Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland 21742 Science Technology.

Slides:



Advertisements
Similar presentations
Eric M. Wetzel Carollo Engineers, Inc. Bentley Be Inspired Awards November 13, 2012.
Advertisements

Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
| Michael Gallagher | Construction Management AE Faculty Consultant: Dr. Riley The Pennsylvania State University AE Senior Thesis Project.
The Pennsylvania State University Department of Architectural Engineering Harrisburg University Academic Center Laurel Heather Warner Construction Management.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Penn State Architectural Engineering Senior Capstone Project Ramy Labna | Construction Option | Advisor: Prof Ray Sowers 2B + G + M + 7 Mansoura Development.
C AMPUS S QUARE H ARRISBURG, P ENNSYLVANIA A NDREW M ARTIN | C ONSTRUCTION M ANAGEMENT | A PRIL 12, 2010.
Kyle Goodyear BAE in Construction Management Pennsylvania State University Senior Thesis Presentation April 12, 2010.
Thesis by: Josh Raphael Architectural Engineering Construction Management Introduction  Personal and Building Intro Building Background  Building Size,
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Fisk Corporate Headquarters Houston, Texas Penn State AE Senior Capstone Project Stephen Blanchard – Construction Management Option Advisor: Dr. John Messner.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
\ Bayhealth Medical Center Expansion Dover, Delaware Introduction Penn State AE Senior Capstone Project Christopher Barron Construction Management CM Advisor.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
University Medical Center of Princeton David Bodnar Construction Management 2010 Senior Thesis.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
Jon Burke 2006 Mechanical Faculty Consultant: Dr. Jelena Srebric An In-depth Look at a Green Roof.
The Apartment Building Rockville, MD Penn State AE Senior Capstone Project Brian Bernens | Construction Option Advisor: Dr. Rob Leicht Courtesy DAVIS.
Architectural Engineering Construction Management Senior Thesis April 11 th, 2011 Consultant: Dr. Riley Architectural Engineering Spring 2011 – Senior.
Greg Blatt Penn State Architectural Engineering Construction Management April 12, 2004.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
DEREK BAUER CONSTRUCTION MANAGEMENT AE SENIOR THESIS 2008 PENN STATE UNIVERSITY AE SENIOR THESIS PRESENTATION APRIL 15, 2008 OFFICE/RETAIL BUILDING WASHINGTON,
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Introduction 120,000 SF 10 Stories (90ft) $40 Million Aug – Dec.2011 Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie.
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Presented by Cameron Mikkelson April 16, 2014 Silverado Senior Living Brookfield, WI Analysis Topics On-site Prefabrication of Interior Wall Panels Installation.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
Goizueta Foundation Center For Research And Doctoral Education Emory University, Atlanta, GA.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
PENN STATE AE SENIOR CAPSTONE PROJECT Adam Lasher │Construction Management Dr. Robert Leicht Susquehanna Health Patient Tower Expansion Williamsport, PA.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
North Hall | American University| Washington D.C.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Redifer Commons Addition & Renovation Project
Grunenwald Science and Technology Building
Introduction James W. & Frances G. McGlothlin Medical Education Center
Wrangle Hill Elementary School New Castle, DE
Ryan Johnson - Structural Option
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Construction Management Option
Wellington Condominiums Project
Coppin State University
RiverView Condominiums II Chicago, IL
Presentation transcript:

Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Science Technology Engineering Mathematics Building STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Southwest ViewSouth ViewSoutheast View 5 Floors Size: 62, 840 SF Cost: $15.6 M Duration: 18 Months

Typical LabTypical Floor PlanEnergy Lab Craig Owsiany Architectural Engineering – Construction Management Science Technology Engineering Mathematics Building STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions

BackgroundSolutionsGoal Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Blasting Non Competent Rock Reduce Cost Impact Maintain Schedule Ensure Structural Integrity Analysis I: Mat Slab Redesign Structural Breadth

Structural AnalysisStructural CalculationsFindings Craig Owsiany Architectural Engineering – Construction Management Analysis I: Mat Slab Redesign Structural Breadth STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Sum Live and Deal Loads Compare Against Design Load Design>Actual=No Redesign Design<Actual=Redesign Required Mat slab designed for 8000 psf Actual Load = 38% of Design Load 10-15% load increase would require further investigation

Cost ImpactSavings Craig Owsiany Architectural Engineering – Construction Management Analysis I: Mat Slab Redesign Structural Breadth STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Total Savings = $16k

Background Redesign Craig Owsiany Architectural Engineering – Construction Management Analysis II: Green Roof Redesign Mechanical Breadth STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Conventional Green Roof 3” Low Profile Architectural Facets Negligible Thermal Value Minimal Educational Value LiveRoof System 6” High Profile Added Thermal Value Higher Educational Value

Conventional Green RoofLiveRoof SystemBenefits Craig Owsiany Architectural Engineering – Construction Management Analysis II: Green Roof Redesign Mechanical Breadth STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Faster Installation Low Maintenance Immediate Vegetation

Cost ImpactPayback Period Craig Owsiany Architectural Engineering – Construction Management Analysis II: Green Roof Redesign Mechanical Breadth STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Payback period is 28.8 years for maintenance cost alone.

