RREPS'11, Egham (UK) Status of Beam Loss Detector Tests and Developments at PETRA III & ESRF Gero Kube DESY (Hamburg) Introduction: PETRA III Extension.

Slides:



Advertisements
Similar presentations
Ultimate Storage Rings PEP-X and SPring-8 II R. Hettel for the PEP-X design team and T. Watanabe et al., SPring-8 FLS 2012 JNAL March 7, 2012.
Advertisements

D. Lipka, MDI, DESY Hamburg; Temperature Simulation DCCT at PETRA III D. Lipka, MDI, DESY Hamburg.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
M. Bieler, M. Ebert, L. Fröhlich, J. Keil, J. Klute, G. Kube, G. K. Sahoo, R. Wanzenberg, DESY, Hamburg, Germany Abstract Acknowledgment Commissioning.
Purity measurement at SOLEIL Nicolas HUBERT # on behalf of the diagnostics group: N. Hubert, L. Cassinari, F. Dohou, M. El Ajjouri, M. Labat, D. Pédeau,
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
First birds’ flyInstituteCity, Country Namedistance [Km]Accelerator Yingbing9329SSRFShanghai, China Om6227 Igor6227NSLS-2Brookhaven, USA Yuke6227 Frank.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
The Future of Photon Science and Free-Electron Lasers Ingolf Lindau Lund University and Stanford University MAX-Lab and Synchrotron Light Research KTH,
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
3rd Libera Users Meeting
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
ERHIC design status V.Ptitsyn for the eRHIC design team.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
PETRA III, A New High Brilliant Light Source At DESY
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
Low Emittance Rings 2014 Workshop INFN-LNF, 18. September 2014 Low Emittance Studies at 3 GeV at PETRA III Joachim Keil DESY.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Design of New LLRF System for the SPring-8 Storage Ring T. Ohshima on behalf of RF team of SPring-8-II project LLRF Workshop Shanghai.
Fibre Beam Loss Monitoring system development BI - day 10 March 2016 M. Kastriotou, E. Nebot del Busto M. Boland, F. S. Domingues Sousa, E. Effinger, E.B.
Beam Loss Monitor activities at CTF3 and the Australian Synchrotron CLIC Workshop 18 January 2015 M. Kastriotou, E. Nebot del Busto M. Boland, E.B. Holzer,
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
SLS-2/Cosami meeting Mar. 16, 2016
Observations of Electron Cloud Phenomena at PETRA III Presentation at the ECLOUD 2012 workshop Rainer Wanzenberg ECLOUD 2012 June 5-8, 2012 Hotel Hermitage.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Click to edit Master subtitle style 37th ICFA Advanced Beam Dynamics Workshop on Future Light Sources Status of Beam Loss Detector Tests and Developments.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
Report Technical Director Storage-Ring-Installation Completed
PETRA III at DESY Hamburg/Germany
PETRA III, Status and Upgrade
Experiments on Fast Ion Instability at PLS
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Bocheng Jiang SSRF AP group
PETRA III. Machine development Satellite bunch clearing
Beam loss monitor development at the ESRF Friederike EWALD ESRF
Coupling Correction at the Australian Synchrotron
Recent Studies of Injection System at
Controls CBETA controls will extend existing EPICS control system
Top-Up Injection for PEP-II and Applications to a Higgs Factory
PETRA IV Lattice Studies
Machine Operation and Progresses in SSRF
Positron vs. Electron Beam Behavior
Beam Current Monitoring with ICT and BPM Electronics
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
PETRA IV System design concept Old and new machine
O. Leupold, H. C. Wille, I. Sergueev, M. Herlitschke, P. Alexeev, C
MEIC Alternative Design Part V
Presentation transcript:

RREPS'11, Egham (UK) Status of Beam Loss Detector Tests and Developments at PETRA III & ESRF Gero Kube DESY (Hamburg) Introduction: PETRA III Extension Project Beam Loss Monitor Tests @ ESRF

DESY Accelerator Complex FLASH I FLASH II E-XFEL PETRA III DESY II LINAC II PIA P3X-N P3X-E Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015

PETRA III Extension Project Storage Ring PETRA III PETRA III parameters circumference: 2304 m energy: 6 GeV emittance: 1 nm.rad current: 100 mA # bunches: 40 / 960 straight sections: 9 user beamlines: 14 → 1.2 nm.rad → 24 Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015

