1 Consult21 webcall – BT Wholesale Service availability data (Datasets) Peter Davis, BT Design Bill du Cann, BT Consult21.

Slides:



Advertisements
Similar presentations
Carrier Pre-Select Meeting BT Systems Interface Roadmap
Advertisements

BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.
11 Simultaneous Provide. 22 Disclaimer: The information contained in this Presentation slide-pack is confidential information for discussion purposes.
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
Simultaneous PSTN and Broadband Provision Process Incorporating Broadband Movers Issue 5.
1. Click on “Sign In”. 2. Click on “Create an Account”
BT Wholesale Broadband Escalations Portal Adding or Retrieving Notes
Members Only & Login Modules Members Only works with the Login module to provide password protection to Web pages and files. Login Groups may be created.
Title Consult 21 Mike Reed - Openreach Name 21 st February 2006.
Global Contact International Publishing Corporation
Roadmaps Andy Wright Natalie Walker Simon Brisbourne.
Broadband Product Road Map 2012/13 H2 2013/14 H1 2013/14 H2 20C Fibre 21C Migration from 20C IPstream to 21C Wholesale Broadband Connect Release AK 17.
Introduction to the Secure SMTP Server service. Secure SMTP server is a secure, reliable SMTP mail relay server for your outgoing mail. Secure SMTP service.
ONLINE CLAIMS TRACKING
Click to edit Master title style TDM Access & TDM Backhaul PPC Forum June 12 th 2008 Ian Boothman Spyros Christou.
21CN Network Inventory Service Availability & Network Inventory Datasets 15 th September 2009 Paul Reed Owen Gardner Peter Davis.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
1 New actions from Oct 2012 ActionOwnerActionStatusDetail AP1 10/12 Simon Brisbourne Investigate requirement to have bills in PDF format New AP2 10/12.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
Going faster and staying in control - Building the world’s biggest NGN Tim Hubbard Head of Technology Futures.
Standard Contract Forum 24 April Customer Suite, BT Centre, London.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Quarterly update webcall on BT’s 21CN programme 28 th April 2009 Welcome to the BT's 21CN programme is subject to consultation and further development.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
Welcome to corporate.eircom.ie This presentation aims to give you an overview of corporate.eircom.ie, what it offers you and how best to navigate your.
GSA’s Vendor and Customer Self Service (VCSS)
You SaidWe Did Update Repeat SFI’s Tags on Lines Service Broadband You were unhappy with the number of repeat SFI visits required before a fault was fixed.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 11 – 24 September 2007 Information.
Password Recovery Via Customer Care. Account Detail Via Customer Service. Account Configuration With Our Experts. You Want Recover All information.
Avaya Single Sign On (SSO)
Equal Access: Space, Power & Common Infrastructure – LLU and 21C Gary Williamson Openreach LLU Business Improvement Manager January 2006 Queries to
BT Wholesale Customer Roadmap 1 st July 2008 Welcome Chris Booth Business Improvement Programme Graham Crane Consult21.
Consult21 Broadband Products Webinar – 18 th October 2007 Cleo Carris-Jones Mandy Ogbodobri Raf Leadbetter Intro: Bill du Cann.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Multi-Service IP Interconnect 6 th May Multi-Service IP Interconnect A Multi-Service Interconnect Link to support PPCs PSTN/ISDN DataStream Multi-Media.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
BT Wholesale Products June, SOR Management Tool Angus Flett John Skingle.
All Unit Charter Renewals are due at the respective District’s Roundtable Meeting in November Last Updated 9/29/15.
Introduction to Clear Path: School Admin 1 Welcome to Clear Path! Your school has elected to use the Clear Path resiliency assessments to measure the.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 14 – 03 November 2008 Information.
Information in this presentation is subject to change NEXT GENERATION BROADBAND UPDATE Thursday 3 April 2008 Delivered over BT’s 21 st Century Network.
Quarterly update webcall on BT’s 21CN programme 26 th October 09 Welcome to the BT's 21CN programme is subject to consultation and further development.
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
Global Field Operations From Vision to Value Cisco Confidential1© 2011 Cisco and/or its affiliates. All rights reserved. Access to PMC Partner Training.
GHA911 Enhancements A Brief Overview **Note: Data shown in these slides is from the development system and may not match data on the main system.
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
For discussion purposes. No implementation assurances Interconnect Links and Congruent Call pricing Robin Charles, Clive Feather and Ian Self The information.
1G and 10G MSIL SFOA1 Trial Updates Week Ending: 13 June 2008 Beatrice Osborn Product Development, BT Design.
Contract System Online Employee Signatures Human Resources my.brocku.ca.
SAP Employee Self Service Personal Data Overview Time Entry information not covered in this presentation.
7 Day Self Assessment Tool (7 Day SAT) March 2016 Survey - User Guide v4 (March 2016)
New Online Signup – Slide 1 You can register a new Distributor on the existing link on Distributor Services.
Guest Wireless Service Overview Andrew Rader November, 2013.
STARR Companies: HR Portal New User Registration Guide
Internet Safety Awareness
Referral to Community Support Services
ePartner Portal for A/C Managers -
How to Navigate MyNaropa
Online Testing System Assessment Viewing Application (AVA)
Placing an order for Etherway Fibre and Etherflow Connected
Business zone Ethernet – Ordering a Radio Survey
Placing an order for Etherway Copper
Skype for Business Webinar Meeting
Online Testing System Assessment Viewing Application (AVA)
Xoserve IX Refresh Update
How to Navigate MSA-U Need help?
Business Zone – User Guide
Placing a Broadband Provide Order Version 1
Ethernet diagnostic journey explained
Registering your returning student at Moody ISD
Presentation transcript:

1 Consult21 webcall – BT Wholesale Service availability data (Datasets) Peter Davis, BT Design Bill du Cann, BT Consult21

2 Agenda Scope of what is covered Historical perspective What’s changed? Overview of the datasets – NB service availability data What is open and what is secure? How to access the open area data Process for gaining access to secure data Demonstration Next steps Q&A

3 Scope of what is covered BTWholesale data areas pertaining to nodes and services Also houses shared BTWholesale and Openreach data Has both open and secure data elements But… not the Openreach only datasets –These are subject to Openreach communications

4 Historical perspective Recognised the need to provide key data points for the 21CN nodes Data was initially made available specifically for those CPs who were interested in planning to interconnect Datasets were constructed and loaded on the Network Information Publication Principles (NIPP) portal Required bespoke access and an agreement via restrictive Non Disclosure Agreements (NDAs)

5 What’s changed? Have recognised and catered for the needs of non interconnecting CPs Have created an easier access path –(access via NIPP will remain until end April 08) Have created additional datasets to describe the specific availability of services, in terms of location and time Have enhanced names/descriptions of the datasets Have removed the restrictive NDA arrangements All can see basic service data BUT…. –Still need special arrangements to see the detailed network information

6

7 Dataset 38 BTW Harmonised Ethernet Availability Metro 1141 Roll-out Start Null field MDF ID Roll-out End Dataset 39 Metronode MSIL Availability Metro 1141 Roll-out Start Variant Roll-out End Dataset 40 Locality To Metronode ID Metro 1141 Locality Dataset 41 WBC Launch By PSTN Number Range Number Block Conc 1141 Earliest I/XAvail’ Trial Latest I/X Avail’ Number Block Locality of I/X Exch Conc MDF ID Earliest Avail’ Latest Avail’ Service availability data

8 What is open and what is secure? Open data: –Wholesale Broadband Connect: availability and roll out data –Ethernet availability –Multi-Service Interconnect Link availability (to be added) –IPstream connect availability (to be added) –Product retirements (To be constructed) Secure/encrypted data –Names and addresses of BT exchange and interconnect nodes –Network structure and mapping information

9 How to access the open area information It’s two clicks from: BTwholesale.com –Must be logged into customer zone first though Click 1: Network info Click 2: 21CN Service Availability and Network Inventory Or go straight to: _Availability_and_Network_Inventory.html

10 This is the data area to navigate to This is the tab to select

11 Process for gaining access to the secure data Must have registered account with BTwholesale.com customer zone Must have clearance as Cat A or Cat B CP from Centre for the Protection of National Infrastructure (CPNI) Contact account or commercial manager to gain access and (if no I/x agreement) sign Non Disclosure Agreement BT will the data encryption key and grant access to this secure area of the site –not the same as the C21 secure area Once access is granted, this data can be obtained via the appropriate link from the open area

12 Demonstration

13 Next steps Control over data uploads –Granularity –Frequency Possible map to compliment availability schedules Review to see what else can be made public You tell us via:

14 Question and answer session Via audio Via webcall question area

Issue date BACK UP SLIDES

16

17

18

19 Example of data

20 New Datasets Dataset 38 BTW Harmonised Ethernet Availability Metro 1141 Roll-out Start Null field MDF ID Roll-out End Dataset 39 Metronode MSIL Availability Metro 1141 Roll-out Start Variant Roll-out End Dataset 40 Locality To Metronode ID Metro 1141 Locality Dataset 41 WBC Launch By PSTN Number Range Number Block Conc 1141 Earliest I/XAvail’ Trial Latest I/X Avail’ Number Block Locality of I/X Exch Conc MDF ID Earliest Avail’ Latest Avail’