Project Human Resource Management. Presentation Team 1)Mrs. Mardia Ibrahim Osman(Mechanical Engineer) 2)Mr. Elsaeed Osman Elsheikh(Medical Doctor) 3)Mr.

Slides:



Advertisements
Similar presentations
Project Human Resource Management
Advertisements

1 XAC08-6 Professional Project Management Semester 2, MilkMilk XAC08-6 Professional Project Management This Lecture: You, Me and Others Human.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Human Resources Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
Software Engineering Project Management Presented by James Roberts EEL6883 Spring ‘07.
Planning. SDLC Planning Analysis Design Implementation.
MANAGEMENT ROLES and SKILLS. 2 Define “role” A role is a set of behaviours associated with a particular job.
Other Planning Processes: Final Planning Touches
Project Management – The Project Charter
PMBOK Chapter 9 Project Human Resource Management And Case Study
BSBPMG506A Manage Project Human Resources 9.2 Acquire Project Team The process of confirming human resource availability and selecting the team members.
Project Management – PMBOK®
Certificate IV in Project Management Project Management Environment Course Number Qualification Code BSB41507.
Degree and Graduation Seminar Project Management Processes
BSBPMG506A Manage Project Human Resources 9.1 Develop Human Resource Plan The process of identifying and documenting project roles, responsibilities, required.
Human Resources Management Course Objectives The purpose of this course is to learn the Project Management Institute (PMI) processes required to make.
Human Resources Management
Advanced Leadership Course Tuesday, AM, Part 2 The Project Team
Matching PMBOK Section
What is Project Management? How does it affect how you do your job?
MGT 461 Lecture # 19 Project Initiation Phase (I OF II)
Human Resource Management Mr. Abed el-Fatah Afifi.
BSBPMG405A Apply Human Resource Management Approaches Apply Human Resource Management Approaches Human Resource Management Processes – Part 1 C ertificate.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 8 Project Resource Management Resource Planning.
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 9: PROJECT HUMAN RESOURCE MANAGEMENT 1.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
The Project Management Body of Knowledge (PMBOK)
Diploma of Project Management Project Management Environment Course Number Qualification Code BSB51507.
Management of Community Nutrition Services Chapter 19.
© 2008 Prentice Hall2-1 Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process.
Ch. 3 Human Resource Management KSPE Job Descriptions Homework for class, part 2 Write a job description for a team physician for your site (budget.
LECTURE IV. o Project HRM include the processes that organize, manage and lead the project team. o The project team is comprised of the people with assigned.
The Project Management Life Cycle. What is the Project Management Life Cycle? A project life cycle simply includes the necessary steps, from beginning.
What is Project Management? What makes it different from a process, service or program?
Project Management Processes for a Project
Manage Project Human Resources Human Resource Management Processes – Part 1 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Management and Risk. Definitions Project Management: a system of procedures, practices, technologies, skills, and experience needed to manage.
Source: PMBOK 5 th Ed. 1 Map The Project Management Body of Knowledge (PMBOK) The PMBOK guide is an attempt to document the generally accepted PM information.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
SOFTWARE PROJECT MANAGEMENT Project Human Resource Management Dr. Ahmet TÜMAY, PMP.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
Project Management Processes for a Project
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
12.1 Plan Procurement: Introduction
Lecture “6” Manage Project Team
PM B-03 Managing Organizational Development and Change Phase 4 Individual Project HR Planning and Project Management By John W. Casto Instructor.
Overview of A Guide to the Project Management Body of Knowledge (PMBOK ® Guide)—Fourth Edition.
Agenda  Purpose  Processes  Deliverables  Executing Activities 4.3.
Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
PRINCE2 and the PMBoK guide
Human Resources Management
9.1 Plan Human Resource Management
CHAPTER10 Project Human Resource Management
Resource Planning.
Resource Management.
Introduction to HUMAN RESOURCE MANAGEMENT
Systems Analysis and Design in a Changing World, 4th Edition
Project Human Resource Management
Identify the Risk of Not Doing BA
Project Integration Management
TechStambha PMP Certification Training
Effective Project Management
PMI North Area PMP Exam Study Group
Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process and Team Approach, 1e.
Human Resources Management
CHAPTER9 Project Human Resource Management
CIS12-3 IT Project Management
Real World PM Interactive Exercise
Human Resources Management
Project Integration Management
Presentation transcript:

Project Human Resource Management

Presentation Team 1)Mrs. Mardia Ibrahim Osman(Mechanical Engineer) 2)Mr. Elsaeed Osman Elsheikh(Medical Doctor) 3)Mr. Awad Abdel Zahir Hussein(Agriculturist) 4)Mr. Zahid Eltahir Khalid(Mechanical Engineer) 5)Mr. Mohammed Zaki(Industrial Engineer) 6)Mr. El Fadil Abdel Malik(Economist) 7)Mr. Khalid Osman Abdelsid(Economist) 8)Mr. Najy Abas Hussen Saeed(Mechanical Engineer) 9)Mr. Waleed Hany Shakur(Mechanical Engineer) 10)Mr. Omer Salaheldin Elsidiq(Electrical Engineer)

Project Human Resource Management The processes that organize and manage the project team. (PMBOK) The Project team = People + (Roles * Responsibilities) Any Project = People (X + Y + Z + …..)

