Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Extending Switching Reclosing Time to Reduce Interruptions in Distribution Networks.

Slides:



Advertisements
Similar presentations
CONDITIONS FOR SUCCESSFUL INTERRUPTION:
Advertisements

New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
IEC Short-circuit current making and breaking tests Taiwan-European HVAC apparatuses Accreditation and Certification forum Harethe El Ouadhane.
Assessment of Risk Against Regulator Requirements for Duration of Long Supply Interruptions Mohd Ikhwan Muhammad Ridzuan Dr Sasa Djokic The University.
Frankfurt (Germany), 6-9 June 2011 Muhammad Ali, Jovica V. Milanović Muhammad Ali – United Kingdom – RIF Session 4 – 0528 Probabilistic Assessment Of Wind.
EE 369 POWER SYSTEM ANALYSIS
SHUNT CAPACITOR FUNDAMENTALS AND PROTECTION
Frankfurt (Germany), 6-9 June 2011 Ying Wang – China – Session2– Paper 0587 Voltage Sag Frequency Assessment Considering Customer Satisfaction Degree Ying.
5/21/2015 Using Simulation Tools to Predict and Prevent Vacuum Circuit Breaker Switching Induced Transformer Failures Steven B. Swindler,
Frankfurt (Germany), 6-9 June 2011 Gerhard Theil Technical University Vienna Institute of Energy Systems and Electric Drives
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
ON DIMENSIONING LVDC NETWORK CAPACITANCIES AND IMPACT ON POWER LOSSES
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Frankfurt (Germany), 6-9 June 2011  Speaker Jean LAVALLÉE  Authors Janislaw TARNOWSKI, Jacques CÔTÉ, André GAUDREAU, Pierre GINGRAS, Mircea IORDANESCU.
Power by Innovation… Innovation Through Partnerships Demonstration of the long-term reliability of XLPE insulation used in MV cables in South Africa by.
McGranaghan US Session 2 Block 4 Question 12 Barcelona May Statistical Framework for Establishing Target Reliability Levels and Classifying.
Frankfurt (Germany), 6-9 June 2011 Achim Hobl – Germany – RIF Session 1 – 0352 – p 1 Nexans' Superconducting Fault Current Limiters for medium voltage.
Means & Methods of Homogeneous Charge Combustion P M V Subbarao Professor Mechanical Engineering Department A Sudden Combustion, Yet Needs A Care & takes.
Frankfurt (Germany), 6-9 June 2011 Luciano Martini – IT – RIF S1 – Paper 1162 The ECCOFLOW EU FP7 Project: Design and Simulations Results of a Superconducting.
Circuit breakers The main purpose of a circuit breaker is to: Switch load currents Make onto a fault Break normal and fault currents Carry fault current.
SEMINAR REPORT ON SF6 CIRCUIT BREAKER BRANCH-EEE.
Transformer Taking the ratio of the two equations
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Frankfurt (Germany), 6-9 June 2011 Hans-Erik Olovsson – Sweden – Session 1 Network Components – Paper 0453 Innovative Compact 145/12 kV Indoor Air Insulated.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
Frankfurt (Germany), 6-9 June 2011 Luciano Martini – IT – RIF S1 – Paper 0339 Development and Testing of Innovative Fault Current Limiters for Distribution.
© ABB PTMV - 1, ABB Overhead Distribution Systems.
Frankfurt (Germany), 6-9 June 2011 MOCCI – IT – RIF Session 5 – Paper 999 Multi-Objective analysis of Regulatory frameworks for Active Distribution Networks.
Dynamic Thermal Ratings for Overhead Lines Philip Taylor, Irina Makhkamova, Andrea Michiorri Energy Group, School of Engineering Durham University.
Manjula Dewadasa Arindam Ghosh Gerard Ledwich
Frankfurt (Germany), 6-9 June 2011 Analysis of Protection Malfunctioning in Meshed Distribution Grids Evita PARABIRSING Dr. Edward COSTER Dr. Marjan POPOV.
A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Lecture 18 Fault Analysis Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
On-line Condition Monitoring of Distribution Network Assets – Making the Network Smarter Neil Davies Neil Davies – UK – Session 1: Network Components –
1 Progress of, and prospects for, commercial applications of UHV 1100kV Transmission System in TEPCO 2 nd International Symposium on International Standards.
1 Power Quality EKT 451 CHAPTER 8. 2 Introduction Utilities transmit electricity over power lines into home as an alternating current (AC) wave. This.
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Frankfurt (Germany), 6-9 June 2011 KOSTIAINEN– FI – S3– 0622 Paper 0622 TOWARDS SELF-HEALING POWER DISTRIBUTION BY MEANS OF THE ZONE CONCEPT  Antti Kostiainen,
Frankfurt (Germany), 6-9 June 2011 Detailed Analysis of the Impact of Distributed Generation and Active Network Management on Network Protection Systems.
Introduction  Utilities transmit electricity over power lines into home as an alternating current (AC) wave.  This is how power travels through wiring.
Frankfurt (Germany), 6-9 June 2011 Manuel Avendaño J. V. Milanović Manuel Avendaño – UK – Session 2 – Paper 0529 METHODOLOGY FOR FLEXIBLE, COST-EFFECTIVE.
Frankfurt (Germany), 6-9 June 2011 HOW THE CUSTOMERS PERCEIVE THE PROBLEM OF VOLTAGE QUALITY Martin KAŠPÍREK David MEZERA
SMJE 2103 Overvoltage, Electrical Insulation and Protection Devices.
ECE 498HZ: Power Distribution System Analysis
LIGHTENING PROTECTION USING LFA-M
EE 2353 HIGH VOLTAGE ENGINEERING Faculty Name :A.JAIBUNISHA Faculty Code : EE 58 Designation : LECTURER Department : EEE.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Alexandre Piantini University of São Paulo Lightning Transients in Medium- Voltage Power Distribution Lines V Russian Conference on.
KILOMETRIC FAULTS: NATURE, AFFECTING PARAMETERS, AND IMPACT ON THE BREAKER STRESSES _____________________________ Mohamed M. Saied Electrical Engineering.
  The traditional molded-case circuit breaker uses electromechanical (thermal magnetic) trip units that may be fixed or interchangeable.  An MCCB provides.
Protection of Power Systems
By:- Abhishek Bhardwaj IV year VIII sem Roll NO.– four(04)
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
High Voltage Engineering
35kV Assessment SWEDE 2007 May 10, 2007.
WELCOME TO ALL.
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
Circuit Breakers & Reclosers
Fault Statistics – Quo Vadis Günther Brauner AT
Protective Relaying Conference
ELECTRICAL POWER-II Electrical engineering sixth semester
LOAD BEHAVIOUR DURING VOLTAGE DIPS
Protection against over voltages
CIRCUIT BREAKERS E. Chikuni. Circuit Breakers Mechanical Switches capable of making and breaking currents under normal circuit conditions and for a specified.
HIGH VOLTAGE ENGINEERING Presented By P.Sindhu Asst.Prof EEE Dept
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Substation Equipment's
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Extending Switching Reclosing Time to Reduce Interruptions in Distribution Networks G. Celli, E. Ghiani, F. Pilo and S. Tedde Department of Electrical and Electronic Engineering University of Cagliari ITALY

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Introduction Performance-based rates (PBRs) are regulatory orders that reward utilities for good reliability and penalize them for poor reliability. Large deployment of network automation with reclosing practices has been adopted by distributors to achieve the reliability performance goals Italian example: order 333/07 provides for payment to each MV customer which suffers a number of long unplanned interruptions per year higher than a threshold.

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Introduction The reward and penalty mechanism is based on specific reliability indicators:  SAIDI  SAIFI  MAIFI Implementation of Multiple Auto Reclose Operation Long unplanned interruption (> 3 min) Short unplanned interruption (> 1 s and < 3 min)

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Goal of the paper  investigate the possible benefits of the extension of the switching reclosing time delay before the first fast reclosure.  develope a probabilistic fault arc reignition model in order to estimate these benefits.

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Auto-reclosing Several faults on overhead lines are temporary. Most of them can be successfully eliminated adopting a fast auto-reclosing of the circuit breaker. Minimum dead time adopted is 300 ms (reasonable deionization time)

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Auto-reclosing Effectiveness of high speed auto-reclosing depends on the origins of the temporary fault.  adverse weather conditions, saline deposit on insulators or switching overvoltages,  lightning strikes followed by several subsequent strokes,  contact with an external object (like a bird or a dead wood). Moreover, the DSOs have experienced some faults inside metal enclosed electrical installations that, starting as single- phase-to-ground fault, evolve to double phase.

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Fault Arc In order to simulate the complete transient behaviour of a fault in distribution networks with auto-reclosing, the fault arc model and the dielectric strength recovery model have to be implemented. Classical Cassie and Mayr fault arc model The stationary arc conductance, G, depends on instantaneous arc current, arc voltage, arc resistance, and the instantaneous arc length. Typically, this model is in relationship with an arc reignition model after every zero crossing of the arc current.

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Reignition Arc Model The previous reignition model is valid only immediately after the arc interruption (self-extinguish conditions). A new reignition model has been developed by correlating the insulation recovery characteristics with the temperature variation in the zone surrounding the fault for arcs in order to take into account the flashover probability variation.

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Reignition Arc Model A thermal model has been implemented in the EMTP program to represent the temperature rise in the surroundings of the fault arc and the subsequent cooling when the arc is interrupted.

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Reignition Arc Model By enlarging auto- reclosing dead time,  t DT better recovery of the dielectric strength reduced risk of flashover:

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Case Study The probabilistic fault and reignition arc models has been implemented with the commercial package EMTP-RV. Simplified 20 kV the test network A Monte Carlo simulation has been performed: fault position, fault resistance, fault arc, environmental conditions, …

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Transient Faults Reduction 400 ms is sufficient for single-phase to ground fault in free air. An important reignition fault reduction has been observed for faults inside MV cells, bigger moving from 400 ms to 600 ms.

Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Conclusions A new tool for studying the auto-reclosing operation in MV distribution network has been developed, which permits investigating the effects of changing the reclosing time. Increasing the auto-reclosing dead time up to 600  800 ms reduces the probability of arc reignition especially for transient faults inside metal enclosed electrical installation. The impact of the increased reclosing time on the severity of voltage dips is minimal since the equipment is already susceptible for shorter voltage dips.