Platform for the implementation of NAIADES River Information Services in Europe – results of a survey Andreas Bäck Deputy Project Coordinator of PLATINA.

Slides:



Advertisements
Similar presentations
Transport TEN-T Info Day Brussels 29 November 2012 RIS - Inland Waterways.
Advertisements

RIS Directive October 11 th 2007 Annick Javor RIS Directive River Information Services.
Christoph Amlacher October 17, 2007 E-Navigation Conference, Oslo Evolution of Positioning Services for Inland Waterways.
Platform for the implementation of NAIADES European support for modernising the inland fleet by PLATINA Michael Fastenbauer Deputy Chairman PLATINA Management.
Michael Fastenbauer March 21, 2007 M-TRADE Final Conference, Tecnopolo Tiburtino, Rome (IT) Integration of River Information Services in Multimodal Information.
IRIS Master Plan IRIS Master Plan Workshop Bulgaria 5th of May 2005 Dieter Hintenaus.
National status and activity report Romania Belgrad, December, 2012.
River Information Services in Inland Navigation and COMPRIS Cas Willems AVV Transport Research Centre The Netherlands.
RIS Implementation survey and policy evaluation RIS workshop Italy October 2012 Sandra van Putten/Panteia-NEA.
Project presentation. Network of Danube Waterway Administrations – data and user orientation SVP via donau OVFRSOE AVP Plovput ACN EAEMDR AFDJ Photo credits:
EU Strategy for the Danube Region Priority Area 1a – To improve mobility and multimodality: Inland waterways Ministerul Transporturilor si Infrastructurii.
Dr. Michael Fastenbauer Mantova, RIS in Austria.
National Status and Activity Report Republic of Serbia Zoran Lukic / Plovput DISC 12, Vukovar, 13/12/2012.
COMPRIS Demonstration Slovakia – Cross-Border electronic reporting in the Danube regionpage: 1 Cross-border electronic reporting in the Danube region Mario.
Platform for the implementation of NAIADES 
River Information Services and COMPRIS The last step towards the pan-European implementation of RIS Cas Willems Project manager COMPRIS.
National status and activity report Romania Vukovar, December, 2012.
Future of RIS Róbert Rafael Director for Projects and Development RSOE Budapest, 11 th April 2011.
Ir. Johan Raes – Ing. Rob Scipio – Ir. Dierik Vermeir 17/11/2010, Budapest Implementation of RIS on the Scheldt River 2008-EU P.
- Donaukommission Budapest in SIGHT in - innovative navigation GmbH Current Inland ECDIS applications Dr.-Ing. Martin Sandler in – innovative.
Current state of play in the NtS Expert Group Danube Commission RIS Workshop Budapest 11 th April 2011.
Periskal at a glance Software company, head office Belgium, sister companies in Serbia, Rumania and Ukraine Since 1990, focus on Inland ECDIS systems.
Platform for the implementation of NAIADES 
Inland ECDIS standard 2.3 UNECE June 16, Content ienc.openecdis.org2www.ris.eu Inland ECDIS expert group and Inland ENC Harmonization Group (IEHG)
“SAFETY THROUGH QUALITY” Vessel Traffic Management and Information System on Romanian Danube ( Ro – RIS )
Platform for the implementation of NAIADES The EU’s PLATINA project and its implications for the Danube basin Gert-Jan Muilerman PLATINA project coordinator.
Status of RIS in the Czech Republic
River information service of Ukraine. Main objectives of RIS of Ukraine 0enhance inland navigation safety levels, 0increase efficiency of transportation.
The work of the expert group Peter Stuurman chairman ad interim Saturday, 09 April 2011.
Edition 3 of The PIANC RIS guidelines Cas Willems (Chairman PIANC WG 125),
1 INDRIS Inland Navigation Demonstrator for River Information Services Cas Willems Transport Research Centre Ministry of Transport The Netherlands.
DISC 2012 Vukovar. Overview Introduction of Periskal Recent Realisations Possibilities and use of ATON /AIS on Inland waters.
RISING project and services RIS Workshop (Danube Commission) 11/04/2011, Budapest/ HU Gerhard Schilk (via donau)
1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.
National Status and Activity Report Republic of Serbia Zoran Lukic / Plovput DISC 13, Belgrade, 03/12/2013.
1 IRIS Europe 3 – Implementation of River Information Services in Europe The European Union's TEN-T programme supporting …
WANDA - project overview and status Dr. Harald Beutl via donau – Österreichische Wasserstraßen-Gesellschaft mbH Budapest, Projektstatus “WANDA”
Selected Activities of the Sava Commission DANUBE INFORMATION SERVICES CONFERENCE – DISC, Belgrade, 3rd-4th December, 2013.
Current status of RIS in Croatia Danube Summit May/June 2010.
Status report Slovakia
. Italian RIS TEN-T Project Coordination of Ports and Inland navigation Bodies of Northern Italy PLATINA - RIS COMMON ISSUES Budapest, November 17 th 2010.
River information services in Croatia Silvio Ridzak DISC ´13 Belgrade,
Status quo in Austria Barbara Kéri DISC´13 Belgrade December 3, 2013.
Status of Inland ECDIS RIS workshop Danube Commission April 14, 2011.
National Association of Radio Distress-Signalling and Infocommunications Public Information Services in Hungary – Co-operation of Governmental Organizations.
RIS Index – a tool for interoperable RIS services Róbert Rafael
Platform for the implementation of NAIADES State of Play of RIS in Europe RIS Workshop of the Danube Commission Budapest, 11th of April 2011 Andreas Bäck.
Practical experiences with RIS-based lock management from the users' perspective Juergen Troegl via donau Austria.
RSOE Status Report Hungary Belgrade, Roles of RSOE in IWT projects ProjectRSOE role WP5 Leader, Partner Communication Leader, Partner SuAc.
EC Working Group on Rivers 19 th of February 2009 Inland waterways transport on the river Danube.
River information services in Croatia Krunoslav Sopček DISC ´12 Vukovar,
RIS Lock Management System Damir Obad (RGO Communications Ltd.) DISC Beograd
Danube navigation possibilities, overview of Hungarian relevant projects and initiatives Gergely Mező Head of Project Management NATIONAL ASSOCIATION OF.
Platform for the implementation of NAIADES RIS SUPPORT Roeland van Bockel/Nora Schmorak e.o. RIS COMMON ISSUES 16 November Venice.
Inland ECDIS: next steps Common Issues Meeting Zagreb.
EDIT validation tool item 8 of the agenda Structural Business Statistics Working Group 14 April 2015, Luxembourg Arlind Dobërdolani.
PIANC RIS Guidelines 2011 Edition 3 Smart Rivers Conference 2011 PIANC RIS working group Cas Willems.
THE DANUBE WATERWAY– Economic Geography from the Presentation Series „Basics of Inland Navigation“
Workshop on Implementation of the Schengen Action Plan in the area of border management and personal data protection INTEGRATED BORDER MANAGEMENT Skopje,
Rainer Strenge Federal Waterways and Shipping Administration, Germany Traffic Technologies Centre Services for Inland Shipping.
RIS best cases Mantua Italy 2012
Status report Slovakia
National RIS related Activities Germany
Electronic Chart System (ECS)
News from the Sava Commission
Update on legal issues Strategic Coordination Group
Update on legal issues Strategic Coordination Group
Update on legal issues Strategic Coordination Group 23 February 2010
Overview of state of play of reporting under Bathing Water Directive
Notices to Skippers Expert Group State of play
Presentation transcript:

platform for the implementation of NAIADES River Information Services in Europe – results of a survey Andreas Bäck Deputy Project Coordinator of PLATINA

2 Introduction  RIS Directive applies to 12+1 countries (RO, BG, HU, SK, PL, CZ, AT, DE, NL, BE, LU, FR and HR (as candidate country))  Objective of activity: Summarize the Status of River Information Services by means of a questionnaire  Questionnaire sent to 13 countries, i.e and Serbia  13 countries responded until –Approx km of Class IV –Approx km of Class Va and higher –Approx vessels

3 Notices to Skippers (NtS)  Provision of Fairway & Traffic, Water Related and Ice Messages –12/2010: 7 fully operational, 2 pilot, 4 in preparation –12/2012: 10 fully operational, 2 pilot, 1 in preparation  Provision of full text message and code format  Notices to Skippers - international data exchange –12/2010: 1 fully operational, 3 pilot, 8 in preparation –12/2012: 9 fully operational, 3 pilot, 1 in preparation  Usage of 3 different versions of XSD

4 Vessel Tracking & Tracing (1/2)  Shore-based infrastructure of Class Va and higher –12/2010: km fully operational, 950 km pilot –12/2012: km fully operational, 550 km pilot –Total length: km  Shore-based infrastructure of Class IV –12/2010: 50 km fully operational, 200 km pilot –12/2012: 500 km fully operational, 200 km pilot –Total length: km  Position information - international data exchange –12/2010: 1 fully operational, 6 pilot, 3 in preparation –12/2012: 5 fully operational, 4 pilot, 1 in preparation

5 Vessel Tracking & Tracing (2/2)  Services of shore-based infrastructure (over Inland AIS) vary between countries  AIS equipment program –12/2010: transponders provided –12/2012: transponders provided –Total approx vessels  AIS operation requirements (usage of a Inland AIS transponder - if on board): 4 in force, 4 planned  AIS carriage requirements (carriage and operation of Inland AIS transponder): 1 in force, 5 planned

6 Electronic Reporting  Reporting of ERINOT message –12/2010: 2 fully operational, 3 pilot, 6 in preparation –12/2012: 5 fully operational, 6 pilot  BERMAN and PAXLIST Message implemented in the Netherlands and Croatia  ERINOT - international data exchange –12/2010: 3 fully operational, 1 pilot, 7 in preparation –12/2012: 3 fully operational, 8 pilot, 1 in preparation  Reporting requirement: 2 in force, 2 planned

7 Electronic Navigational Charts (1/2)  Electronic Navigational Charts of Class Va and higher –12/2010: km fully operational, 400 km pilot –12/2012: km fully operational, 400 km pilot –Total length: km  Electronic Navigational Charts of Class IV  12/2010: km fully operational  12/2012: km fully operational  Total length: km

8 Electronic Navigational Charts (2/2)  Actual depth data for critical stretches (e.g. free flowing sections) provided only in 3 countries  ENC available free of charge: 12/2011  10 free availability, 1 in preparation  Usage of 4 different versions of the standard

9 Hull Data Processing  National Hull Databases –12/2010: 6 fully operational, 4 in preparation, 1 not planned –12/2012: 8 fully operational, 3 pilot  Exchange of information with European Hull Database –12/2010: 3 pilot, 5 preparation, 3 not planned (partly depending on amendment of 2006/76/EC) –12/2012: 7 fully operational, 2 pilot, 2 not planned (partly depending on amendment of 2006/76/EC)

10 RIS Index  Object of highest and high priority are not prepared in a harmonized way  Use of RIS Index for VTT, ERI and NtS not yet in all countries  Exchange with RIS Data Reference Management System –12/2010: 6 in preparation, 2 not planned –12/2012: 5 fully operational, 1 pilot, 2 in preparation

11 On board equipment According to information from expert groups, RIS equipment is estimated on board of vessels:  Inland ECDIS Viewers  Electronic Reporting  98% of the container vessels are reporting electronically  30% of the tanker vessel  5% of the dry cargo.  Inland AIS transponders (see before)  Total approx vessels

12 Thank you for your attention! Andreas Bäck via donau – Österreichische Wasserstraßen-Gesellschaft mbH PLATINA Project Office Brussels