P3X Commissioning project schedule 3.2.2015: first beam back in PETRA 13.2.2015: first stored beam external users: end of April 2015 end of March 2015: back in user operation Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015

P3X: Diagnostics Tasks expectation… Ubaldo: „I'm sure you guys at Desy have interesting studies to show at the DEELS15!” …and reality how to operate sensitive electronics (Liberas) if only the shell of the buiding is complete… how to seal the roof of your diagnostics cabinet if you have normal rain in Hamburg… how to dry and clean the components if it was not successful… and so on… Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015

PETRA III: Touschek Factory… RREPS'11, Egham (UK) PETRA III: Touschek Factory… operation in time resolved (40 bunch) mode Touschek limited lifetime → τ ≈ 1.4 h top-up operation observation of radiation damage → rust at undulator magnets → undulator performance degradation → damaged cables magnet structure of two undulators had to be replaced during P3X shutdown PETRA III: need for new BLM system talk Dirk Nölle (DESY): E-XFEL standard beam diagnostics → XFEL-BLM system based on PMT and radiator DEELS 2014 @ ESRF XFEL-BLMs for PETRA III ??? Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015

BLM Tests P3X shutdown: no tests possible @ DESY RREPS'11, Egham (UK) BLM Tests BLM installation @ ESRF in cell 4 behind scraper P3X shutdown: no tests possible @ DESY → proposal: ESRF (Kees Scheidt) BLM setup Hamamatsu R5900 PMT synthetic fused silica (SQ1) radiator → Cherenkov radiation → no lead shield necessary (?) A. Kaukher et al., Proc. DIPAC 2011, TUPD21 Proc. BIW 2012, MOPG007 Libera BLD (Spark) → DC-to-8 MHz BW @ 50Ω input (DC-to-10kHz BW @ 10kΩ input) Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015

origin of measured loss signals well understood BLM Test @ ESRF single bunch injection into the main ring scraper SCRATCH4/INT inserted → all beam dumped into the scraper → one signal expected from BLM scraper SCRATCH4/INT out, …/EXT inserted → signals from: injection, crashing, passing beam → three signals expected from BLM origin of measured loss signals well understood Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015

BLM Test @ ESRF dark current injection into the main ring e-gun off injector chain as for usual operation screen behind septum inserted → generate losses from single electrons all BLMs are sensitive for single electron losses good S/N level from DESY-type BLM → not the same losses observed Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015

BLM Test @ ESRF filling pattern: 16 bunches, equally distributed scraper pos. 20 filling pattern: 16 bunches, equally distributed h = 992, fRF = 352.202 MHz → Trev = 2.817 μsec, tbucket = 2.84 nsec internal horizontal scraper moved in BLM signal scraper position [a.u.] ADC samples 176.03 nsec 1 turn: 2.817 μsec 16 bunches filling pattern nicely reproduced losses from individual bunches resolved Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015

BLM Test @ ESRF filling pattern: 1/3rd fill h = 992, fRF = 352.202 MHz scraper pos. 62 filling pattern: 1/3rd fill h = 992, fRF = 352.202 MHz → Trev = 2.817 μsec, tbucket = 2.84 nsec internal horizontal scraper moved in scraper position [a.u.] ADC samples BLM signal 0.954 nsec 2.817 μsec 331 bunches filling pattern nicely reproduced system bandwidth → no single bunch resolution Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015

BLMs will be a critical system for diffraction limited storage rings Summary and Outlook PETRA III back in operation after 1 year shut-down test of XFEL-BLMs at ESRF beam parameters reached good S/N level → internal/external power supply no lead shielding required (high radiator purity) → at least at location of test setup discrepancy between loss rate from BLMs and lifetime → measured loss rate (scraper inserted) much smaller than expected from lifetime - small signals not detected @ 50Ω impedance, i.e. high input impedance advantageous - influence of loss geometry (?) BLM tests will continue at PETRA BLMs will be a critical system for diffraction limited storage rings Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015

Specs PMT specs → 1140,- EUR / piece R7600U Series: radiator synthetic fused silica (SQ1) slab: 30 x 220mm j-plasma GmbH Jena (Germany) → 490,- EUR / piece Gero Kube, DESY / MDI DEELS 2015 Workshop @ ALBA, 15.06.2015