cavity
LLRF Functionality Stefan Simrock How to edit the title slide
XFEL cavities and cryomodules measurements at AMTF
Tuner system for CEPC MI Zhenghui 2016/09/14
Test plan of ESS HB elliptical cavity
SPOKE Cavities frequency preparation plan and RF control procedures
AUTOMATED TESTING OF ITER DIAGNOSTICS SCIENTIFIC INSTRUMENTATION
Cryomodule Performance in FLASH and XFEL
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

Preparation for Sept 9mA studies: Follow-up items from February J. Carwardine, 22 May 2012

List of follow-up tasks from Feb 9mA studies Implement the gradient soft limiters on all cavities in ACC4-7 Determine suitable thresholds for the hard and soft limiters, develop procedures on how to use them Revisit methodology for robust quench detection (the quench server acting at the end of the pulse) Integrate and improve exception handling for the various interconnected servers (QL server, quench detect, piezo server, gradient flattening algorithm,...) Various refinements to the Loaded-Q server Implement an 'operations quality' version of my iterative gradient flattening algorithm Better (more complete) ways of doing off-line testing of new scripts, servers, automation, etc to reduce the requiring amount of dedicated machine time Implement Fermilab piezo tuner algorithm at CMTB Carwardine: 9mA meeting, 22 May 2012

Follow-ups Quench threshold identification –Revisit methodology for more robust quench identification Pre-limiter –Principle works very well, we now need more experience with it –Where to set the thresholds…? –How/when to use it, procedures, Testing automation and operations tools without beam time? –Real-time (pulse to pulse?) online simulator with DOOCS front-end Automation –Implement ‘operations-quality’ gradient flattening algorithm –Cross-linkages between automation tools – integration –Need better exception handling, better uniformity DAQ –Propose new DAQ specifications (AMTF, XFEL ?) Carwardine: 9mA meeting, 22 May 2012

Automation: new servers Piezo / Quench / Ql –All worked well –All can be improved –Need for uniformity among servers A centralized / unique QL measurement A centralized / unique detuning measurement Uniformity in various threshold definitions (i.e. low gradients, limiters, pre-limiters, etc…) –Need for priority among servers Sequence of action (sequencer ? state machine ?) –i.e. wait for cavity tuner before adjusting piezo –adjust cavity frequency before adjusting QLs –etc… Exception handling (e.g. motor moving, don’t change Ql) –communication & coordination between automatic servers Carwardine: 9mA meeting, 22 May 2012

Automation: QL Server Auto Ql –all ON / all OFF ability  DONE –settings Save/Restore (add to existing sequencer) –one-click return to default value (part of Save/Restore) –performance assessment (speed, accuracy) –automatic tuning strategy  flatten cavity tilts (9mA) with exception handling  other algorithms ? –getting a reliable QL measurement server is key Carwardine: 9mA meeting, 22 May 2012

Automation: Quench Server Quench detection –issues with time stamp (quenches detected after 3-4 quenches)  is it OK ? –some false alarms  why ? –still problems with changing RF flat top length –improve operator notification in case of quench –getting a reliable QL measurement server is key Carwardine: 9mA meeting, 22 May 2012

Automation: Piezo server Auto piezo server –could propose tuning action when DC bias is max –settings Save/Restore (add to existing sequencer) –needs to include pulse shortening  in the works –ability to selectively turn auto piezo ON / OFF –better detect ‘run-away’ situation and exception handling in general –getting a reliable detuning measurement is key Carwardine: 9mA meeting, 22 May 2012

Highest priority items for the Sept 9mA studies? Who will do the work? Then there are some machine issues needing follow-up –We want 800us pulses with at least 6mA Carwardine: 9mA meeting, 22 May 2012