Plan – Do – Check – Act (for continuous improvement)

Human Resource Planning: Org. Charts Networking Org. Theory Staffing Management Plan Roles and Responsibilities Project Organization charts Enterprise Environmental Factors Organizational Process Assets Activity resource Estimating Project Management Plan Acquire project Team: Pre-Assignment Negotiation Acquisition Virtual teams Project Staff Assignments Resource Availability Staffing Mgt plan (Updates) Team Performance Assessment Develop Project Team: General Mgt Skills Training Team Building Ground Rules Recognition/ Rewards Manage Project Team: Observation & Conversation Appraisals Conflict Mgt Issue Log Performance Reports Work Performance Information Close Project Requested Changes Recommended Corrective Actns Project Mgt Plan (Updates) Recommended Preventive Actns Integrated Change Control

Human Resource Planning: Org. Charts Networking Org. Theory Staffing Management Plan Roles and Responsibilities Project Organization charts Enterprise Environmental Factors Organizational Process Assets Activity resource Estimating Project Management Plan Acquire project Team: Pre-Assignment Negotiation Acquisition Virtual teams Project Staff Assignments Resource Availability Staffing Mgt plan (Updates) Team Performance Assessment Develop Project Team: General Mgt Skills Training Team Building Ground Rules Recognition/ Rewards Manage Project Team: Observation & Conversation Appraisals Conflict Mgt Issue Log Performance Reports Work Performance Information Close Project Requested Changes Recommended Corrective Actns Project Mgt Plan (Updates) Recommended Preventive Actns Integrated Change Control

HR planning determines project roles, responsibilities, reporting relationships and create staffing management plan i.e.  How & when to acquire team members.  Criteria for releasing.  Training needs.  Plan for recognition and rewards.  Compliance consideration.  Safety issues.  Impact of the staffing. What is HR Planning?

HR Planning In Puts  Enterprise Environmental Factors  Organizational: Dept. involved and their working arrangements.  Technical: discipline and specialities, software, equipments etc.  Interpersonal: - What are the types of relationship between candidates? - Formal, informal, supervision, subordinates, supplier - customer, cultural, languages, level of respect and trust.

 logistical: buildings and offices relation, residence.  Political: - stakeholders and individuals goals and agendas. - Groups that have informal power. - Informal alliances.

 Organization process assets If the organization is matured with the field of PM, templates and check lists could be useful.  Activity Resources Requirement It is the requirement of HR and competence defined in the PM plan.

HR Planning Tools & Techniques  Organization chart & position description One of the following methods is used for assigning responsibilities  Hierarchical type charts.  Matrix based charts.  Text oriented format.

 Networking Informal interaction with others in the organization or industry to understand political and interpersonal factors.  Organizational Theory Applying proven principles that shortens the amount of time needed to create HR planning output.

HR planning outputs  Roles & Responsibilities  The role :It is the label describing the portion of project for which the person is accountable e.g. accountant, civil eng, geologist etc.  Authority :It is the right to use project resources, make decisions and sign approvals.  Responsibilities the work that a team member should execute to complete project.

 Project Organization Charts It is a formal or informal chart that shows the reporting relationship within the team members.  Staffing Management Plan This plan should determine the following: -Staff acquisition. -Time table, using tools like resource histogram. -Release criteria, best to be on time. -Training needs. -Recognition and rewards. -Compliance with government rules union contracts org regulation. -Safety.

Org. structures 1.A weak matrix org. means weaker role for project manager. 2.Collective bargaining agreements with unions. 3.Economic condition Hiring freezes, reduced training funds or lack of travelling budget. Constraints of HR planning

SUMMARYTITLENo. The point is made that organizational structure defines the reporting and authority relationships in the project. Three basic kinds of organization are defined (functional, project, matrix), and it is noted that this may change through the project life-cycle. Organizational structure 1 The many forms of communications are identified, including the need for particular meeting to be conducted – e.g. a kick-off meeting at the start of the project. Communications2 The importance of the project team is discussed and the principles outlined that motivation and conflict resolution are important aspects of this. In addition, it is stated that 'Cultural characteristics of team members should be given full consideration: different cultures create different working needs'. Teamwork3 The recruitment, development, safety and welfare of staff is identified as a specialist skill set, where the project manager has some responsibility. Personal management4 SUMMARY OF: PROJECT HUMAN RESOURCES MANAGEMENT RELEVANT

SUMMARYTITLENo. This is counted as part of the project planning phase, where the structure is determined in advance, and jobs designed into the structures. This is a very involved process that results in the production of an organization chart for the project, along with job descriptions and identified needs for staff development. Project human recourse management- organizational planning 5 The characteristics of the individuals required should be determined to include their experience, interests, characteristics, availability and competencies. They are then recruited through negotiation with functional heads, or procurement from outside sources. Project human recourse management-staff acquisition 6 'Development as a team is critical to the project's ability to meet its objectives.' This activity should be in line with the needs of the project therefore, and the tools for doing this include team-building activities, general management skills enhancement and training, reward and recognition and, interestingly, co-location. Project human recourse management-team development 7 SUMMARY OF: PROJECT HUMAN RESOURCES MANAGEMENT RELEVANT