ICAO EUR/NAT Office ICARD Forum (Paris, 20-21 September 2010) ICARD 5LNC - 1 ICAO Five-Letter Name-Code database (ICARD) Nikki Goldschmid, ICAO EUR/NAT.

Slides:



Advertisements
Similar presentations
ICARD 5LNC and Operational Data ICAO GIS analysis
Advertisements

Learn How to Register as a New Employer and Post a Job.
School Based Student Reporting v4.0 1 Version 3 to Version 4 Update Training School Based Student Reporting Version 4.0.
SIS – NBS Online Specimen Tracking System Training
Jillian Gregory, REI Systems Department of Health and Human Services
Allied Health Systems Authorizations Website Tutorial and Walk Thru.
UL Workshop April 28th 2011 Diploma Supplement: Practice at UL and completing the Supplement.
Jeanette Frost and Nadeem Zaidi.  Modification to epro requisition to compare account with dollar amount if an equipment account is used on the transaction.
Emergency Evacuation Procedures
16 March 2015 Ministry of Planning and International Cooperation Jordan Response Plan 2015.
International Civil Aviation Organization Foreign Air Operator Surveillance Database (FAOSD) Adisara Czincila Information Technology Assistant, APAC Office.
Self-Determination Staff – Midwest Region:  Michelle R. McCormick-Corbine, Regional Office  Desiree Red Day, Regional Office  Susan Fedorko, Regional.
ATS Route and Waypoint Implementation:
1 Smart Ways To Use Billing Innovations To Better Serve Your Customers Elie J. Boudreaux III, P.E. - Director of Utilities Fort Pierce Utilities Authority.
Arizona Department of Education Exceptional Student Services Vouchers System RTC User.
Welcome to the UNMJobs Department Approver Online Tutorial The University of New Mexico’s online application system. ** To navigate through this tutorial.
Fall 2005 Version 3.0. Private Marks Module Welcome Session Objectives  Understand what Private Marks (PM) are & how to:  Enter a PM Application  Associate.
Welcome to BLT Online NQT Induction. Points We Will Cover: What is BLT Online NQT Service? What are the advantages of using it? User roles on the site.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
ResourcePoint™ Data Entry Workflow. What is the ResourcePoint Module? The ResourcePoint module is a provider database that contains “operational” provider.
Lead Management Tool Partner User Guide March 15, 2013
Part of the Summer 2008 “Get to kNOw” Training Series Laurie Krom.
MEGS+ Michigan Electronic Grants System Plus Application User Manual for Child and Adult Care Food Program Family Day.
Fire Safe Cigarette Online Registration Instructions.
HPHConnect New User Registration Tutorial A Guide for Harvard Pilgrim Providers August 2005.
ICARD USER FORUM Recommendations and Conclusions (Paris, 20. – 21. September 2010)
Maintain and Modify Grants Chapter 8. Maintain and Modify Grants 8-2 Objectives Understand How to Modify an Approved Grant Learn How to Edit Budget Information.
AARP Tax-Aide Volunteer Recruitment System Phase 2 AARP Tax Aide District Coordinators Meeting November 2010.
Amber Johnson U.S. Department of Education WVASFAA Fall 2015 Conference October 29, 2015 FSA ID: The FSA PIN Replacement.
NSLDS on the Web Jim Yoder & Andrea Wise Session 3.
WHEN TITLE IS NOT A QUESTION N O ‘WE CAN’ Deal Registration Entry and Submission August 2010.
Step By Step Guide for Application. 1. Click the “Register” button ① Ⅰ. Registration.
Requirements - background
A Volunteer Supervisor’s Guide to Volunteer Connection a modern, online volunteer management solution.
ICAO EUR/NAT Office GREPECAS CNS/ATM/SG01 (Lima, Peru, March 2010)ICARD Workshop - 1 ICAO Five-Letter Name-Code database (ICARD) Nikki Goldschmid,
Partner Ready Portal: New Partner Registration Process
6-1. 항공안전평가프로그램 항공안전본부 항공기술과 항공사무관 이광희 6-1. 항공안전평가프로그램 항공안전본부 항공기술과 항공사무관 이광희
Global Transaction Bank Deutsche Bank Investor Reporting Demo.
Global Transaction Bank Deutsche Bank Investor Reporting Demo.
1 Care Management PCMH Committee Person Centered Medical Home September 10, 2014.
Production Status Portal -- Confirmation of Concept by David Hill 01 July 2013 Production Status Portal 1.
Overview of the ICAO Universal Safety Oversight Audit Programme Overview of the ICAO Universal Safety Oversight Audit Programme North Asia Regional Aviation.
SSDB Progress Report Site Survey Panel Meeting CIRE, Sapporo, Japan July 22, 2006 John Weatherford San Diego Supercomputer Center Subcontract to IODP-MI.
Helping teachers connect instantly with students and parents.
Prospects Net – Development Plans Mark Watts June 30th 2008 AGCAS Nottingham.
ICAO SAR Regional Framework “AVIATION SAFETY FOR OFF-SHORE OPERATIONS/ SEARCH AND RESCUE” 19 May 2016ICAO EUR/NAT Office1 Mr. Celso FIGUEIREDO Regional.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Dirk Weiler Chairman of the ETSI IPR Special Committee Document No: GSC16-IPR-02 Source: ETSI Contact:
Welcome to BLT Online NQT Induction.
ATS Route and Waypoint Implementation:
Learn How to Register as a New Employer and Post a Job
Frequency Finder 6 Mapping, Export, Special Functions
5LNC - background information
GOLD GOLD Amendment Program Presented to: SOCM/2 Seminar
Requesting Access to POP on Intel’s Supplier Presence Site - External Users Feb 28, 2012.
Materials Engineering Product Data Management (ePDM)
CSM System ( Customer Service Management System)
VRMS USER MANUAL.
USOAP Continuous Monitoring Approach (CMA) Workshop
HB4034 – Duplicate Batch Process
Evolution of WAHIS and its interface WAHID
INfOR Work Request and Work Order Quick Entry Process 12/01/16
Recommendations and Conclusions
Geneva Statisticians Directory
ETSI Centre of testing & interoperability April 2013
FAFSA on the Web Preview Presentation
5LNC - background information
SAM Regional Seminar/Workshop
Status of the ICAO Universal Safety Oversight Audit Programme
ResourcePoint Workflow
Presentation transcript:

