Acquisition system for the CLIC Module. Sébastien Vilalte.

Slides:



Advertisements
Similar presentations
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Advertisements

26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
E-link IP for FE ASICs VFAT3/GdSP ASIC design meeting 19/07/2011.
LAPP electronics developments Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC WS 12-16/10/2009.
ESODAC Study for a new ESO Detector Array Controller.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Development of an ATCA IPMI Controller Mezzanine Board to be used in the ATCA developments for the ATLAS Liquid Argon upgrade Nicolas Dumont Dayot, LAPP.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
R&D on pixel sensors at ILC ILC Workshop - November 2006 – Valencia.
SPS Beam Position Monitors: MOPOS Front-End Electronics Jose Luis Gonzalez BE/BI 22/11/2013.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Pierpaolo Valerio.  CLICpix is a hybrid pixel detector to be used as the CLIC vertex detector  Main features: ◦ small pixel pitch (25 μm), ◦ Simultaneous.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
GBT Interface Card for a Linux Computer Carson Teale 1.
Filip Tavernier Karolina Poltorak Sandro Bonacini Paulo Moreira
NEDA collaboration meeting at IFIC Valencia, 3rd-5th November 2010 M. Tripon EXOGAM2 project Digital instrumentation of the EXOGAM detector EXOGAM2 - Overview.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
Evaluation of the Optical Link Card for the Phase II Upgrade of TileCal Detector F. Carrió 1, V. Castillo 2, A. Ferrer 2, V. González 1, E. Higón 2, C.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
The GBT, a Proposed Architecture for Multi-Gb/s Data Transmission in High Energy Physics P. Moreira CERN – Geneva, Switzerland Topic Workshop on Electronics.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
Beam diagnostics developments at LAPP: Digital part CTF3 Collaboration Meeting Louis Bellier, Richard Hermel, Yannis Karyotakis, Jean Tassan,
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
High Speed Digital Systems Lab Spring/Winter 2010 Project definition Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of an A/D.
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
GBT-FPGA Interface Carson Teale. GBT New radiation tolerant ASIC for bidirectional 4.8 Gb/s optical links to replace current timing, trigger, and control.
BPM stripline acquisition in CLEX Sébastien Vilalte.
16 February 2011Ian Brawn1 The High Speed Demonstrator and Slice Demonstrator Programme The Proposed High-Speed Demonstrator –Overview –Design Methodology.
LAPP BI Read-out electronics Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC BI WS 02-03/06/2009.
R2E Availability October 17 th 2014 ADC and Common development options G. Spiezia.
Standard electronics for CLIC module. Sébastien Vilalte CTC
ROM. ROM functionalities. ROM boards has to provide data format conversion. – Event fragments, from the FE electronics, enter the ROM as serial data stream;
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź, DMCS ATCA LLRF project review, DESY, 3-4.
The Data Handling Hybrid
Next generation rad-hard links
PANDA collaboration meeting FEE session
LAPP BPM Read-out Electronics
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
MicroTCA Common Platform For CMS Working Group
GBT-FPGA Interface Carson Teale.
Front-end digital Status
Front-end electronic system for large area photomultipliers readout
Breakout Session SC3 – Undulator
Presentation transcript:

Acquisition system for the CLIC Module. Sébastien Vilalte

LCWS Sébastien VILALTE A large number of modules have to be acquired between the rare accesses from the surface (~900m). With a large number of channels, the CLIC module needs a local acquisition the closest as possible to the module. The module is a construction “brick” and its number of signals can fit a crate acquisition. The acquisition crate should be a part of the module, one crate for each module. Because of specific signals processing, power consumption and costs, the acquisition electronics should be « custom ». In an other hand, It must support several sub-systems acquisitions developed by several teams and which can evolve: standardized connectivity & protocol. General specifications of a local acquisition system 2

Since 2008 we work on the CLIC module acquisition in collaboration with CERN (Lars Soby). → about 100 signals to be acquired every 2m for the 7 sub-systems. Most versatile solution: industrial crate with 1 service board: autonomous 12VDC power supplies performed from 230VAC line, network access and distribution on back-plane. Several standard instrumentation boards: simple architecture based on FPGA and mezzanines: different mezzanines developed for the different subsystems with a standard interface (FPGA high speed connectors). General specifications of a local acquisition system LCWS Sébastien VILALTE 3

Network: has to guarantee the distribution of the timings; machine clock, synchronous in some cases; data transmission on long distances, an high speed data rate; radiation hardness… Every crate linked point-to-point to the surface: → limits hardware hard to access, no intermediate stage, isolates the crate if problem, better reliability. Link: Long distances, data rates, EMC and radiation environment: best choice is an optical link between crate and surface. Data collection: A the surface, a PCIe board should collect data. → possible high data rates. → compatible with off-the-shell devices connected to the Control network. Architecture: network LCWS Sébastien VILALTE 4

Network: synchronous fiber optic network with a controlled frequency: GBT → high speed network developed by CERN microelectronics department for data acquisition, timing, trigger and experiment control. (cf. Features: → 4.8Gb/s optical link. → up to 40 local chip-to-chip links, ser-des (data concentration). → Radhard design (~100Mrad, 1.E15 n/cm²). → multiple synchronous clocks management. → final version will include SCA slow control features (ADCs, DACs, JTAG, I2C, SPI, alarm monitoring…)very useful for the crate monitoring. → HDL code developed for FPGA interfacing in the GBT collaboration. → future LHC front-end standard network. Each part of the GBT already tested with success (transceiver, SERDES, laser driver…). Architecture: network LCWS Sébastien VILALTE 5

- Front part of GBT distribution (e-link) in backplane. - Two mezzanines / motherboard: best compromise between standard board sizes and possible front-panel connections. Architecture: local crate LCWS Sébastien VILALTE 6

Standard instrumentation motherboard: A single FPGA (Altera ARRIA II) performs: → interface with the GBT e-link via the backplane. → interface with mezzanines dedicated to the different applications. → possible implementation of a dedicated code for sub-systems applications: processing, feedback controls (attenuators, calibrations…). Use of very high speed Samtec HSMC connectors for mezzanines-motherboards links: → 8 transceivers links up to 8,5Gbps. → 17 LVDS Tx, 17 LVDS Rx 1,2GBps. → 3 reserved links for clocks. A motherboard with high speed mezzanines links will keep high performance in the future: → will allow upgrades for sub-systems mezzanines or future local applications developments with a standard connectivity. i.e. future high speed ADCs with serial high speed links (transceivers)… Architecture: local crate LCWS Sébastien VILALTE 7

Main issue for local acquisition: Radiations. T otal dose 15kGy=1,5Mrad? for 15 years (simulations) + neutron fluence(?). Radiation on FPGA: Specific FPGA Rad-hard technologies impossible to get (military) or Rad-tol industrial not adapted for this application (number of cells, Rad-tol, speed…). Technology and several techniques allow to limit radiation effects on industrial FPGAs: → small technologies are more resistant to TID and leakage currents anneal total dose effects. TID should be no more a problem for techno<90nm. SEL are limited by the size of the pnpn thyristor structure. Currently 40nm, next 28nm. → triple modular redundancy code techniques fix the problems of non-destructive SEU. → a final hardcopy version could improve the problems due to RAM susceptibility to neutron fluence: possible if no reconfigurable processing is performed in the FPGA. → shielding to be studied. → a lot of information with the working group in CERN (Jorgen Christiansen Architecture: local crate LCWS Sébastien VILALTE 8

Main issue for local acquisition : Radiations. Radiation on analog parts and ADCs: → amplifiers, ADCs: not qualified but selected by experience and known to be much more resistant. → power supplies: CERN microelectronics group develops Rad-hard DC-DC converters. ~300MRad, 5.E15n/cm². All parts should be qualified. Architecture: local crate LCWS Sébastien VILALTE 9

Second issue: power consumption. Low available power consumption for the whole crate: 30W(?). → power supplies must be switched off between two acquisition. Not obvious for digital. Also to be defined in the future with the collaboration: Mechanical crate standard: industrial, custom… and back-plane. And with CERN Control: Network protocol. Final collection of a section: server, stand-alone system, etc… Architecture: local crate LCWS Sébastien VILALTE 10

Before crate prototyping, the development of an evaluation board to test architectures, GBT, mezzanine boards: Emulation of a crate with two instrumentation boards / emulation of four crates. Future platform for developments and tests of mezzanines for applications. A first step: Evaluation Board LCWS Sébastien VILALTE 11