Thermal Calculations Craig Owsiany Architectural Engineering – Construction Management Analysis II: Green Roof Redesign Mechanical Breadth STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions

Conventional Green Roof Heat LossCurrent Green Roof Heat LossProposed Green Roof Heat Loss Craig Owsiany Architectural Engineering – Construction Management Analysis II: Green Roof Redesign Mechanical Breadth STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Low Profile Green Roof Concrete Pavers Wood Pavers Stone Aggregate 100% LiveRoof System High Profile 8.2% reduction from conventional roof 5.0% reduction from current green roof

JustificationEducational Factor Craig Owsiany Architectural Engineering – Construction Management Analysis II: Green Roof Redesign Mechanical Breadth STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Alternate Energy Program Mechanical Engineering Thermal Cameras Heat Sensors

BackgroundRedesignGoal Craig Owsiany Architectural Engineering – Construction Management Analysis III: Curtain Wall Redesign STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Stick Built Curtain Wall Approximately 1/3 of Building Envelope 9260 SF Lengthy Installation Time Site Congestion Short Lead Time Unitized Curtain Wall System Short Installation Time Shakeout Not Required Higher Quality Seals Long Lead Time Reduce curtain wall installation time Achieve earlier water tight date Reduce over all schedule

ScheduleSchedule Acceleration Craig Owsiany Architectural Engineering – Construction Management Analysis III: Curtain Wall Redesign STEM Building Hagerstown Community College Hagerstown, Maryland Original Duration: 40 Days Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions New Duration: 20 Days Stick Built System 1.Deliver Materials 2.Shakeout 3.Install Sills and Jambs 4.Install Mullions 5.Glaze 6.Caulk Unitized System 1.Deliver Modules 2.Set Module 3.Caulk

Lead TimeInstallation Time Craig Owsiany Architectural Engineering – Construction Management Analysis III: Curtain Wall Redesign STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions WeekStick Built SystemUnitized System 1-6Obtain materials 7Fabricate/Deliver Fabricate/Deliver WeekStick Built SystemUnitized System 1Deliver/FrameDeliver/Install/Caulk 2Deliver/Frame/DimensionDeliver/Install/Caulk 3Deliver/Frame/DimensionDeliver/Install/Caulk 4Deliver/Frame/Dimension/Glaze/CaulkDeliver/Install/Caulk 5Deliver/Frame/Dimension/Glaze/Caulk 6 7Glaze/Caulk 8 Stick Built: 8 Weeks Unitized: 12 Weeks Stick Built: 8 Weeks Unitized: 4 Weeks

Sequencing – Areas of ConcernResequencing Craig Owsiany Architectural Engineering – Construction Management Analysis III: Curtain Wall Redesign STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Reduced Curtain Wall Installation Earlier Water Tight Date Finishes MEP Rough Ins Begin MEP rough ins 1 week early. Stack MEP rough ins and finishes on 3 rd, 4 th and 5 th floors. Sync water tight date and completion of rough ins.

Accelerated Schedule Craig Owsiany Architectural Engineering – Construction Management Analysis III: Curtain Wall Redesign STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Overall schedule reduced by 44 days

Analysis IAnalysis IIAnalysis III Craig Owsiany Architectural Engineering – Construction Management Analysis III: Curtain Wall Redesign STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Lessons Learned o Acknowledgments o Questions Mat Slab Redesign Current mat slab will support additional load Redesign not required Further attention given at a 10-15% load increase Green Roof Redesign Cannot place an R-Value on living organisms Using an R-Value alone will not produce accurate heat transfer results Offers great value as an education tool Curtain Wall Redesign 44 days saved Higher quality product Resequencing, not accelerating the schedule “We are sequencing trades in a manner to optimize productivity for all trades involved.”

Acknowledgements Craig Owsiany Architectural Engineering – Construction Management Analysis III: Curtain Wall Redesign STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions General Contractor Greg Ramirez, Senior Project Manager Eric Osborne, Senior Superintendent Brett Robinson, Field Engineer Owner Dawn Baker, Facilities Project Coordinator Robert Spong, Facilities Management and Planning Director Gerard Rath, Owner Rep. Architect Mark Merolla, Architect Structural Engineer Chris Johnson, Structural Engineer Penn State AE Faculty Bob Holland Rob Leicht

Questions Craig Owsiany Architectural Engineering – Construction Management Analysis III: Curtain Wall Redesign STEM Building Hagerstown Community College Hagerstown, Maryland Outline o Overview o Analysis I: Mat Slab Redesign o Analysis II: Green Roof Redesign o Analysis III: Curtain Wall Redesign o Conclusion/Findings o Acknowledgments o Questions Questions?