Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.

Slides:



Advertisements
Similar presentations
FNAL Superconducting RF Program Sergei Nagaitsev.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
US Cavities Status and Plan Mark Champion 01 October 2009.
ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Perspective on ILC SC Technology Collaboration Fermilab-China Bob Kephart ILC Program Director Fermilab.
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
SRF Industrialization American Region Laboratory Plans Bob Kephart IPAC10/GDE industrialization Kyoto, May, 2010.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
ILC Cavity and Cryomodule Overview Shekhar Mishra Fermilab.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
SRF Plans at ANL & FNAL Bob Kephart ILC Program Director, Fermilab ANL-FNAL-U of C Collaboration Meeting Oct 12, 2009.
July 25, 2007 Fermilab ILC School Americas Slide 1 ILC Test Facilities Sergei Nagaitsev Fermilab.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
F February 27, 2006 Fermilab Budget Briefing 1 Fermilab Budget Overview International Linear Collider FY05 - FY08 Bob Kephart February 27, 2006.
ILC/SRF R&D Robert Kephart. 9/25/2007 R.D. Kephart DOE Annual Review 2 Outline Fermilab ILC Goals Fermilab’s role in the GDE & the ILC machine design.
High Q R&D at JLab G. Ciovati, P. Dhakal, R. Geng, P. Kneisel, G. Myneni TTC Topical Meeting on CW SRF Cornell Univ., June 12 th -14 th, 2013.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
SCRF Lab and IHEP Jianping Dai On behalf of the SCRF facilities team First Mini-Workshop on IHEP 1.3GHz Superconducting RF project, June 10-11,
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Status of U.S. Cavity & Cryomodule Industrialization Bob Kephart LCWS10/GDE Beijing, March, 2010.
Update on S0, S1 for ILC R&D H. Padamsee, Cornell For the S0/S1 Task Force.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
F ILC/SRF Strategic Planning OHAP Rich Stanek September 17, 2009.
ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Status and plans for the 3.9 GHz section of XFEL
ILC R&D Board Meeting: SRF Cavities Status and Plans
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
Progress and Issues with VTS Upgrade
ILC Cavity & Cryomodule Overview
R&D Activity for Field Emission and Vertical EP
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Recent SCRF Activities in IHEP
Highlights from EU Global Design Effort
IHEP Cryomodule Status
Nick Walker (DESY) EU GDE Meeting Oxford
Presentation transcript:

Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal

Americas US SRF Infrastructure Strength Cavity Processing and Vertical Testing R&D Facility –Jlab (30 FY07, 40 FY08, 50 FY09) cycles/yr –ANL/FNAL ( 50 FY08, 60 FY09) cycles/yr –Cornell (12) cycles/yr 70 cycles/yr (07) Horizontal Test Stand –FNAL 24 cavities/yr Cavity Dressing and Cryomodule Assembly –FNAL 12/yr (FY07) Limited cavity fabrication capability in US industry

Americas US SRF Infrastructure Direction Automated Cavity Tuning –100+ Cavity/yr (FY09) Processing and Vertical Testing (Pre-Production Next Generation Facility, with redundancy) –100+ Cavity/yr (FY10) Horizontal Test Stand –Additional 48 Test/yr (Maximum Capacity needed) Cryomodule and RF Unit Assembly and Test without and with beam Increased cavity fabrication capability in US industry –Electron Beam Welder (FY09)

Americas Target 2 ~ 50 M$ for 08, Cavities & Cryomodules, for S0, S1 and Regional Interest 2423 Basic R&D to improve performance, incl ACD activities 43 Cavity, CM and RF Unit Infrastructure1820 Grand Total46

Americas Cavity/CM schedule, Tgt 2

Americas Target 2: Summary of FY08-09

Americas MSU Work Package Recommended Program –Cavity Autopsy –Single Cell Cavity (R&D) –Advanced Cavity and Material Science studies (R&D) SRF Infrastructure –Upgrade ultra-pure water and high pressure rinse –Nine-cell structure vertical test dewar Budget –UPW and HPR: $80k (08), $60k (09) –Vertical dewar: $150k (08), $60k (09) –Cavity Autopsy: $250k/year –Test single-cell cavities: $50k/year –Advanced Cavity and Material Science studies: $135k/year FY08: $635k and FY09: $555k

Americas LANL Work Package Recommended R&D Program –Cavity Autopsy SRF Infrastructure (Partly Funded in FY07) –Re establish cavity testing at LANL –1.3 GHz Power Amplifier –Thermometry provided by Fermilab Budget –2.5 FTE FY08,09 : $208k and $214k –M&S FY08,09: $495k and $689k –Indirect Cost FY08,09: $288k and $297k FY08: $991k and FY09: $1,200k

Americas Cornell Work Package Goal : S0.2 Contributions, Determine if a new cavity is qualified to reach high gradients Plan: Vertical EP, HPR, test new 9-cell cavities Background –Proven successful for single cells –EP under development for 9-cells –Scope of Work : Process and test one cavity per month: (Production cavity activities) –Heat treatment and tuning to be carried out elsewhere (need to include cost of those treatments and shipping in overall budget). Budget: –2 FTE K (liquid helium, acids…) –RF power source 300 – 400 Watt (60 K$) (if not funded in 07) –Smaller diameter vertical test dewar (60 K$) (if not funded in 07) –Present dewar was used for very large 200MHz cavities –Reduce liquid helium usage per test M&S cost = 220 K each in 08, 09

Americas Cornell Work Package (R&D) Explore basic parameters for HPP with 9-cell ILC Cavity – Qe, Pulse Length, Power Level Complete vertical test stand insert for HPP of 9-cell cavities (0.5 FTE) –Test stand design started in 06, continue in 07 Available –About 2 MW, 1.3 GHz source, 250 us pulse length –Waveguide to coax switch and waveguide run to test pit –Input coupler/cold window Scope: EP, HPR and Vertical tests 9-cell cavities with HPP including vacuum accidents and recovery. 6 tests per year (1 FTE + 50 K M&S)

Americas Cornell Work Package (ACD) Design 9-cell cavity with HOM couplers to achieve adequate damping (0.5 FTE) –Chose best aperture 60 – 70 mm Order two 9-cell re-entrant cavities with HOM couplers (250 K) –One with fine-grain, one with large-grain Nb? Process and test two 9-cell re-entrant cavities (0.5 FTE) –Fine grain with EP, large-grain with BCP –6 tests per year

Americas Jlab Work Package Processing and Vertical Testing of 9 Cell Cavity –30 cy/yr in FY07 (Estimate Based on Previous Slides, additional M&S resources may be needed in 08 and 09) –Process 40 cy/yr in FY08, 32 k per (1.23 M) –50 cy/yr in FY09 (1.6 M) –$200k per year as an estimate for additional resources contingency –$365k per year Cryogenic cost Single Cell R&D to improve the Processing (0.25M each year) Field Emission studies for tracking the contamination (0.1M each year) ACD: LL Shape Cavities, Large Grain and Single Crystal (0.5 each year) FY08: $2.65M and FY09: $2.62M

Americas ANL Work Package 08 Electropolish S0.2 ILC cavities FTE, $225 K M&S for full-time operation and throughput of 1 procedure/week Install new HPR system, $200k High-pressure rinse S0.2 ILC cavities –1.0 FTE, $60K M&S Installation of a PLC-based control system for EP FTE, $75 K Optimize existing EP hardware/Interface with U.S. EP vendors/develop and optimize hardware suitable for large-scale EP (1 FTE)

