LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.

Slides:



Advertisements
Similar presentations
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Advertisements

Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
SPS New Wire Scanner Mechanics Review
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
LHC-CC10, 4th LHC Crab Cavity Workshop Summary Session 5: Crab Cavity Beam Studies P. Collier.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.
News and hot topics Impedance meeting 14/04/2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Impedance Working Group Update ICE meeting June 12 th 2013.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Impedance of current TCP compared to new TCP with button.
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
Wim Weterings Remy Noulibos
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
ECR (SPS Flange Impedance Reduction) Follow up for IWG C. Vollinger 16/08/2016.
Report Technical Director Storage-Ring-Installation Completed
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
LIU – EVM status and next steps
SLAWG #15 ZS fiducialisation and alignment today
Brief Status SPS Prototype PSB Prototype Installed in LS1
ELENA installation and commissioning status
LIU Wire Scanner Milestones June 2017
LIU – EVM status and next steps
SPS - EYETS 2016/17 Vacuum systems planning
on behalf of the RF group
EC Activities Status for the LIU
AWAKE proposals for BE/BI
Long Shutdown for the LHC: Vacuum Beam Pipes
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
10 MHz amplifier status G. Favia
Status of the BI Work Package in the LIU-PSB frame
Possible causes for SPS ZS2 misalignment
Upgrade Strategy for the Experimental Vacuum Systems
LIU and TE/ABT/PPE activities
TE-MSC activities in SPS during YETS
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Impedance working group update
Impedance working group update 07th August 2013
LIU-SPS review for BI (no BWS)
Status of the BI Work Package in the LIU-PSB frame
Current impedance issues
PS KFA45_17 Wire Measurements and Simulation
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015

Outline 20/11/2015 SPS ZS improvement LIU SPS3 ZSTF 1 st upgraded ZS Impedance Measurement results Design and construction strategy New Itrap Box dedicated talk G.Raffaele Design Budget Planning Conclusion

ZSTF Solenoid for e-cloud suppression Promising, need more tests to confirm before propose to use as a base line for LSS2 extraction line. 4 20/11/2015 SPS ZS improvement LIU SPS MD note : MD note : The ZS solenoid appear effective at the ZSTF, with the scrubbing beam in the SPS. Effects can be observed with currents up to 25 A, corresponding to a solenoidal field of approx mT. The vacuum activity wasn’t fully suppressed, and the need to maintain a field in the main gap to see the effect still isn’t understood.

1 st upgraded ZS 5 20/11/2015 SPS ZS improvement LIU SPS ready to be installed in LSS2 to replace ZS 4 during YETS Since we have to install it between existing MPs, extra cables are required if we like to profit from the additional pumping. DIC in preparation by VSC. Need to decide strategy with RF screen and solenoid. Hybrid solution, need no move BLM as well !!!

ZS and Pumping Module (actual, no screen) 6 20/11/2015 SPS ZS improvement LIU SPS

7 ZS and Pumping Module with screen 20/11/2015 SPS ZS improvement LIU SPS

ZS with new interconnect 8 20/11/2015 SPS ZS improvement LIU SPS Remaining Cavities

ZS with new interconnect and updated screen 9 20/11/2015 SPS ZS improvement LIU SPS

ZS Impedance Measurements 10 20/11/2015 SPS ZS improvement LIU SPS Beam Impedance Measurement done by Hugo using wire installed on a spare ZS with simplified elliptical beam pipes (both ends). Insert and new elliptical beam pipe effectively suppress any longitudinal modes below 1.2GHz. Much better impedance performance longitudinally Need some feedback from Beam Impedance Team to validate the concept and use it as a base line.

11 20/11/2015 SPS ZS improvement LIU SPS Design and construction strategy EN/MME Job created to start August, postponed for LIU priorities (started in November). Weekly meeting planned to monitor follow up BI part for interconnect still to organise Tank modifications being finalised at main workshop still this year (all 10 tanks modified) VSC qualification of first tank done. Construction of interconnects to be subcontracted via EN/MME Updated RF screen design still to be validated by impedance team.

EVM DescriptionZS improvement activities Budget codes /11/2015 SPS ZS improvement LIU SPS Year PV EV AC Metrics per year in kCHFCumulative metrics per year in kCHF Year PV EV AC

Planning 1/yr tank to be assembled; by LS2 5 tanks ready 1 st tank may already be installed during this YETS Interconnects to be designed 2016, built in 2017 Purchase of vacuum equipment during continues for 2 tanks/yr (spares) Resources available: 0.5 FTE cp B (2015 – 2017) 0.25 FTE cp C (2015 – 2019) 0.25 FTE cp D (2015 – 2018) Missing: cp B/C 0.5 (2018 – 2019) 13 20/11/2015 SPS ZS improvement LIU SPS

Conclusions Concept design finished. Impedance approach validated with lab tests. To be endorsed by SPS study group. First upgraded tank successfully tested (HV as well as vacuum). Budget looks reasonable so far. Lacking technician from 2018 onwards /11/2015 SPS ZS improvement LIU SPS

THANK YOU FOR YOUR ATTENTION!

ZS Beam Coupling Impedance Measurements Old Design: -BI/Pumping Modules had large beam pipe – cavity modes had large volume in which to exist – low frequencies -Ion trap isolated – whole ZS vacuum tank visible to beam – Many cavity modes New Design: -Pumping modules replaced with elliptical beam pipe with smaller aperture -Screen/insert placed at opening of ZS vacuum tank screening it from the beam -Addition of insert suppresses many low frequency cavity modes. Does create a large new one at 1.38GHz -Insert and new elliptical beam pipe effectively suppress any longitudinal modes below 1.2GHz. Much better impedance performance longitudinally H.Alistair