The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Kayah State Office Priorities and Detailed Description of.

Slides:



Advertisements
Similar presentations
National Electrification Planning for Myanmar (NEP):
Advertisements

11 PUBLIC WORKS AND INFRASTRUCTURE DEVELOPMENT ENERGY & ELECTRICITY PROJECTS IN THE CENTRAL REGION Director: K.J Leepile SEPTEMBER 2011.
1 SINGLE-PHASE METALLIC RETURN TECHNIQUE Presented by Moncef AISSA Senior Engineer STEG-Tunisia March 7, 2006 contributors - E. Cecelsky - A. Ounalli -
Customer Meeting April 28, 2010 Torrington, WY. Agenda Introductions Accomplishments Update on Torrington Area PVVC Overview PVVC Schedule and Cost Estimates.
Outline of JICA’s Assistance prepared for
Ensure the quality of the data National Bureau of Statistics of China September 2012.
Policies.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Power Grid
Charles Hosken, General Manager Imperial Irrigation District
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
Myanmar: Towards Universal Access to Electricity by 2030 Nay Pyi Taw, January 28, 2015.
Rural Electrification Access by Department of Rural Development
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Vision for Power Sector: To Ensure reliable & quality power supply to all citizens by 2021 at an affordable price. Vision 2021: To be a Middle-Income.
The Republic of the Union of Myanmar Ministry of Electric Power
Submitted to: Submitted by:
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A SUMMER TRANNING PRESENTATION ON 400 KV GRID SUB STATION BIKANER
The Republic of the Union of Myanmar Ministry of Electric Power
1 Manufacturer’s Outreach Workshop, Thingaha Hotel, Naypyitaw Myanmar. October
Department of Electrical Engineering
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Ayeyarwady Region Office Priorities and Detailed Description.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Mandalay Region Office Priorities and Detailed Description.
Submitted To:- Submitted By:- Mr.
Myanmar: Toward Universal Access to Electricity by Role of Minihydro Xiaoping Wang Senior Energy Specialist World Bank July 30, 2015.
- Discuss the measurement of power in circuits - Learn how to construct parallel circuits and how they behave differently from series circuits - Define.
Block Diagram of a Typical Electric Supply System
A PRESENTATION On 400KV GSS SURPURA JODHPUR
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
Special Education in Thailand: Mae Hong Son Model By Amnat Wichayanuwat (Ph.D) Director of Bureau of Special Education Office Of The Basic Education Commission.
GCSE Science A Physics 1 Transmission of Electricity Learning Outcomes Understand the need for an electrical distribution system Describe the national.
1 Select Committee on Economic Development Progress relating to the implementation of Integrated National Electrification Programme (INEP)
Current status & future plans for power system development U Moe Thet, Deputy Chief Engineer Power System Department Myanma Electric Power Enterprise.
Investment opportunities in public infrastructure
Douglas Bowman, PE, PMP Project Manager Entergy Corporation New Projects and Processes Ensure Power Transfer for Northeast Arkansas Customers.
Economic Comparison off Grid System. Q1 : Sizing of Solar Panel System Let us consider that one house needs following loads; 10W, 2 lamps for 3 hours.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Rakhine State Office Priorities and Detailed Description.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Kayin State Office Priorities and Detailed Desription of.
How IT Transition can feed green growth and energy transition through innovation 25th MAY, 2016 Masaaki Yamamoto New Energy and Industrial Technology Development.
Current Electrified Villages Sagaing Region Townships - 11 Villages - 91 Households Kayin State Townships - 5 Villages Households
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Eastern Shan State Office Priorities and Detailed Description.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Magway Region Office Priorities and Detailed Description.
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
Ministry of Electricity and Energy
Communications channels, tools and methodologies
The Republic of the Union of Myanmar Ministry of Electric Power
Sub Station.
National Training Programme For C&D Employees (Variant 3-Financial Management ,Store Accounting and Office Admininstration) )
The Republic of the Union of Myanmar Ministry of Electric Power
SUB-STATIONS.
Electricity is produced at the power station.
The distribution grid Carcano & Cividini V A/AUTOMAZIONE
The Current Status of Cooperative in Myanmar
The Republic of the Union of Myanmar Ministry of Electric Power
Chapter # 25 Sub-Stations risemark.pbworks.com.
Information about the resort recreation area "Kenderli"
Electric Utility Master Plan Update
Off-grid Electrification Department of Rural Development
The Republic of the Union of Myanmar Ministry of Electric Power
AGRICULTURAL COOPERATIVES ACTIVITIES IN MYANMAR
The Republic of the Union of Myanmar Ministry of Electric Power
Installation And Estimation of Service Connection
Yangon Region Rural electrification plan
The Republic of the Union of Myanmar Ministry of Electric Power
The Republic of the Union of Myanmar Ministry of Electric Power
ENCLAVE POWER COMPANY LIMITED
BRIEFING ON THE INTERCONNECTION LINES OF THE
Puerto Rico Electric System Challenges Ahead
Presentation transcript:

The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Kayah State Office Priorities and Detailed Description of Electrification Plan For Kayah State Dated -21.Oct.2015

As Per DE Idea after discussion with Local government As the whole Kayah State, we must perform for only submitted village in demoso township with NEP project that a village locate in the distribution line within two miles.Nowaday there is only five village ( wich are situated within two miles ) left according to NEP plan.In currently time, we are distributing the electricity to the quarters fo hpruso and 12Villages neighboruing hpruso with 33/11kV,1.25MVA transformer but we have been Improving to fulfill the demand of electricity for 14villages neighbouring hpruso in fiscal year and 44villages neighbouring hpruso in fiscal year with regional government budget.So, we would like to submit that to change the currently 33/11kV, 1.25MVA transformer as a 33/11kV, 5MVA transformer. At that time, we are ferforming the distribution line and substation. The distribution for 33kV 36.5miles,the substation for 33/0.4kV transformer 7Nos,the distribution line for 11kV 48.5miles, the substation for 11/0.4kV transformer 8Nos and the distribution line for 400V 6.3miles so as to get electricith for 15 village of neighbouring Hoyar in hpruso township with regional government budget. As a matter of fact, we would like to submit to improve 33/11kV,5MVA transformer hpruso township and then to build for 33/11kV 1.25MVA substation surplus transformer of hpruso township for hoyar. We would like to subit that we alreay negotiated with regional grovrnment that the relevant proposal plans and the condition of tasks. 2

Priority Electrification Project List for Kayah State NoDistrictTownshipNos of VillageRemark 1Loikaw Demoso5 Within 2 miles Distance from existing grid Line Hpruso57 Upgrad 33/11kV 1.25MVA to 5MVA 33kV Outgoing Switch Bay 1No Hpruso ( hoyar )8 33/11kV, 1.25 MVA 1No Total 70 3

NoNo District No of Village To be Electrif ied No of Hous e Hous e hold Popu la tion To be constructed Estima ted cost (Mil Kyates ) Task by regional 400 V Lines (Miles ) Estimat ed cost (Mil Kyates) Cost for 11 kV Line11/0.4 kV Transformer Mile Materi al Cost Trans port Cost Cons truc tion Cost TotalKVANo Materia l Cost Trans port Cost Constr uc tion Cost Total 1 Loikaw Distrit Bawlak he Total Detailed Electrification Plan for Kayah State (Within 2 miles from Existing 11 kV Distribution Line) 4

Electrification Plan for Villages of Kayah State (Within 2 miles from Existing 11 kV Distribution Line) To be Constructed  33/11kV Transformer 2 Nos  33kV Outgoing Switch Bay 1 No  11kV Distribution Line 2 miles  400V Distribution Line 2.3 mile  11/0.4 kV Distribution Transformer 4 Nos Kayah State No. of Villages - 70Nos Household Estimated Cost (mil kyats) Loikaw District No. of Villages - 70Nos Household Estimated Cost (mil kyats) 5

Detailed Electrification Plan for Loikaw District (Within 2 miles from Existing 11 kV Distribution Line) No Town ship No of Villag e To be Electr ified No of Hous e Hous e hold Popu la tion To be constructed Estima ted cost (Mil Kyates ) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Lines (Miles ) Estimat ed cost (Mil Kyates) Mile Mater i al Cost Trans port Cost Constr uc tion Cost TotalKVANo Mater ial Cost Trans port Cost Constr uc tion Cost Total 1 Demos o Total

33/11kV ( 5 MVA) Ngwetaung Substation ( Existintg) 33/11kV ( 1.25MVA) Hpruso Substation ( Existing ) Dawsoshae Village 11/0.4 kV(50 kVA) Dawlawkhuthit & Dawlawkhu houng Village 11/0.4 kV(50 kVA) Dawsophya Village 11/0.4 kV(100 kVA) Legend 33/11kV Sub station ( Existing) 11kV Line ( Existing) 11kV Line 2Mile ( Proposal) Village( Proposal) Location Map of Electrification Plan for Loikaw District (Within 2 miles from Existing 11 kV Distribution Line) Soungduywarthit Village 11/0.4 kV(50 kVA) Loikaw District No. of Villages - 5Nos Household Estimated Cost (mil kyats) 7

Detailed Electrification Plan for Loikaw District (Within 2 miles from Existing 11 kV Distribution Line) No Town ship Name of Village To be Electrifi ed No of Hous e Hous e hold Popu latio n To be constructed Estim ated cost (Mil Kyate s) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Lines (Miles ) Estima ted Cost (Mil Kyats) mile Materi al Cost Trans p ort Cost Constr uction Cost TotalKVANo Materi al Cost Tran spor t Cost Cons tructi on Cost Total 1. Demos o Soungdu- ywarthit Demos o ‌Dawsoshe Demos o Dawsoph a Demos o Dawlawkh u Demos o Dawlawkh u thit Total

33/11kV ( 5 MVA) Ngwetaung Substation ( Existintg) 33/11kV ( 1.25MVA) Hpruso Substation ( Existing ) Soungduywarth it Village 11/0.4 kV(50 kVA) Dawsoshae Village 11/0.4 kV(50 kVA) Dawlawkhuthit & Dawlawkhu houng Village 11/0.4 kV(50 kVA) Dawsophya Village 11/0.4 kV(100 kVA) Legend 33/11kV Sub station ( Existing) 11kV Line ( Existing) 11kV Line 2Mile ( Proposal) Village( Proposal) Location Map of Electrification Plan for Demoso Township (Within 2 miles from Existing 11 kV Distribution Line) 9

Seri al Township To be ConstructedThe effective area Estimated Cost ( Mil Kyates ) Substatio n 66 kV Line(mil e) 33 kV Line (mile) Totall Villages Total House Hold Total Popu lation Materials Cost Construct ion Cost Total 1Hpruso 33/11kV upgrad 1.25 to 5 MVA With 33kV utgoing Switch Bay 1No Hpruso ( Hoya ) 33/11kV 1.25 MVA Total The additional electrification statement due to newly and upgrading 66/33/11kV substation and related power Line for Kayah State Remark 33/11kV, 1..25MVA transformer ( Hpruso )is going to promate as 33/11kV 5MVA transformer and the surplus 1.25MVA transformer is going to build in Hoyar. 10

Location Map for 33/11kV Substation 2Nos & 33kV Outgoing Switch bay at Hpruso Township Upgrad 33/11kV 1.25MVA (Existing) to 5MVA and 33kV Outgoing Switch Bay 1No 33/11KV, 1.25MVA Substation 1No 11

NoNo Fiscal Year Staet Capital Budget for ESE ( mil Kyats ) Staet Capital Budget for DRD (mil Kyats ) Electrified Connection Total Cost for 11kV Line & 11/0.4 TR Total Cost for 400V Line TotalOff Grid ON GridOff Grid Villa ge ( Nos ) Consum er ( Nos ) Villag e ( Nos ) Consum er ( Nos ) Estimate ( BE + RE ) Estimate ( BE + RE ) Budget Estimate( BE) Grand Total The Statement Fiscal Yearly Budget and Electrified Connection for Kayah State 12

Sr No Description Quantitie s Transported Site 133/11 kV,5 MVA Transformer1 No Loikaw District, PMO Office 233kV Outgoing Switch Bay Accessories1 Set Loikaw District, PMO Office 3 33kV Incoming Switch Bay, 33kV Control pannel and 11kV 1 incoming 2 outgoing cubical for 1.25MVA And Accessories 1 Set Loikaw District, PMO Office 411/0.4kV, distribution transformer4 No Loikaw District, PMO Office 510 meter Concrete Pole100 Nos Loikaw District, PMO Office 6A C S R 95 mm Tons Loikaw District, PMO Office 711kV Pin Insulator with Spindle230 Nos Loikaw District, PMO Office 811kV Disc Insulator with fittinggunset72 Set Loikaw District, PMO Office 9Other Materials1 Lot Loikaw District, PMO Office Main Materials List Transported to Loikaw District Office 13

14