AMS TRD meeting Electronics 17th July 2002, CERN G. Schwering: Overview M. Capell: Crate Mechanics/Arrangement W. Karpinski: Front End – Status C.H. Chung:

Slides:



Advertisements
Similar presentations
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Advertisements

Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Status of the LAV electronics G. Corradi, C. Paglia, D. Tagnani F. Gonnella, M. Raggi INFN LNF F. Gonnella, M. Raggi INFN LNF Photon Veto WG CERN 13/12/2011.
Status of Tracker Power supply electronics Mauro Menichelli,Sandor Blasko,Lucio Accardo INFN Perugia.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
TDR2 FM board tests D. Haas Test Setup Test Procedure Functional tests Results Test Schedule.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
TRD DAQ (U) Software Status TIM CERN May.09 Chanhoon Chung, Mark Millinger, Andreas Sabellek IEKP - Universität Karlsruhe (TH)
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
16 – 17 Jul 02Andrew Werner TRD Monitor Tube Readout Electronics: Shaping Peter Fisher, Bernard Wadsworth, Andrew Werner MIT 1.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
7/17/2002R. Henning -- TRD Gas Slow Control1 TRD Gas System Slow Control at MIT- Cambridge AMS TRD Meeting, CERN, July 2002 U. Becker, B. Demirkoz, P.
UG-crate status AMS TIM - CERN - 15/4/2008 A.Bartoloni, B.Borgia, F.R.Spada* INFN Roma.
Status of PDS A.Lebedev MIT AMS TIM Meeting, Houston, January 2007.
A.Ostaptchouk AMS Meeting at CERN, 16 July Measurements of Octagon Walls with 3D CMM Characteristics of 3D CMM Measurement program Results of insert.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
V. Bobillier1 Cable installation status.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
TRD Electronics Flight Production Wim de Boer, Kai Gassmann, Florian Hauler, Andreas Sabellek, Mike Schmanau IEKP - Universität Karlsruhe (TH)
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Mike Capell / Jan ‘04AMS-02 Electronics1 AMS-02 Avionics FSR-II (21 May 2007) Mike Capell Avionics Lead Senior Research Scientist ISS: 108x80m 420T 86KW.
AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
ETD meeting Architecture and costing On behalf of PID group
PID meeting SNATS to SCATS New front end design
Markus Friedl (HEPHY Vienna)
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Mini-drawers, FE-ASIC , Integrator
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
CLAS12 - CT meeting 10 October 2013
10/month is the present production rate 2 FTE + sporadic contributions
AMS 02 Electronics TRD Crate Arrangement
UK CMS Oversight Committee Mtg
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

AMS TRD meeting Electronics 17th July 2002, CERN G. Schwering: Overview M. Capell: Crate Mechanics/Arrangement W. Karpinski: Front End – Status C.H. Chung: Front End – Tests F. Hauler: DAQ Crate Electronics V. Koutsenko: UHVG A. Bartoloni: Gas Crate / Manifolds Electronics

Responsibilities SubjectInstituteContact Front EndAachenW. Karpinski UcrateKarlsruheF. Hauler UHVGMITV. Koutsenko Procurement QM/FM/SM MITA.Lebedev UGcrateRomeA.Bartoloni Box S/C, manifolds MIT J. Burger Cabling, integration AachenG. Schwering

Cabling on Octagon has to be tested on mockup in Aachen Interferences with gas tubing!

Cabling (continued) Total number of conn. between octagon and crates: 82Signal 82HV 20Temperature 16Gas- Manifolds ??Tubing

Comments on following presentations Crate mechanics –How many crates to be produced by Aachen? –Are the drawings final? If not, when? –Procurement of accessories? Front End –Space Qualification analog to crate electronics, have to be worked out in detail –Read-out options (besides our development equipment): 2 Guido boards 2 (UDR+UPSFE+PCI) enough? When can we test togheter with UHVG?

Comments (continued) UHVG –Any news/decisions about DC/DC converter? –When are the different boards EM, BM, QM available? –To run full detector we need 12 UHVG. At the moment only 6 BM are forseen. Does this work? –QM will be produced at CSIST. Some boards have to be sent to Aachen to test with detector before mass production. –What´s about UHVG for UGcrate? –Who is working on test procedures and facilities?

Comments (continued) Gas manifolds –When is a first design of manifold ´piggy back´ available for test of mounting on the octagon? Space Qualification? –Are the boards in UGcrate normal ones (concerning spacing, crate mechanics)? –Some changes in DC/DC converters (diode – MOSFET). Are the specs still ok?