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 1 ICAO Five-Letter Name-Code database (ICARD) Nikki Goldschmid, ICAO EUR/NAT

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 2 5LNC - background information  Annex 11, Chapter 2, Appendix 2  Designators for significant points not marked by the site of a radio navigation aid  1960’s – ICAO codes  APAC  EUR/NAT  MID  WACAF  SAM  NACC  ESAF 5 406OCT NOV 1985

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 3 5LNC - codes dispatch

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 4 5LNC – Traditional Registration

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 5 5LNC - Need for dynamic change  ICARD designed to  Meet requirements set in Annex 11, Chapter 2 (2.14) - Appendix 2  Ensure unique designators allocations (ICAO Strategic Objective A)  Enhance 5LNCs management worldwide (ICAO Strategic Objective D)

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 6 A web based system since 1998

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC August 2010 : full transfer from Eurocontrol to ICAO HQ Now available in all ICAO Regions 2010 ICARD global

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 8 ICARD for public users ICARD direct access : ICARD menu for public users

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 9 ICARD access for route planners Route planners need prior registration

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 10

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 11 ICARD- Authorised user menu

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 12 Search for existing code

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 13 Search 5LNC with specific pattern

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 14 Search sound-like 5LNC

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 15 Random search from given coord

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 16 Status of 5LNCs Codes for 5LNCs:  blue codes are available  Underlined 5LNCs are active and available for your region  the authorised user selects and proceeds with the request  If not active (not underlined) = available but belongs to another region  Contact your data manager who will coordinate with the other ICAO Region and check whether transfer is possible  orange codes are pending for approval  red codes are already allocated

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 17 Posting a request

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 18 Sound-like proximity is mandatory  500NM is the radius currently determined as safe for a sounding like proximity  Checking sound like proximity is the responsibility of the route planner  The route plannerwill check the adequacy of the results obtained with the « list » function  The data manager will refuse requests that are not safety checked and confirmed.

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 19 Sound like check with list view

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 20 Proximity check with MAP view

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 21 Reminding Safety issues Warnings are prompted to draw the authorised user’s attention on the necessity to modify the request.

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 22 Check my request  Possible modifications for pending requests

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 23 On-line Downloads

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 24 Next steps to ICARD global  5LNC lists comparison ICARD/AIPs  Clearing duplicates issues »at regional level »at global level Our next challenge : Develop a route designators system

ICAO EUR/NAT Office ICARD Forum (Paris, September 2010) ICARD 5LNC - 25 Merci ! Thank you for your attention ! Nikki Goldschmid 林 琪 妮 ICAO EUR/NAT Paris - ICARD data manager Tel: +33 (0)