Working group on Damping rings, ATF and CESRTA October 20 th, 2010 S. Guiducci (INFN/LNF), M. Palmer (Cornell), Y. Papaphilippou (CERN), J. Urakawa (KEK/ATF)

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

BILCW07 - Feb 2007 Global Design Effort 1 RDB S3: Damping Rings R&D Junji Urakawa for Andrzej Wolski (Cockcroft Institute), Susanna Guiducci (INFN-LNF),
Low Emittance Rings workshop scope January 12 th, 2010 Y. Papaphilippou, CERN Low Emittance Rings 2010.
ILCDR/CesrTA meeting Low Emittance Tuning 報告 K.Kubo.
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
Damping Ring issues Overall optimization, low emittance tuning and other beam tests February 2 nd, 2011 Yannis PAPAPHILIPPOU CERN 6 th CLIC Advisory Committee.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
Low Emittance Generation and Preservation: Damping Rings October 23 rd, 2012 Y. Papaphilippou (CERN) and J. Urakawa (KEK)
ILC Damping Rings R&D Meeting: Cornell, September 2006 Andy Wolski University of Liverpool and the Cockcroft Institute 26 September, 2006.
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
Conceptual Design of the CLIC Damping Rings October 20 th, 2010 Yannis PAPAPHILIPPOU CERN International Workshop on Linear Colliders 2010.
Damping Rings Y. Papaphilippou, CERN, D. Rubin, Cornell.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Dream test facilities for Damping ring R&D October 25 th, 2012 Yannis PAPAPHILIPPOU CERN.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
ILC damping ring options and their critical issues 12th July th ACFA MDI/POL/ACC Pohang Accelerator Lab. Eun-San Kim.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
About TWIICE: Topical Workshop on Instabilities, Impedance and Collective Effects In the series of Low Emittance Rings (LOWεRING) Workshops of the EuCARD-2.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
W. ChouLC School, Sokendai, Japan1 Linear Collider needs you  Linear Collider is HEP’s future (~ 2020)  If we want to have a future, we must train a.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
ILCDR'07, 5-7 March, INFN-LNF, Frascati, Italy ILC Damping Rings Technical and Organizational Status Andy Wolski University of Liverpool and the Cockcroft.
Emittances Normalised r.m.s. Emittances at Damping Ring Extraction Horizontal Emittance (  m) Vertical Emittance (  m)
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement LOW-ε-RING network:
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP6- Low emittance rings.
CERN 14 October 08 Injectors and Damping Rings working group S. Guiducci, L. Rinolfi CLIC08 Workshop.
Global Design Effort 1 ILC Damping Rings: Status and Plans Mark Palmer Junji Urakawa Andy Wolski ILC 08 UIC, Chicago, 20 November 2008.
Damping Ring Session Summary S. Guiducci TILC09 Tsukuba 21 April 2009.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Intra-Beam Scattering and Electron Cloud for the Damping Rings Mauro Pivi CERN/SLAC CLIC Collabortion Meeting CERN 9-11 May 2012 Thanks to: F. Antoniou,
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Emittance reduction by a SC wiggler in the ATF-DR September 16 th, 2009 Yannis PAPAPHILIPPOU and Rogelio TOMAS ATF2 weekly meeting.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
Welcome to the 3 rd LOW  RING workshop in Oxford 8-10 July 2013.
Summary of Workshop on Low Emittance Rings 2010
Oversea collaborators
remarks & workshop organization
Intra-Beam Scattering modeling for SuperB and CLIC
Mark Palmer Co-Convener CLIC-ILC Damping Ring Working Group
Damping Ring Summary S. Guiducci, M. Palmer, M. Pivi, J. Urakawa
LER 2010 Overview (and other)
ILC DR instability simulations
Andy Wolski University of Liverpool and the Cockcroft Institute
ILC DR instability simulations
CLIC damping rings working plan towards the CDR
Instability measurement plans at ATF
CLIC’08 workshop summary concerning damping rings
Status of CTC activities for the Damping rings
CTA 09 - Introduction David Rubin Cornell Laboratory for
Session Introduction & Damping Rings Baseline Lattice Decision
ILC DR instability simulations
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Damping ring activities
Presentation transcript:

Working group on Damping rings, ATF and CESRTA October 20 th, 2010 S. Guiducci (INFN/LNF), M. Palmer (Cornell), Y. Papaphilippou (CERN), J. Urakawa (KEK/ATF) International Workshop on Linear Colliders 2010

WELCOME!

Working group organised in parallel during Wednesday and Thursday, starting at 9am and finishing at 6pm, in roughly 8 sessions (4 per day) There are 2 common sessions (+ a common talk) Updated timetable and room information is provided in indico: Speakers should  Upload their contributions in indico  Contact any of the conveners in case of problem  Copy their presentation in a USB stick to avoid download hick-ups  Leave at least 5min at the end of their allocated time for discussion Some info… IWLC20103

Wednesday morning Opening session, Chaired by M. Palmer, room 17, Floor -1 9:00 Working group organisation Y. Papaphilippou, CERN 9:15 Design progress for the ILC Damping RingsS. Guiducci, INFN/LNF 9:45 Conceptual design of the CLIC Damping Rings Y. Papaphilippou, CERN 10:15 ATF statusJ. Urakawa, KEK 10:45 Coffee break Lattice design and Low emittance tuning, Chaired by R. Bartolini, room 17, Floor -1 11:15Update of 3.2 km ILC DR designJ. Gao, IHEP 11:40Low emittance tuning at CERTA J. Shanks, Cornell 12:05Australian synchrotron low-emittance tuning progress E. Tan, R.Dowd, Australian Synchrotron 12:3 0 Lunch break

Wednesday afternoon X-ray storage rings and kickers, Chaired by S. Guiducci, room 16, Floor -1 14:00DIAMOND status R. Bartolini, JAI/DIAMOND 14:30ATF fast kicker progress (Webex)T. Naito, KEK 14:55 Update on fast pulser design/prototyping for the ILC kickers (Webex) C. Burkhart, SLAC 15:20 CLIC extraction systems (common with WG6, 7 and 8, in Room 2, Floor 0) M. Barnes, CERN 15:40Coffee break RF systems (Common with WG8 and 4), Chaired by A. Grudiev, room 2, Floor 0 16:00IntroductionS. Guiducci, INFN 16:10Transient beam loading correction at ILC DRK. Kubo, KEK 16:35RF system issues due to pulsed beam in ILC DR S. Belomestnykh, Cornell 17:00Conceptual design of the CLIC DR RF systemA. Grudiev, CERN 17:25 Discussion on 50% duty cycle operation of the ILC DR and synergies with CLIC DR RF design ALL 18:00End of the first day

Thursday morning Instabilities, Chaired by J. Urakawa, room 17, Floor -1 9:00 Collective instabilities simulations for the CLIC damping rings E. Koukovini-Platia, CERN 9:30 Observations and Analysis of Fast Beam-Ion Instabilities at SOLEIL R. Nagaoka, SOLEIL 10:00 Coherent synchrotron radiation for damping rings: theory and experimental proposal F. Zimmermann, CERN 10:30Coffee break E-cloud, Chaired by G. Rumolo, room 17, Floor -1 11:00 Electron Cloud instability measurements M. Billing, Cornell 11:30 Electron cloud mitigation at CESRTA M. Palmer, Cornell 12:0 0 Lunch break

Thursday afternoon Wigglers (Common with WG8), Chaired by H. Schmickler, room 22, Floor 0 16:0 0 Design and prototyping of Nb3Sn wigglers for the CLIC damping rings D. Schörling, CERN 16:2 0 Short period NbTi wiggler prototype for CLIC damping ring A. Bragin, BINP 16:4 0 Progress on the superconducting undulator for ANKA and on the instrumentation for R&D S. Casalbuoni, ANKA IBS, Chaired by Y. Papaphilippou, room 17, Floor -1 14:00Simulation of Intrabeam scattering A. Vivoli, CERN 14:30Discussion on DR RF issues (if needed)All 15:30Coffee break Closing session, Chaired by Y. Papaphilippou, room 17, Floor -1 17:00 Recommendation on ILC DR EC mitigation (webex)M. Pivi, SLAC 17:30 Discussion on future R&D planning, experimental program and LER collaboration All 18:00End of the working group