BNL/AGS RSVP Upgrades Project WBS 1.4 – Breakout Session Rare Symmetry Violating Processes Preliminary Baseline Review Brookhaven National Laboratory 6-8.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Advertisements

Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
WAO Travis Shrey RHIC Machine Specialist Collider-Accelerator Dept Brookhaven National Laboratory 10/30/2014.
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
AGS RSVP Weekly Meeting P. Pile 27 Jan 2005 AGS RSVP Weekly Meeting 27 Jan 2005 Useful Links: RSVP Project : C-AD.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
AGS RSVP Weekly Meeting P. Pile 18 November 2004 AGS RSVP Weekly Meeting, 18 Nov 2004 Useful Links: RSVP Project : C-AD AGS Project:
Delivery Ring AIP Jerry Annala Dec 12, µ Scope Beam line aperture improvements Beam line aperture improvements Beam line power supply upgrades Beam.
Management subcommittee closeout Jay Marx (chair, LBNL), Joel Butler (Fermilab), Stan Wojcicki (Stanford) Thanks to all for cooperation and openness!!
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
AGS RSVP Weekly Meeting P. Pile 5 May 2005 AGS RSVP Weekly Meeting 5 May 2005 Useful Links: RSVP Project : C-AD.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Office of Science U.S. Department of Energy Management of Unneeded Materials and Chemicals (UMC) Arnold Edelman Office of Science May 2006.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alexei Fedotov Project Management.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
AGS RSVP Weekly Meeting P. Pile 14 Apr 2005 AGS RSVP Weekly Meeting 14 Apr 2005 Useful Links: RSVP Project : C-AD.
TOF Project Construction Project Plan
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
AGS RSVP Weekly Meeting P. Pile 17 Mar 2005 AGS RSVP Weekly Meeting 17 Mar 2005 Useful Links: RSVP Project : C-AD.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
1 RSVP Project Director’s Review with Laboratory Oversight Group Attendance Jan 2005 WBS 1.4.5, AGS Project Office (and WBS Beam Development)
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
AGS RSVP Weekly Meeting P. Pile 30 December 2004 AGS RSVP Weekly Meeting 30 Dec 2004 Useful Links: RSVP Project :
1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004.
1 AGS RSVP Review 4-5 November 2004 AGS RSVP Upgrades - Overview Philip Pile Collider-Accelerator Department 4 Nov 2004.
1 RSVP Cost and Schedule Review 9 December 2004 AGS Upgrades Philip Pile WBS 1.4 Project Manager.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
AGS RSVP Weekly Meeting P. Pile 24 Mar 2005 AGS RSVP Weekly Meeting 24 Mar 2005 Useful Links: RSVP Project : C-AD.
Brookhaven Science Associates U.S. Department of Energy RSVP Safety and Environmental Protection Issues E. Lessard Associate Chair for ESHQ Collider-Accelerator.
AGS RSVP Weekly Meeting P. Pile 16 December 2004 AGS RSVP Weekly Meeting 16 Dec 2004 Useful Links: RSVP Project :
1  Power plant costs are key factors in energy market policy decisions Key assumptions in the EIA NEMS model Input factors to all energy economic models.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
More beam (muons) from the AGS AGS RHIC Users Group Meeting EDM Workshop Brookhaven National Laboratory 7 June 2006 Phil Pile.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
AGS RSVP Weekly Meeting P. Pile 10 Feb 2005 AGS RSVP Weekly Meeting 10 Feb 2005 Useful Links: RSVP Project : C-AD.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Accelerator Support and Maintenance Startup for Run 13.
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
AGS RSVP Weekly Meeting P. Pile 10 Mar 2005 AGS RSVP Weekly Meeting 10 Mar 2005 Useful Links: RSVP Project : C-AD.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Page Headline Project Management Cost & Schedule Review Rob Michnoff.
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
News and brief overview of Beamline plans for the next few months
“Together, we’re so much more!”
Conventional Facilities (WBS 1
Presentation transcript:

BNL/AGS RSVP Upgrades Project WBS 1.4 – Breakout Session Rare Symmetry Violating Processes Preliminary Baseline Review Brookhaven National Laboratory 6-8 April 2005 Phil Pile

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review2 AGS Complex Booster AGS K0PI0 MECO to RHIC Linac HITL C-AD Admin NSRL

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review3 AGS RSVP Project Office AGS Office P. Pile, Project Manager A. Pendzick, Deputy Project Manager WBS 1.4 AGS/Booster K. Brown WBS Switchyard A. Pendzick WBS K0PI0 C. Pearson WBS MECO D. Phillips WBS Project Office P. Pile WBS Fiscal D. Sappo QA D. Passarello ES&H E. Lessard Mechanical Engineering J. Tuozzolo Electrical Engineering J. Sandberg

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review4 WBS 1.4 Materials & Labor

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review5 WBS 1.4 costs

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review6 WBS 1.4 Work 40 FTE’s per year

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review7 Basis of cost estimates Level 3 sub-system managers are responsible for cost estimates and schedules for their work Bottoms-up approach to cost and scheduling –The physicist or engineer responsible for the work estimated the cost and developed the schedule – this individual holds the Cost Book and Project file – WBS 1.4 has 10 cost books and 40 individual project files –Schedules were developed consistent with target milestones determined by experiment needs (tempered with reality) –Contingency was estimated using the “Lockheed” formalism (levels and weights) –Costs were scrubbed at least once by peer group C-AD engineers/physicists –Individual fully-loaded project files are linked to a Master Project file. Costs, schedule and personnel requirements etc presented at this review came from this file.