A first step: Evaluation Board LCWS Sébastien VILALTE Results: HSMC connector tested with success beyond the specs (up to 10Gbps). All links between FPGAs OK. Clock management and synchronization OK on board. Clock management and synchronization OK between board and PCI via optical link. GBT not yet tested. Produced beginning x240mm Hitachi FX-II 60µm class 18 layers 2000 components 900 differential pairs 1,2Gb/s 56 transceiver pairs 8,5Gbps 4 SFP 8,5Gb/s 3 FPGAs 1700 pins 4 USB links 4 mezzanines 12

In parallel of evaluation board: development of a mezzanine for DB stripline BPM in collaboration with CERN (Lars Soby, Alfonso Benot Morell). Development of a generic acquisition mezzanine board: Allows to test amplifiers and ADC chosen for the stripline BPM acquisition. Can be useful for all around acquisitions. Can be used to test first shaping circuits for BPMs or other sub-systems. BPMs need 4 channels: quad ADCs are welcome. → limit the dispersion (CMRR, synchronization…), even if we calibrate. → reduce numbers of signals: clocks, controls, power supplies… → reduce power consumption. Mezzanine developments LCWS Sébastien VILALTE 13

Drive Beam Stripline BPM mezzanine: Specifications and study by Steve Smith (SLAC) and CERN. resolution 2µm, accuracy 20µm, time resolution<10ns. Acquisition in baseband: 4-35MHz. → shaping with input filters. → needs high dynamic range acquisition: 75dB SNR, at least 100Msps. → needs multi-gain/attenuation to reach resolution both in single pulse and train configurations. → needs accurate calibration. Currently several designs studied by CERN (Alfonso) and LAPP. Prototypes will be produced, tested and compared soon (end 2011). Beam tests foreseen next year in CTF3 DB & MB. Signal processing to develop to reconstruct the beam shape. Mezzanine developments LCWS Sébastien VILALTE 14

Generic acquisition board: Produced last spring. → 2 synchronous quad ADCs (Linear tech LTC2174); 11,8 enob; up to 125Msps; serial outputs. → 8 channels. → possibility to implement gain (18dB) and switchable attenuator (-26dB). → jitter cleaner 300fs. → BW=50MHz. Mezzanine developments LCWS Sébastien VILALTE 110x80mm 120 µm class 6 layers 15

Mezzanine developments Results: ADC: SNR=72dB, SINAD=71,2 so 11,5 Amplifier OK. HSMC connector OK. Jitter cleaning and channels synchronization OK. LCWS Sébastien VILALTE 16

Surface data collection: X8 PCIe board. PCIe board already designed to recover the evaluation board data (produced spring 2011): → X8 Gen2 for high speed standard interface. → 4 SFP+ optical links so recovers 4 crates. → 2 MCX inputs for external trigger and clock: if external synchronization needed. → 2 HSMC connectors allowing local mezzanine (i.e. generic acquisition…). → 1 USB link for tests and stand alone use. X8 Not necessary in the future but allows to test the system at its maximum. Number of PCIe lines will be determined by the final needed rate; depends on subsystems. Surface data recovering. LCWS Sébastien VILALTE 17

Results: All links tested up to 8,5Gbps. ADC synchronization tested with success. Works well currently with USB, PCIe IP to be implemented (end 2011). Surface data recovering. LCWS Sébastien VILALTE 18

Possible global architecture LCWS Sébastien VILALTE 19 Crate 1Crate 3Crate 2Crate 4 Crate n PCIe 1PCIe n GBT links Surface Device 1 PCIe 2 Device n 230VAC line NETWORK Tunnel Possible timings

Evaluation board: good results. Next step: implementation of GBT protocol in FPGAs, tests of back-plane GBT e-links. Will allow to test mezzanines with BPMs or others sub-systems developments. Sub-systems developers are welcome to discuss! Crate & motherboards: choice of the crate to be done, development of the service board. First prototypes Mezzanines for BPM: production and tests next months, tests in CTF3. Documentation to be done for developers, especially mezzanine connection features. In the future, ADCs sampling rates and dynamics will increase, architecture with mezzanines will allow to upgrade systems. LAPP funding: manpower 2,5FTE, ~15k€/year. Conclusion, milestones LCWS Sébastien VILALTE 20