Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Slides:



Advertisements
Similar presentations
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Advertisements

TSO Transparency project Gas Regional Initiative North West Ofgem, Great Britain Regional Co-ordination Committee 18th February 2011.
Presentation of the ERGEG Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid, 20th.
Gas Regional Initiative – North West Region The Hague 13 December 2007 Day Ahead On x-borders of 2008 Presentation to the RCC.
Gas Regional Initiative – North West Region Bonn 28 April 2009 Fiete Wulff Capacity Project C1 Short-Term Capacity (STC) Operators’ Group Update.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
European Transparency Project Progress Olaf Islei European Strategy and Environment 04 September 2008.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Transparency Workstream Gas Regional Initiative North West Region By: Cemil Altin Workstream Leader Bonn Workshops 8-9 February 2007 NRA logo.
GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
® July 30 th, 2014 Utah PSC Technical Conference.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
GRI NW Transparency Stockholm Stakeholder Group Conference 26 November 2009 Martin Crouch Partner: European Strategy.
New tariffs system in France GTE 23 rd October 2003 Jacques Laurelut.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
N-W Regional Initiative: Transparency Questionnaire Results Sonia Brown Director – European Strategy & Environment 19 September 2007.
Gas Regional Initiative North-West Gas Balancing Dublin Workshop 24 th April 2007 Steve Pownall.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
1 Day Ahead Auctions Making progress, Jour Fixe Day Ahead Auctions pilot 14 th of September 2007 Jour Fixe The Hague Conclusions and homework Chair DTe.
Gas Regional Initiative – North West Region Governmental Meeting 6 May 2010 – The Hague Secondary capacity markets Project update Betsy ANNEN – CRE Bernhard.
Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘
Gas Regional Initiative North-West Transmission Transparency Transmission Transparency Project GRI North-West Operators‘ Group Stakeholder Group Meeting.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Implementation progress – second stage Olaf Islei European Strategy and Environment.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
6th Stakeholder Group meeting Stockholm – 26 November 2009 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer,
Implementation progress – second stage Transmission Transparency Workshop London, 14 November 2008.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Transparency Project GRI NW Region
New transparency guidelines
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
2009 TSO Transparency Gas Regional Initiative North-West
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
GRI NW TRANSPARENCY PROJECT
Transparency Platform
Transparency Project GRI NW Region.
European Transparency Requirements
Gas Regional Investment Plan project
40th IG meeting 29th November 2016
EUROPEAN TRANSPARENCY UPDATE
Work plan of GRI NW for 2011 Three out of four projects are started
Presentation transcript:

Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project Project Plan The Hague, 13 December 2007 Contact: Oliver Altenhoff E.ON Gastransport AG & Co. KG Kallenbergstr Essen GERMANY

Gas Regional Initiative North-West Transmission System Operators Page 2Transmission Transparency, Overview  Introduction  Information to be published  List of Participating Operators  Interconnection Points  Time Schedule  Specific Time Schedule of Implementation  Monitoring of Implementation  Cost Statements

Gas Regional Initiative North-West Transmission System Operators Page 3Transmission Transparency, Introduction At SG meeting in Dublin, TSOs announced the development of a project plan for best practices based on requests of market participants EFET wish list established (Requirements go beyond current legislative requirements)  Transparency questionnaire responses and Ofgem-Workshop  A high-level plan published by TSO: commitment to the wish list  Detailled plan shows the implementation process

Gas Regional Initiative North-West Transmission System Operators Page 4Transmission Transparency, Information to be published The following information refers to Interconnection Points  Max technical capacity of the transmission system  Daily commercial firm and interruptible capacity  Interruptions /Interrupted flows  Daily flow / aggregated allocations (D+1)  Daily prompt allocation information to each shipper  Daily aggregate day-ahead nominations (D-1)  Historic gas flow information database

Gas Regional Initiative North-West Transmission System Operators Page 5Transmission Transparency, List of Participating Operators Netherlands United Kingdom GermanyBelgium FranceIreland Sweden Northern Ireland Denmark

Gas Regional Initiative North-West Transmission System Operators Page 6Transmission Transparency, Interconnection Points 69 points publ. avbl. 57 points confid.

Gas Regional Initiative North-West Transmission System Operators Page 7Transmission Transparency, SepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec Identification areas of quick wins High level plan Feedback TSOs finalization on plans Detailed project plan Implementation at each TSO Result Time Schedule First winsLater winsFinal wins

Gas Regional Initiative North-West Transmission System Operators Page 8Transmission Transparency, Specific Time Schedule of Implementation

Gas Regional Initiative North-West Transmission System Operators Page 9Transmission Transparency, Specific Time Schedule of Implementation

Gas Regional Initiative North-West Transmission System Operators Page 10Transmission Transparency, Monitoring of Implementation  TSO will send progress reports to RCC  First progress report in May 2008 Mid-term report in February 2008  Second progress report in November 2008 Mid-term report in July 2008  Final progress report in January 2009

Gas Regional Initiative North-West Transmission System Operators Page 11Transmission Transparency, Cost statements  Operators will have first cost estimations in Jan/Febr for discussion with RCC.  Should be handled on the national level first

Gas Regional Initiative North-West Transmission System Operators Page 12Transmission Transparency, Transmission Transparency Project Contact: Oliver Altenhoff E.ON Gastransport AG & Co. KG Kallenbergstr Essen GERMANY Thank you!