Autonomous Inspection Unit Seaham Quarry Site Contact: Richard Tomkins - Quarry Manager Phone: 0408353154.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Total Productive Maintenance
MAINTENANCE MANAGEMENT Module 9
Factory Objectives Value of Asset Management Strategies.
Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
Mainttobe Breakdown Maintenance Process Production Operator/supervisor Investigate fault Breakdown event Quick Fix Yes No Fix it Maintenance Team Repair.
What is Engineering? Chapter 4. Accreditation Board for Engineering and Technology “Engineering is the profession in which a knowledge of the mathematical.
Business Critical Rules March 2015
Be prepared before it happens!! Have procedures and policies in place before you have to respond to a retrieval. Training- Have personnel that are.
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
Lesson 5 Computer-Related Issues
Maintenance At Your WWTP August 2010
Preventive Maintenance
All activities involved in keeping a system’s equipments working are the part of maintenances management. Maintenance of machine involves the efforts.
ICASAS305A Provide Advice to Clients
PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
Computerised Maintenance Management Systems
Proposed Rule for Sanitary Transportation of Human and Animal Food
Job Training Analysis: Integrating Production with Safety Collaborative work - field testing a process for quickly developing information for use in skills.
Job Hazard Analysis Development
Introduction Definition Advantages for employees and employers
MAINTENANCE STANDARDS & PLANNING
June 20, 2012 Outsourcing Physical Plant Should I ???
M otor C arrier S afety A dvisory C ommittee Subcommittee on EOBR Implementation Workgroup Reports – Manual Inspection Presented by Greer Woodruff – J.B.
Work Health and Safety (National Uniform Legislation) Act and Regulations NT WorkSafe Anna McGill.
Single Minute Exchange of Die OR Quick Changeover
© CCI Learning Solutions Inc. 1 Lesson 5: Basic Troubleshooting Techniques Computer performance Care of the computer Working with hardware Basic maintenance.
Visual Management Quick Review
Presentation on Preventive Maintenance
Total Productive Maintenance (TPM)
Elements of Effective Behavior Based Safety Programs
Hazards Identification and Risk Assessment
“Without the Cost of Waste …”
PMO2000™ 1 Improved Reliability through PM Optimisation Project Team: Electrician Planner Mechanic Operator Reliability Engineer.
Isolation Lock-Out Room Johns River Quarry Site Contact: Blake Ardrey, Quarry Manager, BCM, Johns River Quarry Phone:
WHAT IS ENGINEERING?. ACCREDITATION BOARD FOR ENGINEERING AND TECHNOLOGY “Engineering is the profession in which a knowledge of the mathematical and natural.
CBER Common Problems on Source Plasma Inspections Judy Ellen Ciaraldi BS, MT(ASCP)SBB, CQA(ASQ) CBER, OBRR, DBA September 16, 2009.
Computerised Maintenance Management Systems
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Risk Identification. Hazards and Risk Section 2: ACCIDENT THEORIES 2.1 Single Factor Theories  This theory stems from the assumption that an accident.
Modern Maintenance. Management
INNOVATE THROUGH MOTIVATION Mobile Computing & Your Business KEVIN KIRKPATRICK – OWNER, MSP INC LOGO.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware.
OHSAS Occupational health and safety management system.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS.
Troubleshooting. What is Troubleshooting ? Troubleshooting is a problem solving method. Other problem solving methods are invention, innovation, engineering.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Lowell Randel Vice President, Government and Legal Affairs Global Cold Chain Alliance.
1 Dr Małgorzata P ę ciłło Central Institute for Labour Protection – National Research Institute ul. Czerniakowska 16, Warsaw, Poland
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
MANAGEMENT INFORMATION SYSTEM
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
Maintaining Safety Standards
Maintaining Safety Standards
Industrial Assessment Center Database
Health Risks in Construction
Fans & Heaters technical seminar
“Prepare, Prevent, Respond”
Increasing Asset Lifecycle through the application of Innovative Technology
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
PREVENTIVE MAINTENANCE By: Mary Solomon Inyang. DEFINITIONS Preventive maintenance refers to regular, routine maintenance to help keep equipment up and.
You’ve bought a LIMS, now what?
Lesson 5 Computer-Related Issues
Please read this before using presentation
Accident Investigation
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Autonomous Inspection Unit Seaham Quarry Site Contact: Richard Tomkins - Quarry Manager Phone:

Background  Preventative Maintenance inspections are key in running a successful and reliable quarry operation. The benefits of properly operated preventative maintenance are; -Equipment downtime is decreased and the number of major repairs are reduced -Better conservation of assets and increased life expectancy of assets, thereby eliminating premature replacement of machinery and equipment -Reduced overtime costs and more economical use of maintenance workers due to working on a scheduled basis instead of a crash basis to repair breakdowns -Timely, routine repairs circumvent fewer large-scale repairs -Improved safety and quality conditions for everyone -Accurate records of inspections and completed tasks enables trending for predictive maintenance activity.  A significant quantity of preventative maintenance inspections require equipment to be isolated and personnel to enter a space not designed for human occupancy.

Concern  Preventative maintenance inspections in screens and chutes require personnel to engage in high risk activities, particularly; -Confined Space  Manual handling and movement tasks associated with screen and chute inspections can cause strains  Length of time required to complete the inspections – what is acceptable?  Preparation of documentation for maintenance activities is time consuming  Record keeping of accurate inspections are not detailed enough.

Cause  The operational, maintenance and management team asked themselves “Why do we need personnel to enter a confined space to conduct an inspection?”  The answer being “Because that is how the industry has historically done it”  From this the team set a task to find a solution and eliminate the risks associated with conducting screen & chute inspections, improve the time required to conduct inspections and provide accurate records of inspections

 Together the team identified an opportunity using remote camera technology to eliminate the need for personnel to enter the confined space.  The camera system can take photos and video recordings which can be saved on a computer and referred to at a later date.  The need for high risk permits and confined space training is no longer necessary to conduct screen inspections. Solution – Remote Camera Inspection Unit

 The unit can identify; -Missing bolts -Wear on screen media -Worn centre & side rails -Chute wear -Material build up -Pegging

 The original application lacked the flexibility of being able to turn and focus on issues. Together the team identified an opportunity using RC vehicles to excel the capability and application of the system.  Extensive research was undertaken to find the most appropriate lighting and RC build to ensure the vehicle was robust and provided quality film and photos. Further Development – Autonomous Inspection Unit

The unit worked so well in the screens we went one step further sending it into chutes and under crushers where we have our most tightest confined spaces. Again giving us a great view and taking the strain of the inspector. Image on right shows the inspector 12 meters deep under the 3 rd crusher in making the retrieval extremely difficult if needed to be performed.

Future Developments  The team has begun work to setup a pivot control system on the camera. This will allow them to drive the unit to a specific location then use the camera controls to look around adding even more flexibility and investigative power to the system.

Benefit Analysis  After implementing the autonomous inspection unit for screen inspections the maintenance team have; -Eliminated the risk of working in a confined space -Eliminated the risk of manual handling and moving -Reduced inspection time by 1 hour -Reduce documentation preparation (SWMS, High risk permits) -Accurate and detailed inspection records  Using the autonomous inspection unit ; Screen inspection time is now 1.5hours and 1 person compared to 2.5 hours with 2 people. Screen inspection hours have now gone from 36hours down to 18hours per month reducing the hours checking the screens by 50% and taking the manual labour strain off the operator. The unit also gives a clear visual record for some extra advice if the screen cloth needs to be changed or there maybe more life in them. We have been saving around $3500 on cloths a month by maximising their life span.

® Build something great™ (BCM NSW/ACT Country Quarries (North) – Seaham Quarry) Richard Tomkins March 2015