NCP-CERN Project status Waqar Ahmed. Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement.

Slides:



Advertisements
Similar presentations
East Carolina University Compressed Gas Safety Training Program
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Safe Use and Operation of Vacuum Lines
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
4-1 Chapter 4 Overview b The DCM is very complex Mechanical, electrical, hydraulic and safety systems all work together Mechanical, electrical, hydraulic.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
Since the site reality prevails over standardization, it becomes mandatory to adapt the products to every environment. Thanks to close partnership with.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Progress and Plan for Superconducting RF Cavity RF Group.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
OZONE DRINKING WATER SYSTEM. CONTENTS Properties of Ozone Production of Ozone Water Treatment Plant – 25 m 3 /hr Ozone Generation System.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
GEM progress from Chinese collaboration Yuxiang Zhao University of Science and Technology of China Aug 20,
NCSX Helium Bakeout System M. Kalish 3/25/02
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
Principles of correct VRV Installation A. Refrigerant pipe work
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
GEM Industrialisation Plans with Korea CMS Minkyoo Choi, Inkyu Park, Minsang Ryu Univ. of Seoul Hyunsoo Kim Chonbuk National Univ.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Prep for Gain Tests: Some Progress, Some Setbacks TKH for the Stony Brook Crew.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
RPCs for CMS – Phase I Status report L. M. Pant BARC-NPD L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Lab Safety: Physical and Chemical Hazard Y.Khosravi
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
X-Ray Box Imran Awan Experimental High Energy Physics November 12, 2015.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Installation of the T600 at Fermilab CSN2, September 22,
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Testing Requirements in the Boiler House Requirements for regular testing will vary according to national regulations, and the type of equipment installed.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
Planning for Proto-DUNE PD Installation and Cabling at CERN
(On Behalf of CMS Muon Group)
IT-4189 Supply and installation of a cryogenic distribution system
Dept. of Physics and Space Sciences, Florida Institute of Technology
Quality Control Chamber Production
Module Loading Task Force Meeting October 21, 2004
1.3-GHz Cavity Vacuum Furnace at IB4
Status of the CO2 Cooling Project
Quality Control in Straw Production
Emergency Electrical Power Supply for Buildings
SHANGHAI ROTORCOMP COMPRESSOR ONLY USE.
INSTITUTE OF HIGH ENERGY PHYSICS
(On Behalf of CMS Muon Group)
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
The Improvement of ALARA for the Steam Generator Maintenance
Presentation transcript:

NCP-CERN Project status Waqar Ahmed

Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement station X-ray box

Clean Room The clean Room must certified cleanroom, rated at least at class 1000, equipped with one large bench to assemble full GE1/1 chambers for both long and shot versions. The Clean Room must be large enough To allow personnel to easily move around the assembly bench. To accommodate auxiliary benches for assembly tools and spares are also required. To accommodate storage cabinets were keep the tools necessary for the assembly. The cleanroom must be equipped with clean and dry nitrogen gas lines used to blow chamber parts during assembly. Clean Room class 1000 and particular area class 100.

Gas system In this area the assembled chamber will be tested for gas Leaks. The station must be equipped with a dry and clean nitrogen gas line and with a manometer to measure a pressure drop of the order of a few tens of a millibar per hour. The use of oil or any oil-based devices to produce over pressure (U- shape tube) is forbidden.

Single chamber Gas System CO2Argon Mixer On/Off Valve Flow meters S R S R Exhaust MFC SSupply RReturn Flow meterV-100 Range( Bar) Pipe SS ID4mm OD6mm Use separate Valve of Dry Nitrogen flush system FESTO Range 0 – 10 Bar

Assemble Chamber Gas leak test In this area the assembled chamber will be tested for gas leaks. The station must be equipped with a dry and clean nitrogen gas line and with a manometer to measure a pressure drop of the order of a few tens of a millibar per hour.

Large Current Measure system There must be a nitrogen-flushed box of large enough size to comfortably house GE1/1 foils, both short and long version. A power supply must be available to provide at least 500 V at sufficient current for a single GEM foil. The nitrogen gas used for flushing in the leakage current box must be dry and clean. Should be place in to the cool room in order to reduce the foils to “dirty” environment.

Foil testing Box

X-Ray Box It is used to measure the gain uniformity of the assembled chambers To ensure homogeneity among different assembly sites, X-ray box must be equipped with mini-X source from Amptek. Each site must take care of the safety operation of the x-ray box according to the local radiation protection prescriptions.(follow Imran Presentation) The box must be large enough to accommodate both long and short chambers. The box must have gas line for chamber operation and DAQ system based on APV-SRS.

X-Ray Box

ASK for CERN Peoples…. In particular CERN asked Cleanroom dimensions The dimensions of the optical bench (or similar) to be used for the assembly. X-ray box for the gain uniformity test dimensions and readiness status. The number of people that will be involved during the assembly period The general infrastructures status (gas lines, electronics, etc…)

Q & A Thanks