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review8 Basis of cost estimates The WBS 1.4 Cost Books RF Systems –Alex Zaltsman –WBS AGS/Booster Mechanical –George Mahler (Joe Tuozzolo, Chien Pai and Mike Mapes will substitute) –WBS AGS/Booster Switchyard (WBS 1.4.2) –Al Pendzick KOPIO (WBS 1.4.3) –Charlie Pearson KOPIO Electrical –Bob Lambiase –WBS (AGS Booster Kickers – A10)

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review9 Basis of cost estimates The WBS 1.4 Cost Books (cont’) Security –Neville Williams –WBS (Switchyard), (K0PI0), (MECO) Instrumentation –Dave Gassner –WBS (AGS/Booster), (Switchyard), (K0PI0), (MECO) Electrical –Bob Lambiase –WBS (AGS/Booster) Controls –Don Barton –WBS (AGS/Booster), (Switchyard), (K0PI0), (MECO) MECO (WBS 1.4.4) –Dave Phillips

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review10 Supplemental Material

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review11 WBS 1.4 Dictionary L3 Summary

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review12 Experiment construction milestones RSVP Beam Development Possible K0PI0 Engr/Physics Run

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review13 Machine construction milestones RSVP Beam Development Possible K0PI0 Engr/Physics Run

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review14 RSVP Specific Considerations – Cost basis Since the RHIC program does not support any manpower for AGS experiments all experimental area manpower support will be billed to the NSF consisting of:  a base manpower level that supports the extraction system, switchyard transport, primary proton transport and the primary target area (common to both RSVP experiments)  Incremental manpower for each experiment RSVP Operations Cost

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review15 RSVP Specific Considerations RSVP manpower is matrixed into the Collider-Accelerator Department staff  Main control room operations is sufficient to cover SEB operations during RHIC collision operations except for an incremental effort to support the SEB extraction system  RSVP support personnel will come from the present C-AD staff together with new hires  C-AD RSVP support personnel will retain RHIC responsibilities at a reduced level  When a conflict between RHIC and RSVP support arises, RHIC support will win in all cases that could impact RHIC operations  Material costs are based on actual costs of AGS operations in support of HEP and NP fixed target experiments (late 1990’s). Full costs are recovered if running outside RHIC operations, otherwise the costs are incremental to RHIC operations.  Pre-Operations are similarly handled but with reduced costs due to reduced indirect charges (part of construction project) and limited operation (equipment development/testing). Operations Cost Basis

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review16

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review17

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review18

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review19 RSVP Personnel Costs - Common

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review20 RSVP Personnel Costs – Exp. Specific

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review21 MECO Cryo Ops and Maint Cost Est

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review22 MECO Primary Beam Power Estimate

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review23 K0PI0 Primary Beam Power Estimate MagnetTypeField(kG)Current(A)Power Supply (KW) BD318D BD43.5X7D BD5-83X4D BP TOTAL0.4 MW MagnetTypeGradient(kG/cm)Current (A)Power Supply (KW) BQ5,84Q BQ6,74Q BQ 9a,b4Q BQ108Q BQ118Q BQ125Q BQ135Q BQ143Q

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review24 K0PI0 Neutral Beam Power Estimate

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review25 RSVP Pre-Operations Costs

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review26 RSVP Pre-Operations Costs

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review27 RSVP Pre-Operations Costs

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review28 RSVP Pre-Operations Costs

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review29 RSVP D&D Costs (work in progress) The D&D plan for RSVP is to restore the AGS floor to the pre-RSVP condition within a reasonable number of years after the end of experiment operations It is recognized that the experiments will generate significant amount of beam activated components that will have to be disposed of and a 2-3 year “cool-down” period will be required before D&D can begin The slow beam transport will decommissioned starting at the point where it leaves the switchyard shielding to the RSVP targets All commonly reused valuable equipment such as magnets will be stored except for equipment specific to the RSVP experiments, these will be considered radioactive waste

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review30 RSVP D&D Costs (work in progress) The cost of removing and disposing of the experiments will be included Shielding under 5mr will be left in building 912 All concrete floor areas over 5mr will be removed and replaced, but no radioactive soil remediated Power and water modifications for RSVP will be removed except where considered an upgrade to existing utilities The AGS and Booster will remain operational for RHIC when RSVP is complete so the only D&D envisioned will be for those components added specifically for RSVP and not required for future operation It is anticipated that incremental D&D costs will be assessed yearly over the length of the planned operation of the RSVP project, by a panel appointed by the DOE and NSF, with funds placed in a suitable escrow account

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review31 K0PI0 D&D Cost Estimate (work in progress) (K$’s) Labor disposal cost Total These cost estimates have NOT been reviewed and are presented for general guidance only!

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review32 MECO D&D Cost Estimate (work in progress) (K$’s) Labor disposal cost Total These cost estimates have NOT been reviewed and are presented for general guidance only!

April 6-8, 2005P. Pile RSVP Preliminary Baseline Review33 D&D Costs Roll-up The below costs are in millions of FY 2003 dollars, fully burdened ExperimentEstimated D&D Cost K0PI0$5.3 MECO$5.3 Contingency$2.7 Total Estimated Cost$13.3 These cost estimates have NOT been reviewed and are presented for general guidance only!