Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
Ventricle Chamber Valve Imaging Chamber ECG Machine Aortic Compliance Chamber Buffer Chamber Secondary Compliance Chamber Flow Meter Pressure Sensors DAQ.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:10/25/2010.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Installation of the T600 at Fermilab CSN2, September 22,
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Presentazione delle richieste immediate per l’upgrade di MEG (gruppo di Roma) Cecilia Voena Mar 15 th, 2013.
Performed at Brookhaven National Lab for Fermilab Main Injector Electron Cloud Studies June 2009 Linda Valerio September 11, 2009.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
LKr status R. Fantechi.
Installation of an Instrument on a CERN machine
Gas System Commissioning
Teleconference ACS – FREIA 10th May 2017
Upgraded Injector Test Facility
Upgraded Injector Test Facility
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
CSC Electronics Installation and Commissioning CSCE I&C
Needed for Team A on -End
Presentation transcript:

Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao

June W. Molzon -- MEG Collaboration Meeting2 DC Gas System Hardware Status Hardware Status Plumbing in crate (valves, mass flow controllers, interfaces) complete Will add high pressure gas monitor Will incorporate target movement into gas control – eventually move to insertion tube control Finishing wiring of SCS2000 system this week – minor delays on some parts of SCS2000 system Can install in area next week Met with safety people and Wataru and no problems foreseen Vacuum pumps on site, being modified Pressure sensors to be mounted on interior cable tray (test magnetic effects) Connections to chamber Driven by chamber and endcap status Choose location now Ready to run gas lines – perhaps install a small covered tray Gas feedthroughs foreseen – appropriate flanges on endcaps Ongoing discussion on distribution helium in COBRA (interfaces with TC) Electrical feedthroughs being designed in common with DC HV, other LV lines (Malta); best to run electrical lines after paddle cards available Connections to vent and vacuum Minor questions about helium collection line and vent line pressures

June W. Molzon -- MEG Collaboration Meeting3 DC Gas System Software Status LabView control program ready – test next week with SCS2000 system SCS2000 control program with Labview monitor and user interface ready in few days –Old SCS1000 program was tested for most functions – very good control (<1 Pa) –Modifications for new code being done –Week of testing of all functions necessary (next week)

June W. Molzon -- MEG Collaboration Meeting4 Target System Status Hardware essentially complete (thanks to Andy, Florian, Dieter for some machining fixes) Control system mounted on DC support – test pneumatic cylinder operation next week Incorporate control system into DC gas system next week Alignment issues –Pre-align target in lab with respect to DC frame (survey required) – hopefully next week –Check reproducibility of target mount on stem (remove target when working with DC system) –Check reproducibility of target when inserted and retracted Currently missing position monitor (reflective optical switch) –Likely available in 2 weeks –Prepare for installation next week Prepare and run gas and electrical lines with the gas system lines Target material – still uncertain – propose to use mechanically good material for first engineering run Simulation to understanding precision of alignment with tracks