© POSEIDON WATER 2013 1 THESE MATERIALS HAVE BEEN PROVIDED TO THE COASTAL COMMISSION STAFF Huntington Beach Project Coastal Commission Hearing November.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Item #16 California Measure SB375: Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Florida Fish & Wildlife Conservation Commission ZOS Location Map Feet.
Carlsbad Desalination Project
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Policy Position Statement.  Ground Water Replenishment (GWR) - by Monterey Regional Pollution Control Agency (MRWPCA) and Monterey Peninsula Water Management.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Water Supply Planning Initiative State Water Commission November 22, 2004.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Patient Protection and Affordable Care Act March 23, 2010.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Butterfly Village (PLN080209) Monterey County RMA- Planning Director July 30, 2008.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Planning and Community Development Department Housing Element City Council February 03, 2014.
California Measure SB375: Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital Region.
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
Comprehensive Policy Plan Amendments Wekiva Parkway and Protection Act December 18, 2007 Comprehensive Policy Plan Amendments Wekiva Parkway and Protection.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
1 1 Reasonably Foreseeable Compliance Measures Sandi Potter Engineering Geologist.
June 10, 2008 Board of County Commissioners B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Transmittal Hearing.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
1 Poseidon Resources (Channelside), LLC Carlsbad Desalination Project Marine Life Mitigation Plan (MLMP) Marine Life Mitigation Site Selection and Preliminary.
The Proposed Poseidon Seawater Desalination Facility
1 Completing the CEQA Checklist Terry Rivasplata.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
Los Angeles District CERB June 4, 2009 Regional Sediment Management Plan Development throughout California Heather Schlosser Los Angeles District.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
Bay Club Marina Reconstruction Coastal Commission Hearing December 15, 2010; Agenda Item W16b These materials have been provided to the Coastal Commission.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
MLPA Closures 2. “Children’s Pool Beach is not the only beach located in La Jolla. There are several beaches located adjacent to or in close proximity.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Hohnloser De novo review of proposed boundary line adjustment at and South Highway One, Gualala, Mendocino County (APN ) Item F12a.
Item W12a – 12-AFC-03 – Energy Commission Review of Redondo Beach Energy Facility July 8, 2015 Energy & Ocean Resources Division.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Community Development Department Neoga Lakes Future Land Use Map (FLUM) Amendment.
Integrated Regional Water Management Grant Program Implemented Jointly by Department of Water Resources and State Water Resources Control Board.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Washoe County Board of Adjustment
GREENHOUSE GAS EMISSIONS INVENTORY
Test Slant Well Project Permit Amendment (Coastal Commission Agenda Item Tu 15a) Date: Oct. 6, 2015 Presented by CAW at the Oct. 6, 2015, California Coastal.
Fifth Standard Solar Project Complex
California’s Plan to Deal With Once-Through Cooling At
DG Environment, Nature Protection Unit (D3)
CP-TXT Water Supply Facilities Work Plan Amendment
Final Environmental Impact Report
WSUP (Lightning W Tank #2)
Washoe County Board of Adjustment
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Carlsbad and Huntington Beach Seawater Desalination Facilities
Presentation transcript:

© POSEIDON WATER THESE MATERIALS HAVE BEEN PROVIDED TO THE COASTAL COMMISSION STAFF Huntington Beach Project Coastal Commission Hearing November 13, 2013

© POSEIDON WATER  Use proven technology to affordably provide a long-term, local and reliable source of water not subject to the variations of drought or regulatory constraints  Reduce local dependence on imported water and strengthen regional self-reliance  Contribute desalinated water to satisfy regional water supply planning goals Key Objectives of the Huntington Beach Project

© POSEIDON WATER California and Orange County Counting on Seawater Desalination  California Department of Water Resources’ Water Plan Update sets a goal of up to 400,000 acre feet / AF of desalination by 2030  Project would provide 56,000 acre feet per year  Governor Brown’s recently released State Water Strategy identifies desalination as one of the pillars to increase regional water self-reliance  Metropolitan Water District of Southern California is counting on 150,000 acre feet of desalination by 2030  Project identified in Municipal Water District of Orange County’s RUWMP as necessary to reduce demand on imported water  50% of Orange County’s water supply is imported  Without seawater desalination, Orange County’s demand for imported water will increase

