PAM Module PAM-Integration Amongst Systems COA NTES Train Running Data PAM COA Exceptional Information PRS Exceptions: Rescheduling Cancellation Origin.

Slides:



Advertisements
Similar presentations
Network II.5 simulator ..
Advertisements

International Alert Users Association Conference November 10-12, 2011 Jeffrey Knoepke Preventive Maintenance System.
Module 3: Business Information Systems
The Modules Freight forwarding & Transportation Freight forwarding & Transportation Finance & Fixed assets Finance & Fixed assets Warehouse Warehouse.
DENVER INTERNATIONAL AIRPORT FUEL IMPORT INTERFACE
Kaba Time Collection System- Supervisor Training.
 Thomas Bray Senior Editor, Transportation Management J. J. Keller & Associates, Inc.  Elise Chianelli Product Manager Safety & Compliance PeopleNet.
CSCI 465 D ata Communications and Networks Lecture 20 Martin van Bommel CSCI 465 Data Communications & Networks 1.
Steve Schwabe Woolpert Project Manager
GIS Initiative in Indian Railways
For MIP Fund Accounting Software
Mailer Rating National Deployment Mailer Rating Review.
IT applications in passenger business B.V.L.NarayanaSPTM/RSCBRC.
Enlighten V2.2 Manual – Admin Level Access Healthcare Training Section 1 Jayex Technology Limited Enlighten - Admin V2.2 Aug 2010 v1.0.
Click a NOTUS Suite- product for a short description NOTUS REGIONAL NOTUS Regional helps regions perform the tasks related to the reimbursement of providers.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
WebDFS Budget Amendment and Personnel Processing.
SOFTWARE PRESENTATION ODMS (OPEN SOURCE DOCUMENT MANAGEMENT SYSTEM)
LACES Cohorts. Cohort #1: Enter Employment The most important thing to remember regarding employment cohorts for 12/13 is that most of the employment.
William Stallings Data and Computer Communications 7 th Edition (Selected slides used for lectures at Bina Nusantara University) Internetworking.
Software Testing and Quality Assurance
22 Building Simulation Models using ProModel. 23 Please Read Practice Model Shop Floor found on the next page.
Alarms and Events Processing Group No. 2 Project Guide: Prof. N.D.R.Sarma.
Hands-On Microsoft Windows Server 2003 Networking Chapter 7 Windows Internet Naming Service.
MIS and interpreting data. What is MIS?- A management information system (MIS) provides information that is needed to manage an organization efficiently.
Alarms and Events - Processing and Logging Project Mentors Suneel Kumar Venugopal Vanga.
Backup and Recovery Part 1.
Check Disk. Disk Defragmenter Using Disk Defragmenter Effectively Run Disk Defragmenter when the computer will receive the least usage. Educate users.
Structure Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 STRUCTURE COMMANDER Introduction Product Overview.
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. Automatically control.
EPayment ePayment Introduction It is the process of electronic transfer of bill data between booking and payment office Department of Post collects.
Students: Nadia Goshmir, Yulia Koretsky Supervisor: Shai Rozenrauch Industrial Project Advanced Tool for Automatic Testing Final Presentation.
Enhancing ERP System with RFID: Logistic Process Integration and Exception Handling Dickson K. W. CHIU Senior Member, IEEE Eleanna Kafeza Athens University.
Integrated Shipping Services EU 24 Hour Transmission.
Traffic Management System And Passenger Information System Western Railway Experience.
Manage Engine: Q Engine. What is it?  Tool developed by Manage Engine that allows one to test web applications using a variety of different tests to.
9/10/20151 Hyperion Enterprise 6.5 New Features & Functionality Robert Cybulski, CPA Finit Solutions.
Presentation on Facilities / Assets Management by Satyam Computers Services Ltd.
Introduction to MIS.
Chapter 9 Scripting RMAN. Background Authors felt that scripting was a topic not covered well Authors wanted to cover both Unix/Linux and Windows environments.
IT Applications in Freight business B.V.L.Narayana RSC/BRC.
TRAIN MANAGEMENT SYSTEM ON MUMBAI SUBURBAN SECTION OF CENTRAL RAILWAY
SD&D Project Repository (TSPR) OI PM staff meeting 6/19-22/01.
Station Board EVLA F2F Meeting: December Dave FortEVLA F2F Meeting: 11/12 December Outline Station Board Review Station Board Status Delay.
BES-MSP Interface ( BMI ) MPUG Presentation- December 3, 2003 MS Office Project/Project Server -- Case Study Follow-up: Integration between MSP and BPA’s.
© SAP AG Production Planning and Execution (PP) SAP University Alliances Version 2.1 Authors Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP4 Global.
Siebel 8.0 Module 5: EIM Processing Integrating Siebel Applications.
Statewide Financial System Program 1 Commitment Control (KK): Refresher Training Key Points Commitment Control (KK): Refresher Training Key Points Welcome.
Week 7 : Chapter 7 Agenda SQL 710 Maintenance Plan:
Intranet Portal. Intranet Portal to manage all internal activities of a company.
Common Deficiencies in Voucher Level Computerisation.
Barbara Ward November 13, 2008 ACACSO Orlando, Florida Improving the LCS Process LCS UPDATE.
Business Continuity Planning for OPEN OPEN Development Conference September 18, 2008 Ravi Rajaram IT Development Manager.
Smart Card based Location Tracking System By Saltriver Infosystems.
©Spectra Technovision (India) Pvt. Ltd.
AAL CDM Message Sending Process CDM A&D Meeting January 24-25, 2001 Presented by: Roger Beatty - Operations Coordinator American Airlines - System Operations.
Mobile App ID Cards. Plastic ID cards All players in the EODSA require a plastic ID card generated by the EODSA Since April 2015 these have been generated.
 Indian Railways is a Department of the Government of India, under the Ministry of Railways, and is tasked with operating the rail network in India.
 Software reliability is the probability that software will work properly in a specified environment and for a given amount of time. Using the following.
oracle apps order management training
OPS Requirements Specification and Analysis Dustin Larson Bryan Campbell Charles Sears.
Architecture Review 10/11/2004
Chapter 6 Delivery & Forwarding of IP Packets
Archiving and Document Transfer Utilities
Maintenance module Martin Heigl CTO
Chapter 6 Delivery & Forwarding of IP Packets
Impact/Handling in Coaching Operations and Implementation.
Enhancement Notification Release 5.4
AGILENT TECHNOLOGIES RESTRICTED
C/S Windows Overview Nigel Pilsbury.
Presentation transcript:

PAM Module

PAM-Integration Amongst Systems COA NTES Train Running Data PAM COA Exceptional Information PRS Exceptions: Rescheduling Cancellation Origin Change Diversion Destination Change Dynamic Caution Orders Train Running Data TMS

Current Approach of Integration COA User COA Divisional Server COA User COA Divisional Server COA Central Server Central Server checks the data based on flag if it is required for PAM, then invokes web services ICMS Web Server ICMS App Server Oracle Database Running J2EE based PAM applications Pam Application Execute Web service for integration. 1.PAM calculate train start date based on train schedule date send by COA. 2.Then PAM calculate delay based on actual date and time send by COA 3.PAM checks authorization of the division 4.Punctuality calculations and population of various tables. INTREGATION BETWEEN ICMS-COA

PAM- Interchange Interchange reporting is made by division level user. Capturing of actual train running timings at source, destination and interchange stations. Back up option used when timings are not updated from COA. As soon as actual timings are received at interchange station or destination, punctuality is calculated automatically at Division and Zone level. Board level punctuality calculated after arrival reporting at destination.

PAM- Detention Detention reporting is made by division level user. New User Interface to capture train running delay reasons. There are 34 standard causes along with sub causes. One of the cause has to be defined as primary cause at division level, that is treated as responsible cause at division level. Responsibility fixing at zone and board level taken care by the system automatically and later on that can be changed manually.

PAM- Exceptions New User Interface to capture exceptions. Captured exceptions are transferred to COA and NTES. Already marked exception can be removed by super user. Cancellation, Rescheduling and Origin change can be marked before actual departure reporting. Diversion can be marked before actual diversion takes place from diversion starting point. Short termination can be marked before actual arrival at regular destination. System allows and handles marking of Multiple diversions.

PAM- Asset Failures and Unusual New User Interface to capture Asset Failures and Unusual. Logging allowed for passenger carrying and goods trains. Editing allowed up to next 7 days. Any logged entry can be removed by super user within 7 days. MIS reports are available at Board, Zone and Division level.

PAM- Caution Order PAM receives Caution Orders marked in COA through integration. MIS reports to display imposed cautions are available at Zone, Division and station level. Station level MIS report reflect imposed caution in the order of given route. Caution Order can be system generated and issued to driver & guard of trains from Notice station using this utility.

Train Running Comparative Graph

Train Running Delay Graph

Detention Reporting Interface

COIS Module

COIS-Integration Amongst Systems COA FOIS Unplanned Enroute At/Dt Loco Information COIS COA PMS FOIS PRS Loco Status Change Actual Train Consist Parcel Coaches Info Loco Info at Source Light Engine Schedule Loco Status Change CMM Sick/Shop/Fit Status CMM Coach Status Work Order Generation

COIS- Send Consist to PRS Facility available to send the actual train consist to PRS, before actual train departure. Send consist to PRS, at least 4 hours before from scheduled departure is recommended. MIS report is available to reflect the reporting figure.

COIS- Loco Integration with COA Information of Loco attached at train source station in ICMS is passed to COA, before actual departure reporting done in COA. Any unplanned en-route Loco attach/detach information in COA is passed to ICMS. Light engine information along with scheduled path is passed to COA. Light engine movement on scheduled path is passed from COA to ICMS. Relevant MIS reports are available at all levels in ‘Loco Reports’ group.

COIS – Yard Display