Project Management Lecture 2/9/2015. Fundamental “Rules” of Project Engineering 1.While there is never enough time to do it right, there is always enough.

Slides:



Advertisements
Similar presentations
TK3333 Software Management Topic 7: Schedule Control.
Advertisements

Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Chapter 3 Project Initiation
Project Cost Management Estimation Budget Cost Control
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Teaching Project Management Mauricio Gonzalez (M.Sc) Frederick Douglass Academy, NYC Roy B. Melton, Purdue University 2010.
Projmgmt-1/17 DePaul University Project Management I - Work Breakdown Structure Instructor: David A. Lash.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Chapter 5: Project Scope Management
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Systems Development (SD) Presentation Michael Webb IT Director for Medicaid Utah Department of Health UDOH Informatics Brownbag August.
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Planning. SDLC Planning Analysis Design Implementation.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Project Management and Scheduling
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
C ALL C ENTER O PTIMIZATION P ROJECT J.P. Cap + Vitality, Inc. | J.P. Cap |
Instructions & Notes This template was created to help you: – Show the team where you are going via slides representing each planned activity. – Keep your.
Goal and Scope Where are we going and what path will we be taking?
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
BTS730 Communications Management Chapter 10, Information Technology Management, 5ed.
Technological Design STS-118 Lunar Plant Growth Chamber Challenge © 2013 International Technology and Engineering Educators Association STEM  Center for.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Work breakdown structure
1 The Initial Report Preparation Guidelines. 2 The Initial Report u Definition of project scope u Project aims and objectives u Initial project plan.
Software Engineering Management Lecture 1 The Software Process.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
Project scope and activities INFO 638Lecture #21.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
CSC480 Software Engineering Lecture 5 September 9, 2002.
PROGRAMMING Frank Ellis B.Sc. ARSM Thursday 26th March 2015
Timeline and Milestones. The first step to any plan is thinking about a timeline. You want to know what needs to get done and when, to ensure that you.
UTA/ARRI. Enterprise Engineering for The Agile Enterprise Don Liles The University of Texas at Arlington.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Software Development Life Cycle (SDLC) -Planning- Lecture1.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
ECE2799 Project Management Prof. Mazumder Prof. Bitar Updated 3/18/2016.
Event Project Management By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Fundamentals of Project Management and Schedule Development.
Informed Traveler Program and Applications Agile / Scrum Overview Jerry Inberg.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Chemical Engineering Design Overview of Chemical Engineering Design © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott.
Project Planning Ing. Athanasios Podaras, Ph.D Faculty of Economics Department of Informatics Technical University of Liberec.
Industrial Process Design
Principal Investigator ESTCP Selection Meeting
Chapter 11 Project Management.
Software Engineering Management
Systems Analysis and Design in a Changing World, 4th Edition
Software Project Management
Principal Investigator ESTCP Selection Meeting
ECE2799 Project Management
Terry Ring Chemical Engineering University of Utah
Software Project Management
Project Management Process Groups
Project management Learning Unit 5.
Project Management Chapter 11.
Planning for AIChE Contest Problem
Presentation transcript:

Project Management Lecture 2/9/2015

Fundamental “Rules” of Project Engineering 1.While there is never enough time to do it right, there is always enough time to do it again. 2.No surprises. 3.At some point you have to build the plant.

Chemical Engineering Design Why Are ChE’s Paid So Well To Work in So Many Different Industries? They can start from a vaguely defined problem statement such as a customer need or a set of experimental resultsThey can start from a vaguely defined problem statement such as a customer need or a set of experimental results From the problem statement they develop an understanding of the important underlying physical science relevant to the problemFrom the problem statement they develop an understanding of the important underlying physical science relevant to the problem Using this understanding they can develop a plan of action and set of detailed specifications, which if followed will lead to a predicted financial outcomeUsing this understanding they can develop a plan of action and set of detailed specifications, which if followed will lead to a predicted financial outcome All the other ChE classes you took The design course addresses these © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design The Design Process Problem statement Implementation Plan Financial outcome XYZ Co. © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design Design Work Process Determine Customer Needs Set Design Specifications R&D if Needed Evaluate Economics & Select Design Predict Fitness For Service Build Performance Models Generate Design Concepts Procurement & Construction Begin Operation Customer Approval Detailed Design & Equipment Selection Common to all design problems in all industries © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design How do companies implement this design process? © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design The Design Team Project Sponsor Contractors Civil Engineers Business Input R&D Specialists Technical Specialists Cost Engineer Control Engineer Consultants Mechanical Engineer(s) Process Engineer(s) Project Manager © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design Nowadays (For most companies, most sectors) Project Sponsor Contractors Civil Engineers Business Input R&D Specialists Technical Specialists Cost Engineer Control Engineer Consultants Mechanical Engineer(s) Process Engineer(s) Project Manager E&C Company Technology Vendor Operating Company © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design Implications Most major projects involve several companies working togetherMost major projects involve several companies working together “OpCo” might itself be a joint venture between several companies“OpCo” might itself be a joint venture between several companies The companies might all be based in different regions of the worldThe companies might all be based in different regions of the world Teamwork, technology transfer and effective communications have high impact and valueTeamwork, technology transfer and effective communications have high impact and value Good project management is more important than everGood project management is more important than ever © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

“Stage Gated” Project Life Cycle P1 P2P3 P4

Project Estimates, Plans, Schedules Each Engineering Discipline normally submits an estimate of hours needed to complete the project, along with a resource loaded schedule showing “milestone” dates for completion of deliverables, or specific % complete targets relevant to each project phase. These are built around the deliverables and known activities for each engineering discipline.

Typical Process Engineering Deliverables for Stage Gated Project

For Other Types of Projects – See Text Chapt. 1 “Techno-Economic Analysis” (aka Feasibility Study) ….see Table 1.1 for Deliverables-Engineering Report Sections. “Technical Proposal” ….see Table 1.2 for typical parts of a proposal that must be generated. Note: A Basic Engineering Design Report (BEDR) – Table 1.3 puts together all the typical Stage Gated Project Deliverables…at different Phases of each Project.

Chemical Engineering Design The Project Plan Is developed & implemented by the project managerIs developed & implemented by the project manager Sets deadlines for completion of activities & intermediate deliverablesSets deadlines for completion of activities & intermediate deliverables Allows scheduling of subordinate or dependent tasksAllows scheduling of subordinate or dependent tasks Allows estimation of the required manpower resources at each stage of the projectAllows estimation of the required manpower resources at each stage of the project Determines the procurement schedule & gives an estimate of when cash outlays are expectedDetermines the procurement schedule & gives an estimate of when cash outlays are expected © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design Example: 11-Week Plan for a Process Design Project © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design What’s In a Project Plan? List of tasks © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design What’s In a Project Plan? Durations, start and end dates Durations, start and end dates © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design What’s In a Project Plan? Predecessor tasks Predecessor tasks © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design What’s In a Project Plan? Resource allocations Resource allocations © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design What’s In a Project Plan? Gantt chart Gantt chart © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

Chemical Engineering Design Tools for Project Planning Specialized software for larger projectsSpecialized software for larger projects –MS Project –SureTrak –Primavera Project Planner –Enterprise PM –Cobra Small project plans & Gantt charts can be drawn in spreadsheets or using cheap software (<$100)Small project plans & Gantt charts can be drawn in spreadsheets or using cheap software (<$100) –AceProject (free on-line) –TurboProject –Project Vision –Quick Gantt © 2012 G.P. Towler / UOP. For educational use in conjunction with Towler & Sinnott Chemical Engineering Design only. Do not copy

How do you develop a Project Plan? 1.Develop Project Scope, and Design Basis (Rough Draft-Outline Based on what you have been told) 2.Develop Project Man Hour Estimate 3.Develop Project Schedule 4.Resource Load the Schedule based on Man Hour Estimate 5.Iterate with Resource and Schedule Constraints to meet project requirements. 6.Publish Documents (Scope, Estimate, Schedule) for Review & Approval

How do you develop a Project Plan? Start by “Scoping” your project: – “In Scope” means you have deliverables for your project. – “Out of Scope” means no deliverables, or any other considerations, calculations, etc. – Write up a Scope of Study document, listing project intent and deliverables. – Develop and initial Design (or Study) Basis Document, to identify your basis (and things you need to pin down in your project later as TBD).

Project Plan Development, cont. Next - Estimate the man-hours needed for each deliverable. Note that each deliverable may have several separate activities/tasks you need to estimate. – Add in required hours for reviews, meetings, travel, etc. – Include your own safety/risk review.

Project Plan Development, cont. Develop the Schedule. Organize your separate activities/tasks in order by which you can complete them (Identify predecessors). – Start from Deadline and work backwards…or.. – Start with Kick-off date and work forwards. Identify Milestone dates. These can include: – Completion dates (or % Complete dates). – When Deliverables are to be issued for review & comment. – Review Meetings. – Key Decision Points.

Project Plan Development, cont. Document resources available to accomplish required man-hours Iterate? Demonstrate Plan via GANT chart, Flowchart, etc.

Cost Estimates for “Stage Gated” Project Life Cycle P1 P2P3 P4 PFD’s 0% 100% P&ID’s 0% 30 to 50% 100%

Project Cost Estimate Quality P1P2P3P4 Class 5 Estimate Class 4 Estimate Text Book AACE Cost Estimate Classes: Class 3 Estimate Class 2 Estimate

Project Life Cycle

Inherently Safe Design (ISD) P1 P2 P3 P4

Impact of Cost & Schedule + Need for ISD on Process Engineering You must PLAN your work. You must Estimate your work. You must Schedule your work. You must Track your progress on your work. You must report your progress and update your Estimate & Schedule as Needed.

Fundamental “Rules” of Project Engineering (For Process Engineers) 1.While there is never enough time to do it right, there is always enough time to do it again. You have to “Scope, Estimate, and Plan (Schedule, and Resource Load) your project”. 2.No surprises. You need to update your Estimate & Plan 3.At some point you have to build the plant. You need to produce your Deliverables.