© POSEIDON WATER Project Permitting History

© POSEIDON WATER Proposed Project

© POSEIDON WATER Flow Schematic – Reusing Existing Industrial Facilities

© POSEIDON WATER RESPONSE TO STAFF REPORT

© POSEIDON WATER Applicant’s Request for Commission Approval  The Applicant requests that the Commission:  Approve the Project as submitted  Adopt the Applicant’s alternative conditions and findings  Primary differences with Staff recommendation:  Elimination of seafloor infiltration gallery requirement  Elimination of conditions that require a new design and a new entitlement process

© POSEIDON WATER STAFF REPORT – KEY ISSUES  Subsurface Intakes  Marine Life Effects  State Water Board’s Proposed Desalination Policy  Wetlands  Sea Level Rise  Special Conditions

© POSEIDON WATER ALTERNATIVE SUBSURFACE INTAKE SYSTEM SEAFLOOR INFILTRATION GALLERY

© POSEIDON WATER Subsurface Seafloor Infiltration Gallery

© POSEIDON WATER Subsurface Intakes: Site-Specific Project Analyses  The study and analysis of alternative subsurface intakes has been a primary focus throughout the Project’s entitlement process  Hundreds of pages of technical analyses of alternative intakes have been provided to permitting agencies that confirm the infeasibility of a seafloor infiltration gallery  The Regional Board relied on technical reports and site-specific data to reject a seafloor infiltration gallery and approve the Project’s use of the existing intake  Since 2006, the Applicant has provided Commission Staff with nine detailed submittals analyzing alternative subsurface intakes and site-specific conditions  The submittals include site-specific geotechnical reports analyzing offshore subsurface conditions at Huntington Beach

© POSEIDON WATER History of Subsurface Intake Analysis PSOMAS, 2007, Feasibility of Alternative Seawater Intakes for the Huntington Beach Desal Project PSOMAS, 2007, Supplemental Subsurface Intake Feasibility Assessment Water Globe Consulting, 2010, Evaluation of Alternative Desalination Plant Subsurface Intake Technologies Water Globe Consulting, 2011, Evaluation of Alternative Desalination Plant Subsurface Intake Technologies Tetra Tech, 2012, Technical Document Review for Site-Specific Hydraulic Conductivity Values Water Globe Consulting, 2012, Well Intake Capacity Updated Based on 2012 Soil Transmissivity Study Geosyntec, 2013, Review of Aquifer Properties and Potential Pumping Huntington Beach Desalination Plant Geosyntec, 2013, Feasibility Assessment of Shoreline Subsurface Collectors Geosyntec, 2013, Response to Requests from California Coastal Commission Staff Regarding Feasibility Assessment of Shoreline Subsurface Collectors Water Globe Consulting, 2013, Critical Review of 2013 Desalination Journal Publication on Subsurface Intakes

© POSEIDON WATER Subsurface Geotechnical Analysis Conducted  Staff requested that the Applicant conduct an offshore subsurface geotechnical analysis that included:  Seismic testing to determine subsurface characteristics of ocean floor  Assessment of seafloor sediment samples  Geosyntec conducted site-specific analyses, which included:  Seismic testing as requested by Staff; and  Analysis of existing site-specific sediment data in Huntington Beach Geosyntec Report corroborated earlier analyses and demonstrated:  Huntington Beach seafloor is not suitable for infiltration gallery  Seafloor sediments consist of “muddy sand” of low permeability

© POSEIDON WATER Locations of Offshore Sediment Samples

© POSEIDON WATER Location of Offshore Geotechnical Analysis

© POSEIDON WATER Results: Offshore Consists of “Muddy Sand”

© POSEIDON WATER Staff’s Recommendation Conflicts with the Regional Board’s Determination  In approving the Applicant’s NPDES Permit, the Regional Board analyzed a number of subsurface intake alternatives as well as the Project’s use of the existing intake  Subsurface intake alternatives analyzed included a seafloor infiltration gallery  The Regional Board found:  The Project’s use of the existing intake constitutes the best available technology feasible to minimize the intake and mortality of all forms of marine life in compliance with Water Code section (b). (Permit, p. F-30)  “A seafloor infiltration gallery sized for the Facility would impact approximately 64 acres of benthic habitat and beachfront.” (Permit, p. F-27)  “The alternative subsurface intakes were determined not to be the environmentally preferred alternatives.” (Permit, p. F-28)  “Taking into account economic, environmental and technological factors, the Regional Water Board finds that the alternative subsurface intakes are not feasible.” (Permit, p. F-28)

© POSEIDON WATER A Seafloor Infiltration Gallery is Environmentally Inferior  Excavation of 63.6 acres of seafloor habitat and beachfront  Displacement of plant and animal organisms on the seafloor  Periodic maintenance dredging every 1 to 3 years to remove unsuitable material and sedimentation, resulting in ongoing impacts to benthic communities  Construction of substantial pumping facility(ies), including associated acoustical and visual shielding, security fencing on the shoreline, and access road(s), restricting public access to the beach  Doubles intake-related energy consumption and GHG emissions  Substantial noise and vibration impacts from dredging and sheet pile driving  Removal and disposal of 290,000 to 560,000 cubic yards of seafloor material

© POSEIDON WATER Seafloor Infiltration Gallery Conflicts with Coastal Act and LCP Policies Marine Environment (Coastal Act Sections 30230, 30231)  Excavation of the seafloor would repeatedly and permanently impact the offshore benthic environment Public Access and Recreation (Coastal Act Sections 30211, 30220, 30221)  Public access and recreation impacts from the construction of 33 intake water collection wells and trenches for connector piping along one-mile strip of shoreline, including service roads Energy Consumption (Coastal Act Section 30253(d))  Energy to convey source seawater from infiltration gallery to desalination plant will be approximately 2 times higher than from collecting seawater from existing intake system

© POSEIDON WATER Subsurface Intakes Are Infeasible “ Feasible means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, and technological factors.” (Coastal Act § 30108)  Environmental: Staff’s recommendations are more environmentally impactful  Technological: Unproven technology; excessive risk  Economic: Not financeable; capital costs increase at least 50%  Social: Impairs coastal access and public recreation  Time: Would require a new entitlement process; current entitlements have taken 10 years

© POSEIDON WATER MARINE LIFE EFFECTS IMPINGEMENT & ENTRAINMENT

© POSEIDON WATER Marine Life Effects As proposed, Huntington Beach Project’s marine life effects are minimal - smaller than the Commissioned-approved Carlsbad project - and can be mitigated in compliance with Coastal Act.  Intake structure is not within an Area of Special Biological Significance (ASBS) or Marine Life Protected Area (MPA)  No threatened or endangered species; recreational species very uncommon  Estimated daily impingement of 0.78 lbs of fish/shellfish per day  92% reduction in fish impingement compared to HBGS’ impingement losses  Larval entrainment losses projected to affect only a small fraction of larvae  ( %) of the source water populations of 115 billion  Project would not affect the ability of species to sustain their populations

© POSEIDON WATER STATE WATER BOARD SEAWATER DESALINATION POLICY

© POSEIDON WATER SWB Proposed Desalination Policy  Acknowledges that seawater desalination is important to meeting State’s potable water demands  Designed to provide permitting guidance to Regional Boards  Draft plan has not been released  Requires public review and comment, CEQA clearance, & State Board and US EPA approval  Policy will be implemented through Regional Board’s NPDES permitting process  Project will have to comply with policy in order to maintain its NPDES permit  Poseidon proposed CDP special condition: Poseidon shall comply with all current and future Ocean Plan requirements applicable to the Project of the Talbert Aquifer.

© POSEIDON WATER WETLANDS

© POSEIDON WATER No Wetland Impacts  Staff incorrectly claims that areas within fuel storage tank containment berms were recently wetlands  SEIR Jurisdictional Determination concluded that vegetation, soils and hydrology onsite are not wetlands  No nexus to require wetland restoration  Staff incorrectly claims that adjacent wetlands will be impacted by project construction  Site design complies with LCP wetland setback policy  Only a portion of an access road and parking spaces are within 100 feet of a degraded pickleweed area  14-foot high, 60-foot wide containment berm provides buffer between Project site and pickleweed area  Mitigation measures minimize noise, light and vibration impacts

© POSEIDON WATER Pickleweed Area Buffer

© POSEIDON WATER SEA LEVEL RISE

© POSEIDON WATER No Sea Level Rise Impacts  Project site will not be affected by sea level rise  Project site is 9-14 ft above MSL  Worst-case sea level rise is 2 ft MSL by 2050 at Project Site  Project complies with Commission’s draft sea level rise guidance  Therefore, Project not affected by sea level rise  Poseidon proposed special condition: Permit expires 35 years after commercial operation; allows Commission to re-evaluate sea level rise impacts

© POSEIDON WATER APPLICANT’S PROPOSED PERMIT CONDITIONS

© POSEIDON WATER Applicant’s Proposed Permit Conditions  Poseidon proposing a separate set of Special Conditions to authorize approval of the Project as submitted  Incorporate elements of conditions recommended by Staff related to site-specific conditions in Huntington Beach  Eliminates requirement for a subsurface infiltration gallery  Eliminates requirements to start new entitlement and environmental review process, and to re-analyze issues that already have been thoroughly analyzed

© POSEIDON WATER Applicant’s Proposed Permit Conditions – Key Changes  Noise and Avian Protection (Special Condition 10)  Requires site-specific nesting surveys during construction periods  Establishes noise protection at active nest locations rather than site boundary  Utilizes 65 dBA standard consistent with Commission precedent  Seismic and Tsunami Protection (Special Conditions 15 and 16)  Applicant’s Special Condition 16 imposes all necessary structural stability requirements requested by Staff  Applicant’s Special Conditions eliminate duplicative requirement to study tsunami impacts that have already been evaluated and elaborate review and sign-off requirements from entities that do not have review authority  Applicant’s Special Condition 15 requires City approval of tsunami response plan and coordination with adjacent power plant on emergency response

© POSEIDON WATER Applicant’s Proposed Permit Conditions – Key Changes  Wetland Protection and Restoration  Sufficient buffers exist to avoid wetland impacts, consistent with LCP policy  Eliminates requirement to redesign Project to increase buffer width  Noise protection condition ensures no impacts to potential sensitive species  Eliminates obligation to create 14 acres of coastal wetland habitat since Jurisdictional Determination confirmed no wetlands on Project site  Marine Life Mitigation Plan & GHG Plan (Special Conditions 13 & 18)  Provides Commission ability to consider MLMP and GHG Plan at future hearing  Neither are deferred mitigation  Both must be approved prior to permit issuance & before development commences  GHG Plan with specific performance standards imposed as City condition  Applicant has already submitted proposed MLMP and GHG Plan, and the Commission has the discretion to approve those today

© POSEIDON WATER Conclusion  The Project is needed to meet to local, regional, and state water supply and reliability goals  Reduces Orange County’s need for imported water  The Project uses the best available technology feasible to minimize effects on marine life  The Staff’s recommendation is more environmentally impactful, conflicts with Coastal Act and LCP policies, and is infeasible  The Project as submitted is fully consistent with applicable Coastal Act and LCP policies

© POSEIDON WATER Applicant’s Requested Motions  November 11, 2013 Letter provides the following:  Applicant’s Proposed Conditions (Exhibit A – pink)  Applicant’s Suggested Basis for Findings (Exhibit B – yellow)  Motions and Resolutions to approve Applicant’s Proposed Project (Exhibit D – blue; Exhibit E – green)