Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.

Slides:



Advertisements
Similar presentations
Collaboration of TE-VSC-SCC with straw-material working group NA62
Advertisements

Collaboration of TE-VSC-SCC with straw-material working group NA62 Delphine Letant-Delrieux TE-VSC-SCC NA62 straw working group meeting; D.L.D.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
18-Sep-15S.Movchan Straw manufacturing and QC1 Remove metallization from tape by laser. Part 2 laser mode optimization for Hostaphane RNK 2600 samples.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th february 2011 CERN1 Straw Material and development.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Qualification of the longitudinal weld of thin wall PET tubes of the straw tracker of the NA62 experiment Master thesis presented 28 th of june 2011 by:
Status of NA62 straw electronics Webs Covers Services Readout.
Collaboration of TE-VSC-SCC with straw-material working group NA62 Wil Vollenberg and Delphine Letant Delrieux TE-VSC-SCC NA62 straw working group meeting;
Neil Dixon PH/DT CERN 22/03/10 Straw Material Plans Latest news. Latest news. Many tests ongoing at CERN and in JINR in and attempt to validate in and.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
N. Dixon PH / DT Straw working group meeting Monday 14 December 2010 CERN1 Straw Material and development.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
My personal Resumé Very interesting work-shop, stimulating atmosphere and very good discussions. Accommodation is excellent. For the Straw Project we have.
Neil Dixon PH/DT CERN 01/02/10 Straw Material Latest news. Latest news. Informed last week that Hostaphan GN will only be available in large quantities.
Presented by: De Carlo Livio Supervisor: Scheubel Maud Section: EN/MME-MM.
Neil Dixon PH/DT Dubna July 1010 Straw Material latest news and plans 1.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
LEB 14 X 11 C. Garion Aluminum bellows for LHC experiments C. Garion, TE/VSC.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
SPS High Energy LSS5 Thermal contact & cooling aspects
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
The drift chamber with a new type of straws for operation in vacuum
S.Movchan Straw manufacturing and QC
STRAW TRACKER SYSTEM CAD STATUS :
LBNF CAD models, Drawings and Component list
S.Movchan Straw manufacturing and QC
Status of straw production straw module assembling
INSTALLATION SEQUENCE
Preliminary Y-chamber specifications – First draft
Neil Dixon PH/DT Dubna 30/11- 4/12 '09
PET tensile test revised data
MicroMegas Mechanical Meeting --- Cern April 2014
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010

Agenda NA62 Collaboration meeting, Brussels 7-10/9/2010 2

Content Chamber design status Straw material news Conclusions and future 3 NA62 Collaboration meeting, Brussels 7-10/9/2010

Milestone achieved 1/9 NA62 Collaboration meeting, Brussels 7-10/9/ Message to the SPSC “The following milestone deliverables were completed and are considered as final: The design of the STRAW chamber including; - The final straw layout - The chamber frame - straw end-pieces - spacer (straw supports) - assembly tooling - web (connection between straw and FE) - cover (*) with HV, signal and gas connections - grounding scheme - FEM calculation for chamber deformation and stresses under vacuum were done and checked - offers for manufacturing the first module (1/2 a chamber) have been received (896 straws)”

SPSC reply cont. Next Steps:Besides the construction of the first chamber module let me provide you some information on still outstanding issues for the STRAW tracker: - interface parts between chamber and blue tube (this is planned to start after the chamber design, first layouts exist…) - readout ( one proposal (Tell1 +HPTDC) was tested successfully in the test beam, however, other options are been discussed) - services (gas, electronic racks -> ongoing work inline with other sub-detectors) - support for chamber in the experiment (preliminary design available) - installation tooling (ongoing work) NA62 Collaboration meeting, Brussels 7-10/9/2010 5

Chamber design Ready for module 0 NA62 Collaboration meeting, Brussels 7-10/9/ ~50 kSFr for one module

NA62 Collaboration meeting, Brussels 7-10/9/2010 7

Experience with high energy physics projects; AMS ATLAS, CMS…. NA62 Collaboration meeting, Brussels 7-10/9/2010 8

QC 8 microns precision N. Dixon PH / DT NA 62 collaboration meeting Sept Brussels 9

Delivery and plans The assembly and full QC of the geometry will be added to the initial contract. Delivery ~1 November (estimate) Meaning full speed on turning table and other components required for the start-up of the assembly! NA62 Collaboration meeting, Brussels 7-10/9/

11 Coating of PET Fraunhofer successfully coated samples on 7/7/10 RNK 2600 ( coated on non treated side ) 30metres 50nm Cu + 20 nmAu 30metres 100nm Cu + 20 nmAu Melinex metres 50nm Cu + 20 nmAu 30metres 100nm Cu + 20 nmAu Slitting completed at Puetz Folien material returned to CERN + samples sent to JINR for straw manufacturing

Reminder Full quantity ordered and in stock stock at CERN: Hostaphan RNK microns 3 rolls with 1000m width: 650 mm N. Dixon PH / DT NA 62 collaboration meeting Sept Brussels 12

N. Dixon PH / DT NA 62 collaboration meeting Sept Brussels 13 Tests completes and foreseen Several QC test as specified in EDMS Id: Mechanical (all dimensions) metal thickness. Creep test. (Ongoing) Bonding Peel of metal coating (completed) Bonding of PET to a substrate (completed) XPS analysis (completed) Permeation (ongoing) MEB (ongoing) In parallel Ultra sonic welding. (started) MEB of welds Tensile test of weld Leak test Aging (Malter effect)

N. Dixon PH / DT NA 62 collaboration meeting Sept Brussels 14 Tests completed and foreseen (cont.) Creep test. (Ongoing) Comparative measurements under load between: Hostaphan GN 4600 Hostaphan RNK 2600 Melinex 406

N. Dixon PH / DT NA 62 collaboration meeting Sept Brussels 15 Tests completed and foreseen (cont.) Peel of metal coating (completed) Melinex 406 fails testHostaphan RNK 2600 passes test

Straw storage under pressure 16 NA62 Collaboration meeting, Brussels 7-10/9/2010

Summary and Conclusion We are switching to production…. Module 0 frame in November and start straw insertion in January A few critical issues/decisions in the fall (Dec.): Full straw validation (material, metallization and welding) FE choice from studies in the lab and test beam results in 2010 Choice for the readout (three options at present) Last but not least: Thanks to everybody who contributed to the finalization of the TD in time!! NA62 Collaboration meeting, Brussels 7-10/9/