Americas ANL Work Package 09 Electropolish S0.2 ILC cavities – 2.0 FTE, $337 K M&S for full-time operation and throughput of 1.5 procedures/week High-pressure rinse S0.2 ILC cavities – 1.0 FTE, $60 K M&S Optimize existing EP hardware/Interface with U.S. EP vendors/develop and optimize hardware suitable for large-scale EP (1 FTE) FY08: $1.4M and FY09: $1.5M

Americas Order 60 cavities Heat treat, tune, HPR and Vertical test: 50 cycles/ EP at Argonne Horizontal test 16 “good” cavities Work with LANL and MSU to supply thermometry diagnostics for failed cavities Single cell R&D Materials R&D collaboration Continue Testing First cryomodule (type III) assembled in 07 from DESY supplied cavities Assemble cryomodule #2 (Type III) Test cryomodule #2 Target 2: Fermilab Work Package 08

Americas Target 2: Fermilab Work Package 08 Assemble cryomodule #3 (Type IV) Order parts for 4 Cryomodule Gen IV – For S2 RF units, & industrialization start Continue Next Generation CM design, manufacturability, transportability, cost reduction Involve industry in activities Test and treatment facility operations Refrigeration (and misc) for Operation, S0, S1 Install one additional HTS (48 tests/yr) Begin to develop a new CM test stand (RF is in X.8) RF unit infrastructure (NML)

Americas Order 60 cavities Heat treat, tune, HPR and Vertical test cycles/ EP at Argonne & FNAL Horizontal test 24 “good” cavities Assemble 4 cryomodules (Type IV) Test 4 CM Order parts for 4 CM (Type IV) – CM industrialization Continue Next Generation CM design, manufacturability, transportability, cost reduction Test facility operations Involve industry in activities Single cell R&D Materials R&D collaboration Target 2: Fermilab Work Package 09

Americas Target 2: Fermilab Work Package 09 Install Next Generation and Pre-Production cavity processing (scanning, EP, BCP, tuning, heating) and preparation (HPR, clean room, baking) infrastructure to handle 100 cycles per year Install one beam welder for cavity industry, increase number of cavity vendors Finish installation of cryomodule test stand Operate RF unit infrastructure with 1 RF unit

Americas Target 1 ~ 25 M$ for 08, Cavities & Cryomodules, for S0, S1 and Regional Interest 1416 Basic R&D to improve performance, incl ACD activities 43 Cavity, CM and RF Unit Infrastructure87 Grand Total26 Strategy: –Reduce cavities and CM from Regional Interest, maintain S0/S1 support –Some infrastructure buildup in 08, other deferred to 09

Americas Cavity/CM schedule, Tgt 1

Americas Target 1: Summary of FY08-09

Americas Order 30 cavities Heat treat, tune, HPR and Vertical test: 50 cycles/ EP at Argonne Horizontal test 8 “good” cavities Work with LANL and MSU to supply thermometry diagnostics for failed cavities Single cell R&D Materials R&D collaboration Continue Testing First cryomodule (type III) assembled in 07 from DESY supplied cavities Assemble cryomodule #2 (Type III) Target 1: Fermilab Work Package 08

Americas Target 1: Fermilab Work Package 08 Order parts for 1 Cryomodule Gen IV – For S2 RF unit Continue Next Generation CM design, manufacturability, transportability, cost reduction Involve industry in activities Test and treatment facility operations Refrigeration (and misc) for Operation, S0, S1 Complete RF unit test infrastructure at NML (without beam)

Americas Order 30 cavities Heat treat, tune, HPR and Vertical test 50 cycles/ EP at Argonne & FNAL Horizontal test 16 “good” cavities Assemble 2 cryomodules (Type IV) Complete RF unit infrastructure at NML (add beam capability) Order parts for 2 CM (Type IV) Continue Next Generation CM design, manufacturability, transportability, cost reduction Test facility operations Involve industry in activities Single cell R&D Materials R&D collaboration Start construction of new cryomodule test facility Target 1: Fermilab Work Package 09