Long-term Security of Gas Supply in a Liberalized Market Jean-Paul PINON Director Gas Market, CREG Co-chairman of the Gas Working Group, CEER UNEC Round.

Slides:



Advertisements
Similar presentations
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Advertisements

Commercial Bank Operations
1GTE – October 23rd 2003 Regulation of the gas market in France Dominique JAMME Gas Directorate
Second Asia Gas Buyers’ Summit Mumbai, 2-3 February 2004
Algiers, 30 th -31 st january 2001 EMERGING INVESTMENT OPPORTUNITES IN ALGERIAS ENERGY AND MINING SECTORS INTERNATIONAL PARTNERSHIP AND ALGERIAN GAS MARKETING.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Workshop on “Requirements of financial institutions on the financing of gas infrastructure projects, Brussels, Regulatory requirements for new.
Integration of Physical and Financial risk in Australia’s National Electricity Market Les Hosking Managing Director and CEO NEMMCO.
International Procurement Agency BV USE OF PROCUREMENT AGENTS IN PUBLIC PROCUREMENT ADB REGIONAL SEMINAR SEPTEMBER 5 - 7, 2012 Presented.
Prepared by Barış EKDİ 1 Competition Law & Policy in Natural Gas Market Cengiz SOYSAL Coordinator of Dept. No. I
Overcoming Capacity Constraints & Inflation Property Development & Investment 2008 October 8 th 2008 Presented by : Shehab Elorabi, Senior Development.
Number of players The number of players at wholesale level is very limited (more then 97% of sources /production + import/ in one /incumbent/ hand) New.
ECO 436 Natural Gas. ECO 436 David Loomis Pipeline regulation 25 pipelines account for 90% of volume (1987) Most LDCs served by 3 or fewer.
1 Cross-border Investment TRIGGERS GRI NW Investment I1- Virtual Test – Stockholm September 24, 2009 By : Johan Allonsius.
The Role of regulators in Energy security Sergey G.Novikov Head of Federal Tariff Service of Russian Federation Istanbul
Supply Chain Management
Managerial Economics and Organizational Architecture, 5e Chapter 19: Vertical Integration and Outsourcing McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill.
Security of Supply Brian Withington, Managing Director, TPA Solutions GTE Conference, 22 October 2003.
Organization of the electricity market and renewable energy sources in the Republic of Croatia" Dubrovnik, 2 nd October th Dubrovnik Conference.
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
1 Money and Banking Introduction. Week 1 Learning Goals By the end of the week, you should … Be familiar with the different types of financial instruments.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
Security of Supply Brian Withington, Managing Director, TPA Solutions GTE Conference, 22 October 2003.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
Directorate General for Energy and Transport Nina Grall Directorate General – Energy and Transport European Forum Gas 2007 – Paris Towards one.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Designing Utility Regulation to Promote Investment in Cost-Effective Energy Efficiency Dale S. Bryk Natural Resources Defense Council Pennsylvania.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Information and communicationDirectorate-General for Energy and Transport European Commission Security of Electricity Supply in the EU Stefan Gewaltig.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
1 APEC SEMINAR ON THE EARTHQUAKE DISASTER MANAGEMENT OF ENERGY SUPPLY SYSTEMS A PROPOSED CO-OPERATION MECHANISM by Tan Pham September 2003 Chief Executive.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Long-term modeling of resilience and flexibility of European gas transportation system: integrated factors Dresden, April 3, 2009 Vitaly Protasov, Expert,
1 The Spanish Gas Industry and the 3 rd Package Antoni Peris Mingot – Sedigas President GIE Annual Conference – Madrid.
Role of Storage Facilities GTE 2nd Annual Conference, 23./ – Copenhagen © VNG 2004 Barbknecht Speaker: Klaus-Dieter Barbknecht Director Gas Transport.
Target Cost –Price Determined by Market Target Selling Price- Cost Plus Pricing Time and Material Pricing Transfer Pricing *Negotiated *Cost-based.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
To Buy or To Build Is it really one or the other? APPA New Generation Workshop Portland, Oregon August 1, 2007.
23 rd World Gas Conference 2006 Amsterdam, 6 June 2006 The impact of regulation and unbundling on gas transmission within Europe Wout C. de Groot, Gasunie.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
Slide 1 OMV Transmission and Storage, Reinhard Mitschek, 22. Oktober 2003 Move & More. Experience with Liberalisation GTE Autumn Conference October 23.
Lecture 3 Foreign Exchange Markets and Exchange Rates.
“The Russian gas industry: peculiarities of legal regulation” Anastasia Polyakova, HSE Kaliningrad, 25 th of October, 2013.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
WORKING CAPITAL MANAGMENT. 2 Working Capital Working Capital – All the items in the short term part of the balance sheet, e.g. cash, short term debt,
Fuel Cost Components in the Fuel Adder
10 year investment plan ERGEG approach and contribution
Purchasing supplies at CERN
Commercial Bank Operations
Background and Process
International Conference
The LNG role to improve SoS in Europe
Partnership for the Enforcement of European Rights PEER Regulatory Roundtable on Bundled Products Session 3: Bundled Products Complaints CEER - Brussels.
The work of European energy regulators on generation adequacy
Inter company relations and purchasing policy
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Energy Supply Business Model enabled by the Clean Energy Package
Presentation transcript:

Long-term Security of Gas Supply in a Liberalized Market Jean-Paul PINON Director Gas Market, CREG Co-chairman of the Gas Working Group, CEER UNEC Round Table – Genève 20/01/2004

20/01/04 Security of supply (SoS) framework

20/01/04 Risk Management Tools Most countries manage their SoS combining : Network sizing based on long term planning Storage Diversification of supplies Interruptible contracts and virtual storage Booking of additional transportation capacities. Fewer countries (can) rely presently on: Utilisation of LNG terminals Excess of production capacity Purchase on the Spot Market Buy back mechanisms of firm capacity

20/01/04 Non firm supply contracts : market survey in Belgium in 2001 Supply contracts in 2000 (% of industrial customers) : 52% non firm 21% firm 27% firm and non firm For non firm supply contracts : 76% the supplier has the right to interrupt 24% the customer has the right to interrupt Why do customers choose a non firm supply contract : 62% ‘bi-fuel’ equipment this investment is in 56% of the cases not only made for hedging against the interruption risk but also for arbitrage

20/01/04 Non firm supply contracts : market survey in Belgium in 2001 Modal frequency of interruptions: once per year Notice (modal period) : 1/3 rd 1 hour 1/3 rd 1 day 1/3 rd 1 week Price reduction compared to firm supply : the price reduction required by the ‘modal’ customer is lower than 25%.

20/01/04

Supply contractual flows  physical flows areas supplied from one source Minimizing transport costs by swapping

20/01/04 YEAR 2000 source : GTE, July 03

20/01/04 YEAR 2005 source : GTE, July 03

20/01/04 YEAR 2010 source : GTE, July 03

20/01/04 Fixing security of supply ( SoS) levels in an open market Collective level of SoS = sum of individual levels of SoS + corrective PSO (e.g. PSOs for PLR services) Individual level of SoS = PSO (e.g. 1 in 20) Individual level of SoS = negotiated householdslarge consumers

20/01/04 Top-up In a liberalized market there is a real risk that suppliers take a chance on weather conditions and do not book enough storage. “Top-up” refers to public service obligations guaranteeing that enough physical storage capacity and/or gas in storage will be available.

20/01/04 Top-up Complex system : monitoring both the available infrastructure and the inventory levels throughout the year calculation of the amount of top-up storage: taking into account the benefits of virtual storage, the legitimate trade-off between additional transport capacity and storage, etc who is in charge of top-up storage: centralizing the responsibility in one supplier of last resort (TSO, storage operator or a specific body?) or imposing a level of storage to every supplier or combining both methods ; targeting the costs: the costs incurred by the centralized body should be covered by a legal fund, preferably fed by those who are responsible for a lack of storage.

20/01/04 Belgian case market demand for infrastructure services supply portfolio network simulations pre-feasibility studies draft indicative plan for gas supply in Belgium, with an investment program for the next 10 years consultation of interested parties proposal by the CREG approval by the Minister

20/01/04 Financing new infrastructure World Energy Investment Outlook 2003, published by IEA: to be taken with caveats! distinguish regulated business (network activity) from competitive activities (production) in regulated business: fundamental difference between cost-plus tariffs and price-cap regulation in production: no need for industry-specific incentives for investment, besides the acceptance of long term take-or-pay contracts