A few different things… ID 206 construction + materials II.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
References: Ballast, D. K. (2002). Interior Construction and Detailing for Designers and Architects. Belmont: Professional Publications, Inc Reznikoff,
National CAD Standard In a world where globalization is invading and distinction is becoming the rule, We feel the urge to pass some of the knowledge.
MEPO Training MEPO Database Access Training Presentation Copyright 2011 Rodger B. Fluke, MPA.
Overview - Title Slide An Overview of The United States National CAD Standard.
BIMteriors: Autodesk® Revit® Architecture for Commercial Interior Design John R. Ade, AIA Senior Applications Specialist Applied Software.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Objectives To become familiar with a set of Construction Specifications; 1)Their layout and format. 2)The terms and definitions used and their legal ramifications.
Interior Lifestyles Pvt. Ltd Welcome to our six step process for Interior designing of your commercial space. 6 6.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Commercial Interior Design: Part II Contract documents for commercial interior design practice describe the proposed construction, and any f.f.&e. installation.
Design & Layout of Foodservice Facilities
Construction Contract Documents
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
CDECA ™ 2014 Decorating and Design Competition © CDECA ™ 2013.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
3 interior planning + design conference room
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Construction Specifications
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
Copyright © Texas Education Agency, All rights reserved. 1 Web Technologies Website Development with Dreamweaver.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Construction Specifications Foreman’s Development Series
Inserting Pictures and Symbols in Word documents There are many ways to insert pictures – these are the most common methods Copy and Paste Copy and paste.
Blackboard Learn 9.1 © 2013 Blackboard Inc. All rights reserved.
Web Technologies Website Development Trade & Industrial Education
Commercial Interiors Projects. There are basically three ways to get a project built. 1. The traditional sequence in building a project Traditional.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
XP New Perspectives on Microsoft Office FrontPage 2003 Tutorial 4 1 Microsoft Office FrontPage 2003 Tutorial 4 – Using Shared Borders and Themes.
2 solutionoutcomeprofiledetailssubmittalreferences interior planning + design project programs. plans. charettes Christina M. Scalise executive office.
What is Green Building? How do I decide on materials and systems for my home?
The Basics of Formaldehyde: What You Need to Know.
FINANCIAL BID OPENING. Tender creator logs in 1. Dept user logs in with login id and password 2. Click Login.
Formats ACT 380.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
2014 AIA Jacksonville Design Awards (Test of Time Award) Instructions Slide Upon downloading file from your please save file as submittal number.ppt.
Developing Commercial Design Plan Micah Rooke Georgia CTAE Resource Network 2010.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 9 Slide 1 Unit 9 Specifications and Commercial Construction.
Preliminary Project Descriptions/Outline Specifications
Blackboard Learn 9.1 © 2010 Blackboard Inc. All rights reserved.
Main Idea Interior designers make interior spaces functional, safe and beautiful for almost any type of building. Such as offices, homes, shopping malls,
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Fall 2014 Wednesdays and Friday 8:00 am - 9:50 am VPAC 210 Office: VPAC 215Phone: Office hours: By.
What are they? How can I do them too? Construction + Materials IV: Construction Documents.
Chapter 9 ID 234 Building Codes Fall 2012 Finish and Furniture Selection.
Section drawings know standard construction finish attachment and dimension custom fabrications 1.
Project specifications Division 1- general conditions Division 2- sitework Division 3- concrete Division 4- masonry Division 5- metals Division 6- carpentry.
INTERIOR DESIGN STAR EVENT. MEET YOUR CLIENTS The home is laid out similarly to this ranch home. THE SPACE.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Allowances, Unit Prices, and Alternates ACT
Learning Aim B.  It is a good idea to think carefully about the design of a website before you try to implement it.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
© CDECA ™ 2016 CDECA ™ 2016 Decorating and Design Competition Competition Guidelines, Rules, and Entry Template Competition Instructions - 1.
CATEGORY: (Insert Category Here) Entry Number: (Insert)
1 Chapter 15 Creating a Presentation. Practical Computer Literacy, 2 nd edition Chapter 15 2 What’s inside and on the CD? In this chapter, you will learn.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
CDECA™ 2017 Decorating and Design Competition
Creating a Presentation
Construction Documents
Remove this slide before submitting.
FUE - Future University in Egypt Faculty of Engineering and Technology Department of Architectural Engineering ARC472 - Execution Design (2) Spring 2017.
Commercial Building Project Portfolio
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pre-Contract Cost Control
INTD 405 Modern Practices in Interior Design PLANS
INTD 405 Modern Practices in Interior Design PLANS
DESIGN COMPETITION 2017 New construction.
ART 2640, Building Systems of Interior Environments Fall Semester 2018
FIVE PROJECT PHASES.
Presentation transcript:

a few different things… ID 206 construction + materials II

hand in precedents on February 21 st hand in precedents on February 21 st look for when your material is to be presented look for when your material is to be presented revised schedule – see syllabus online

browsing browsing shopping shopping drawing drawing measuring measuring building buildingapps

