2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
WECC Reliability Management System
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Transmission Planning in the West pocket guide This reference guide is intended to assist individuals new to transmission planning in the Western Interconnection.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Presented to PGDTF February 11, 2015
Public Service Company of New Mexico
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
SPP.org 11. SPP Delivery Point Addition (DPA) Process Effective May 1, 2010.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
The Transmission Imperative November 3, 2011 Jay Caspary.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
RPG Meeting Five Year Plan Extension Brad Schwarz.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Entergy Arkansas, Inc. Transition Plan Technical Conference #2 July 15, 2010.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Overview of WECC and Regulatory Structure
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Base Plan Development Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
EE590 Capacity Planning David Duebner, Expansion Planning October 8, 2008.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
PJM©2015 Updates to PJM Load Forecast Model OPSI Annual Meeting October 12, 2015 Tom Falin Manager – Resource Planning
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
November 12, 2010 Regional Planning Group Long-Term System Assessment Project Update Warren Lasher Manager, Long-Term Planning and Policy Jonathan Rose.
TOP and BA Responsibilities SPP Wind Workshop May 30, 2013.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
1 Entergy Transmission Planning Summit Transmission Planning Process Doug Powell New Orleans, LA July 8, 2004.
Congestion Hedging Process Transmission Planning Summit September 21-22, 2011.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
1.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
1 Entergy Transmission Planning Summit Transmission Planning & Budget Process Doug Powell New Orleans, LA July 10, 2003.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Panhandle Renewable Energy Zone (PREZ) Study
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
PJM ©2007 NERC LTRA Workshop August 16, 2007 Paul McGlynn Manager, Transmission Planning Department.
Generation Interconnection Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Status Update for Reliability/Market Power Mitigation Assessment
ICT System Impact Study Process
Massachusetts Electric Restructuring Roundtable
Rates & Regulatory Updates
Westar Formula Rate and your bill
New England Resource Adequacy
NERC LTRA Workshop August 16, 2007
2018 RTEP Report Key Maps, Tables & Figures
Strategic Plan and Economic Upgrade Process
Presentation transcript:

2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006

2 Overview SPP RTO Expansion Plan Reliability Planning Economic Planning

3 Basic Planning Principles Stakeholder input throughout the process Ensure transmission system reliability through compliance with planning criteria The SPP planning process is an open and participatory process

4 Regional Plan Objectives Focus on reliability needs 1 st, commercial market needs 2 nd Create an effective long-range expansion plan with a comprehensive assessment of mitigation plans to maintain planning standards Evaluate alternatives from all stakeholders

SPP Expansion Plan Basic Principles Stakeholder input throughout the process Ensure transmission system reliability through compliance with planning criteria: NERC, SPP and Transmission Owner The SPP planning process is open and participatory process

6 Major Changes 2006 SPP Expansion Plan 12 month Planning cycle SPP Transmission Projects that had start of construction beyond to 2008 beyond January 1, 2008 were not included in the Expansion Plan load flow model Included 69 kV contingencies More interaction between SPP Aggregate Study group and SPP Planning group The initial Steady State analysis will identify all violations without using operating guides/directives and determine reinforcements for all violations Included 10 year out model Included winter peak model Included additional NERC C and D contingencies Reactive margin/reserve study

month Planning Cycle

8 Additional Projects Rolled Into Expansion Plan OATT TSR Aggregate Study Process Signed Contracts SPP RTO Expansion Plan Generation Interconnect Process GI Study Process Signed IA Attachment AA Review Process Identify facilities to upgrade Letter of authorization to construct Economic/ Requested Upgrade Signed Agreement TSR GIAA Others Letter of authorization to construct

Carl A. Monroe Sr. VP Ops & COO Voice: