View From CERN Summary of Upgrade Projects:  Phase 1 IR upgrade: construction project  LINAC4: construction project  Phase 2 collimation: design finalization.

Slides:



Advertisements
Similar presentations
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Advertisements

Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
HL-LHC WP2 Brainstorming Meeting 1 Purpose of this meeting:  Introduce the main objectives of the new HL-LHC project: Prepare technical proposal by 2013.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Eric Prebys LARP Program Director Jaunary 14, 2009.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 16, 2010.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
R. Garoby 3/03/2006PAF progress1 PAF Progress 3/03/2006 M. Benedikt, R. Garoby, F. Ruggiero, R. Ostojic, W. Scandale, E. Shaposhnikova, J. Wenninger 
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Update on LHC Upgrade Plans Frank Zimmermann ATLAS Upgrade Week Tuesday 10 November 2009.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Linac4 Status 1 M. Vretenar sLHC public event
LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Thursday 28 January 2010 Session 8 - LHC Upgrade Plans for the first long Shutdown (Convener: Oliver Bruning, Paolo Fessia )
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Eric Prebys LARP Program Director January 14, 2009.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 4, 2011.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
View from CERN CM11 in FNAL; 27. & 28. October 2008 Finalization of existing deliverables :  Installation of LHC luminosity monitors for 2009 run  Prototype.
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Crab Cavities for the HL-LHC Project Definition and Design Study E. Ciapala, E. Jensen, J. Tuckmantel (CERN) R. Calaga (BNL) US-LARP CM15, November 2010,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
Research progress and plan CERN-KEK Committee, 2nd meeting 07/Dec/07 Masamitsu AIBA CERN-Japan fellow, AB/BI.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
R. Ostojic, IRP1 CD Review, 31 July 2008 LHC IR Upgrade Phase I Goals and Constraints 1.Upgrade goals and milestones 2.Upgrade of IR systems: main constraints.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The CERN Linac4 history, performance, perspectives
ICE SECTION The coolest place to be! Elias Métral
WP5 Elliptical cavities
contribution to the round table discussion
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Linac4 M. Vretenar for the Linac4 design team
LHC IR Upgrade Phase-I: Goals and Conceptual Design
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Upgrade Strategy for the Experimental Vacuum Systems
CLIC-ILC BDS & MDI work.
Superbeams with SPL at CERN
Status of the VEPP-2000 Collider Project at Novosibirsk
SLHC-PP kick-off meeting, CERN 9 April 2008
The SPL-based Proton Driver at CERN
LHC Machine Advisory Committee, CERN 12th June 2008
Presentation transcript:

View From CERN Summary of Upgrade Projects:  Phase 1 IR upgrade: construction project  LINAC4: construction project  Phase 2 collimation: design finalization  PS2: conceptual design report  LSPL: conceptual design report  SLHC - Phase II upgrade: conceptual study CM11 in FNAL; 27. & 28. October 2008 Oliver Brüning/CERN AB-ABP 0 Feedback on existing USLARP contributions Comments on and interest in future USLARP - APUL projects

LHC Upgrade Plans and New Initiatives LHC Phase 1 Insertion Upgrade: lead by Ranko Ostojic  Project start: 2008  Conceptual Design Report: November 2008  Technical Design Report: Summer 2009  Magnet models: Fall 2009  Pre Series Quadrupoles 2010  String test 2012 to 2013  Installation in shutdown  Commissioning during 2014 run Oliver Brüning/CERN AB-ABP 1 CM12 in Napa; April 2009

Phase 1 IR Upgrade Constraints Interfaces with the experiments: Very tight interfaces between the triplet, TAS, shielding, vacuum and survey equipment, and beam instrumentation; no possibility of reducing L* (23m). Cryogenics: Ultimate cooling capacity is 500 in each triplet. Replacement of triplets in IR1/5 requires at present warm- up of 4 sectors. Chromatic aberrations: Reduction of  * drives chromatic aberrations all around the LHC. A new optics solution for all arcs and insertions is necessary. Accessibility and maintenance: Severe space constraints around IP1 and IP5 for any new equipment. New magnets must be similar in size to the LHC main dipole. Upgrade implementation: during the extended shutdown, compatible with CERN-wide planning (Linac4 commissioning, phase-I upgrade of the experiments). CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 2 Courtesy of Ranko Ostojic

LHC IR Upgrade Phase I CERN SLHC-PP (CEA, CIEMAT, CNRS, STFC) Special French contribution (CEA, CNRS) US-APUL (BNL, Fermilab) D1 separation dipole Cold powering Quadrupole components Cryostat components Production of the correctors Design and construction of the model quadrupole Design of the correctors Design of the cryostats Quadrupole production Cryostating and testing Power converters Protection String test Integration Phase 1 Collaborations CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 3 Courtesy of Ranko Ostojic

Goals for the LHC Phase 2 IR Upgrade Phase II Identify new IR layouts and magnet technologies that allow a ten fold increase in the nominal LHC luminosity (and radiation):  Prepare a solution that can withstand the radiation for operation with L = cm -2 sec -1  The Phase II upgrade should be implemented once the Phase I solution reaches the end of the magnet lifetime (700 fb -1 )  After 4 to 5 years of the Phase I upgrade operation assuming the Phase I operation reaches L = cm -2 sec -1  Earliest installation by 2018  requires substantial R&D  There are currently 2 options under study:  25 ns option using integrated ‘slim magnets’ inside the detectors and CRAB cavities  50 ns option using above ‘ultimate’ beam intensities Oliver Brüning/CERN AB-ABP 4 CM12 in Napa; April 2009

LHC Upgrade Plans and New Initiatives CERN New Initiatives LHC collimation:  Phase 2 collimation project lead by Ralph Assmann review by 2009 (cryo collimators) with final decision once operational experience becomes available from LHC LHC injector complex:  LINAC4 project lead by Maurizio Vretenar approved construction project (construction started in 2009) with connection to PSB by 2013 with operation in 2014  PS2 design study lead by Michael Benedikt  LSPL design study lead by Roland Garoby  SPS upgrade study team lead by Elena Shaposhnikova Oliver Brüning/CERN AB-ABP 5 CM12 in Napa; April 2009

Status of Linac4 collaborations H - source RFQ DTL 45 keV 3 MeV 50 MeV 90 MeV 160 MeV chopper line CCDTL PIMS transfer line to PSB LEBT 352 MHz 704 MHz 80 m COMPLETED Discussions with Saudi Arabia (DTL tanks) and ESS-Bilbao (drift tubes) French contribution: RFQ design and test, RF amplifiers, modulators - being signed US contribution: Laser Profile monitor (+ extension ?), under discussion CANCELLED ISTC Project (Russia) for CCDTL approved PIMS as in-kind contribution from Poland still unclear ? Transfer line vacuum chambers and supports from Pakistan Tuners, couplers, waveguides from India, under discussion CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 6 Courtesy of Maurizio Vretenar

A bright point: civil engineering is progressing ! days delay due to bad weather conditions CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 7 Courtesy of Maurizio Vretenar

General Comment on USLARP Collaboration Finalization of existing deliverables has high priority:  Installation of LHC luminosity monitors for 2009 run  Prototype of rotatable collimators  Nb 3 Sn magnet R&D with long prototype by 2010 Success of the above deliverables is vital for successful launch of new production projects! Oliver Brüning/CERN AB-ABP 8 CM12 in Napa; April 2009 General Comment on New initiatives at CERN:  Studies at CERN lack resources and offer interesting areas for US contributions  Help is desired in form of studies (USLARP) and hardware production and prototyping (APUL)

CERN Point of View on FY 2009 Activities CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 9 Feedback on current ‘Accelerator Systems’ activities:  Instrumentation:-Luminosity monitor -AC dipole -LLRF  Collimation: -Rotatable collimators -Crystal studies  Accelerator Physics studies: -e-cloud -beam-beam -PS2 studies -CRAB cavities

CERN Feedback on FY 2009 Activities CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 10 Instrumentation:  Luminosity monitor: -Installation now complete and in time for 2009 startup! -Still needs to be extended to 40 MHz operation! -Software: low level done at CERN but who is looking after application software and commissioning?  LTV?  AC dipole: -Interface not clearly defined?  LLRF: -no longer requested for LINAC4 (only LHC: Loop setup) -there is also a European collaboration within FP7 (FLASH & Poland)

CERN Feedback on FY 2009 Activities CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 11 Collimation:  Rotatable collimators and Crystal studies: -another example of very good collaboration! -Roman pot installation for SPS MDs incomplete in 2009  still needs follow-up in 2010 Accelerator Physics Studies:  e-cloud: -wide band feedback system could cure instability -proposal for using more simplified code to perform more detailed feedback simulations (combine with TMCI) -CERN is not interested in new code development and bench marking! (Use of existing tools and application!) -interested in SPS simulation at various energies

CERN Feedback on FY 2009 Activities CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 12 Accelerator Physics Studies:  beam-beam: -interface definition with CERN could be improved -CERN is interested in more experimental studies (e.g. wire compensation experiments at RHIC) -CERN is interested in better theoretical understanding of experimental data (e.g. e-lens experiments at FNAL) -CERN is interested in new studies tailored to the new IR configuration of the Phase 1 IR upgrade

CERN Feedback on FY 2009 Activities CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 13 Accelerator Physics Studies:  PS2 studies: -great success of incorporation at CM10! -PS2 optics and lattice progressed a lot thanks to USLARP  CRAB Cavities: -great potential for Phase 2 upgrade -limitations in KEK operation now understood -still requires extensive R&D for application in Hadron machine -prototyping and testing for application in LHC are not straight forward to plan

CERN Wish List for Activities Beyond 2009 CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 14 LHC:  Hollow electron beam lens: -could be an interesting option for Phase II collimation -outstanding R&D issues could be USLARP contribution -production could be part of existing APUL package  Beam-beam compensation: -interest in more experimental studies on wire compensation (experiments in RHIC) -more studies related to electron-lens compensation (better understanding of the Tevatron observations) -construction for LHC could be a future APUL package

CERN Wish List for Activities Beyond 2009 CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 15 LHC:  CRAB cavities -currently studying options for installing prototype in LHC -work supported by a fellow under FP7 Eucard program -preparation of detailed test program and beam parameters with clear test objectives (currently being prepared by Rama Calaga from BNL) -CERN launched an impact study group (lead by Joachim Tuckmantel from the BE-RF group) to evaluate impact of tests on normal machine operation -requires more support from USLARP and other major partners to finance the required R&D development

CERN Wish List for Activities Beyond 2009 CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 16 LHC:  Beam instrumentation -radiation hard image sensors (cameras & photomultipliers) for equipment monitoring and data recording (e.g. synchrotron light monitor) -could be part of future APUL program  Collimation -Production of Phase 2 collimators could be part of a future APUL program

CERN Wish List for Activities Beyond 2009 CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 17 PS2:  major achievement to include PS2 in USLARP activities -baseline lattice and optics have well advanced thanks to USLARP contributions!  still need key support in major areas: -comparative studies on layout with different super- symmetries -correction systems (linear & non-linear) -collective effects & feedback -collimation system -40 MHz tuneable RF system (e.g. impedance) -could benefit from USLARP studies and LTVs

CERN Wish List for Activities Beyond 2009 CM12 in Napa; April 2009 Oliver Brüning/CERN AB-ABP 18 LINAC4 and SPL:  Beam instrumentation -H - emittance measurement using H - laser profile monitor -studies could be part of future USLARP activity -upgrade could be part of future APUL program  Beam Dynamics -SPL project would be interested in beam dynamics studies (e.g. using IMPACT)

General Questions Option of future APUL projects:  CERN would be very interested in additional APUL projects in the future (e.g. Phase 2 Collimation)  Time scale? -when could future APUL projects be launched? (feedback from current APUL project not before 2011) Oliver Brüning/CERN BE-ABP 19 CM12 in Napa; April 2009