Assignment Objective : Study an existing project for the use of materials. Format : Single board, unmounted, 24x36. Content : Assignments should contain at least the following: Project data: name, project type, designer, location, square footage, cost per square foot (if possible) Brief summary of approach to choice of materials Analysis of color scheme Plan (and section, elevations if available) Photos, annotated to indicate materials Photographic material samples for floor, wall, ceiling, chair, and table or other major piece of furniture Description of materials (list under image): main wear properties (or typical characteristics), CSI section, finish, code classification, and any “green” certifications, such as Cradle to Cradle. assignment #1: precedent study

read article read article research designer research designer sleuth out materials sleuth out materials examples examplesprocess

presentation board layout

style of presentation style of presentation audience audience content content presentation sequence presentation sequence annotation (text, arrows, ancillary graphics, etc) annotation (text, arrows, ancillary graphics, etc) style of project style of projectconsider

orientation

organization

specifications what they are organization

just finishes just finishes just furnishings just furnishings just equipment just equipment FF&E FF&E scope indicates detail level

design-bid-build design-bid-build design-negotiate-build design-negotiate-build design-build design-build owner-build owner-build construction manager-advisor construction manager-advisor types of contracts

client client architect architect interior designer interior designer engineers engineers building and fire department officials building and fire department officials other design specialists other design specialists acoustic, lighting, hardware, furnishings, health care, etc. general contractor general contractor demolition crew electricianplumbercarpenter who looks at specifications, anyway?

supersede drawings supersede drawings materials grouped based on common practice materials grouped based on common practice organizational systems organizational systems smaller projects: fixtures, furnishings, equipment larger projects: CSI section GSA, military: their own systems All describe: All describe: materials, delivery, storage, installation can describe: can describe: production methods, protection, disposal, anything you want when written out…

open, or descriptive open, or descriptive describes material with generic terminology for common materials, such as red oak flooring performance performance describes material based on how it performs may use a reference standard, such as from ASTM allows contractor to source options closed, or proprietary closed, or proprietary specifies exact product typically a “cut” from a manufacturer’s catalog for project that are bid out, use standard three-part spec format types of specifications

for our project, what type of spec would be best? for our project, what type of spec would be best?exercise:

48 sections! 48 sections! everything, yes, everything, gets a number everything, yes, everything, gets a number every number (in theory) gets a specification every number (in theory) gets a specification in practice, not always standard spec smaller projects do not always require full spec larger, public, union work: full spec, always organization: CSI system

divisions we tend to worry most about divisions we tend to worry most about Division 09 Finishes Division 10 Specialties Division 12 Furnishings see the handout…

find the CSI section for each element in your cost estimate find the CSI section for each element in your cost estimate search (CTRL-F) in the document for key words search (CTRL-F) in the document for key wordsexercise:

1. general 2. products 3. execution use office standards if there are any use manufacturer’s or, online tools, if they have one online toolonline tool standard specification format: 3-part

show materials on drawings show materials on drawings drawings OR specs might include schedules drawings OR specs might include schedules typical schedules : typical schedules :furniturecabinetryhardwaredoorslighting link specs back to drawings

green design and sustainability

if you must, consider: if you must, consider: embodied energy embodied energy (production and transportation) embodied energy life cycle wear comparison to similar finishes life cycle energy use comparison (typically equipment, but also cleaning) toxicity at all stages of use/re-use (including adhesives, solvents, etc) re-usability or re-cyclability don’t build anything

if you must, consider: if you must, consider: embodied energy embodied energy (production and transportation) embodied energy life cycle wear comparison to similar finishes life cycle energy use comparison (typically equipment, but also cleaning) toxicity at all stages of use/re-use (including adhesives, solvents, etc) re-usability or re-cyclability don’t build anything

embodied energy embodied energy (production and transportation) embodied energy

life cycle wear comparison to similar finishes life cycle wear comparison to similar finishes

life cycle energy use comparison (typically equipment, but also cleaning) life cycle energy use comparison (typically equipment, but also cleaning)

toxicity at all stages of use/re-use (including adhesives, solvents, etc) toxicity at all stages of use/re-use (including adhesives, solvents, etc)

cradle to cradle cradle to cradle cradle to cradle to cradle flooring flooring wall base wall base [wall materials] [wall materials] wall finish wall finish ceiling system ceiling system certifications: classroom project

signage set from Vivid for our mock classroom project signage set from Vivid for our mock classroom projectVivid drag signs in from left to “sheet” on right drag signs in from left to “sheet” on right choose colors, fonts, etc (should match) choose colors, fonts, etc (should match)directory room signs workstation ID overheadrestroom save as a jpg save as a jpg upload, along with your cost estimate, to GullNet upload, along with your cost estimate, to GullNetexercise: