GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov 2004 1 GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.

Slides:



Advertisements
Similar presentations
GLAST LAT Project ISOC 5/17/2004 – Seth Digel1 ISOC Lessons Learned RFA09 Issue –No writeup on lessons learned from visits to other instrument/mission.
Advertisements

GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 1 Monthly Mission Review Project Status Overview May 2, 2007 Ken Fouts SLAC.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 71 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Instrument Science.
GLAST LAT ProjectISOC Peer Review March 2, 2004 Document: LAT-PR Section 5 LAT Operations Facility 1 GLAST Large Area Telescope: Section 5: LAT.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectLAT Operations Planning, 23 March GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST Large Area Telescope ISOC Review 15 February 2006 FSW Activities, Organization, and Resource Needs Jana Thayer Stanford Linear Accelerator Center.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT Project ISOC 5/17/2004 – Bill Craig1 ISOC Risk Analysis Process –Discussion with I&T personnel on risks –Internal discussion performed in concert.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project LAT Monthly Apr SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest.
LAT ISOCDOE Status Review, 12 Oct GLAST Large Area Telescope LAT Instrument Science Operations Center Rob Cameron Stanford Linear Accelerator Center.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
1 Universities Space Research Association AAS January 7, 2008 Early Science Workshop Range of E&PO Office Responsibilities Public Affairs (Public Information,
05 December, 2002HDF & HDF-EOS Workshop VI1 SEEDS Standards Process Richard Ullman SEEDS Standards Formulation Team Lead
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
THEMIS FDMO Review Management Topics − 1 October 5, 2004 Management Topics Manfred Bester.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 NRL-SLAC Networking LAT Environmental.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.2 Visualization Tools 1 Gamma-ray Large Area Space Telescope GLAST.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center ISOC Staffing and Costs Rob Cameron Stanford Linear.
GLAST LAT ProjectApril 2005 Project Status Overview May 24, April, 2005 Lowell Klaisner LAT Project Manager Rev. - LAT Project Status Overview Gamma-ray.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Mission Status - S. Ritz 1 GLAST The Gamma-ray Large Area Space Telescope Mission Status DC2 Kickoff 1 March 2006 S. Ritz Gamma-ray Large Area Space Telescope.
GLAST LAT Project SLAC-NRL Data Connection for GLAST Environmental Test 3/15/05 1 GLAST Large Area Telescope: SLAC – NRL Data Connection for the GLAST.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
SPDF Science Advisory Group - September 29-30, 2005 Page 12/24/2016 9:09:48 PM Services of the Space Physics Data Facility (SPDF) / Sun-Earth Connection.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
Monitoring GLAST Operations: Building tracking displays for the LAT Instrument Science Operations Center By Christina Ketchum.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
GLAST LAT ISOCNotes for Italian meeting, 15 december Notes about ISOC and the italian contributions Gamma-ray Large Area Space Telescope.
I&T&C Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope
GLAST Large Area Telescope
March ’05 Face to Face Meeting Introduction
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
LAT Environmental Test Pathfinder F2F NRL-SLAC Networking Update
Presentation transcript:

GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review 3 Nov 2004 Rob Cameron Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov October Activity (1)  Management –Presented ISOC overview to LAT IFC meeting –Provided ISOC plans presentation for DOE mini-review –Provided ISOC overview for LAT All Hands meeting –SLAC “Safety comes first” standdown Core ISOC staff were able to resume LAT project work relatively rapidly  Work on CDR RFAs –RFA#6: “Launch Critical Support Plan” More details learnt about GSFC IONet and CNE networks –RFA#7: “Red/Yellow Limits” Temperatures: red limits at Acceptance Temp, yellow limits 5C inside AT. Will confirm with LAT Systems Eng that LAT thermal model supports these limits. Other limits will be worked with LAT Systems Eng.

GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov October Activity (2)  ISOC Requirements –Participating in moves of FSW requirements to ground elements –Expanding mission planning requirements to capture more details of products and interfaces –Addressing I&T concern about completeness of planned ISOC capabilities. Have reviewed ISOC requirements with I&T online software developers. Will review ISOC requirements with I&T SVAC.  ISOC Architecture –Work continues on ISOC IT security plan and secure network configuration –Met with SCS management to understand SLAC network security and available support for 24/7 ISOC operation

GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov October Activity (3)  Flight Software coordination –ISOC has worked with FSW team to define contents of FSW User Guide –ISOC-FSW TIMs continue: reviewed housekeeping telemetry structure and usage –Addressed ITAR concerns to ensure FSW T&C handbook is compatible with SAI requirements and PDB  Mission Planning –Had presentations on STK and SatTrack –STK cost is $100k-$200k (1 or 2 fixed base or floating licenses) –SatTrack cost is $10k per computer. Used at Berkeley SSL for RHESSI, FAST, WIND and to be used for THEMIS –Use: event prediction, e.g. SAA transits, target visibility, plus graphic display

GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov ISOC Staffing  ISOC –Bryson Lee started as software developer on Nov 1. Will also work –Interviewed 3 candidates for Test Developer position, without success. B. Lee will support test development in the near term.  FSW –Reworking FSW staffing plans with inputs from Gunther Haller –Planning for future redeployment of programmer support to other ISOC needs after FQT  SAS –Search for SAS software infrastructure person started

GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov ISOC Operations Facility  Long-term ISOC facility –2 meetings with Roger Blandford (KIPAC Director) on ISOC use of Kavli building at SLAC. –SLAC Kavli building completion is expected in late 2005 –Discussions have focused on “Light Lab” space, approx sq. ft. for ISOC operations and some office area, plus offices for other ISOC staff and visiting scientists. Space should be available at building completion. –ISOC requirement until Launch + 5 years is used for discussions –Many issues still to be worked: floorplan and build out cost and schedule for lab space –No firm agreement in place yet until more details are known –Short term planning has dependencies on long-term plans

GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov KIPAC

8 ISOC Facility

GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov Plans for November  Start more detailed planning of ISOC participation in LAT I&T activities at SLAC and NRL. –Ensure minimal disturbance of I&T activities, but use the opportunity to exercise ISOC –Mainly telemetry capture and processing –Investigate some limited command/control opportunities –Need FSW on LAT –Next stage: work with GOWG on details of ISOC activities during I&T at SAI  Continued definition and development of ISOC software elements  Continue to work on Kavli building usage for ISOC  Yet more work on ISOC staffing plans and M&S requirements

GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov ISOC Demonstration  As defined in development schedule shown at ISOC CDR, there will be several pre-launch demonstrations of ISOC functions –November 2004 –January 2005 –March 2005 –May 2005 –October 2005 –January 2006  Demos interspersed before and between GRTs  Will be coordinated with Monthly Status review or other events  Presentation material available at ISOC WWW site: