DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
Tracker Summary Makoto Yoshida Osaka Univ. MICE Frascati June 28 th, 2005.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Imperial College Tracker Slow Control & Monitoring.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
1M. Ellis - MICE Tracker Meeting - 12th February 2007 Readout Electronics & DAQ  Introduction  DAQ Spreadsheet u VLSB_DAQ Sheet u Initialisation u Bias.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
MICE Phase 1 Koji Yoshimura KEK June
Online Reconstruction 1M.Ellis - CM th October 2008.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
Methods to reduce dead time and achieve higher trigger rate. Sparsification Event blocking Parallel DAQ systems SFI Sequencing.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Requirements for the Software Group (and agreed actions)
Tracker readout, DAQ, C&M and calibration
Preparation for Station Acceptance Test
Hideyuki Sakamoto CM22, RAL 19/10/08
Tracker Software Status
Presentation transcript:

DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule

Scheme for DAQ DATE (Data Acquisition and Test Environment) framework. Need to build modified readout program for MICE in DATE. –Other part (e.g. data format, eventBuilding) will use default one. –Readout program is prepared for each modules. VLSB module made by FNAL TDC/ADC module made by CAEN Sub-framework (readout+initializing) is under preparing by James.

Status New RHB is coming today, taking data with test charge injection/cosmic-ray. –Threshold: 100,120,160,200,240 – Bias ON & Heater ON –Try heater current to be low by heating cryostat with OXFORD temperature controller. Started working on DATE from last week. –Yesterday, once success to starting readout program in DATE. … fail at 2 nd try … –Should be finished in next week at RAL. Readout code is under implementing. –Sub-framework is almost done? –Command lists are replaced from AFEII to AFEIIt. –Can be tested at stand alone. –Linux driver for SBS(bit3) dataBLIZZARD to test in Imperial. –In next week, test will also be done in RAL.. (using CAEN)

Threshold 100 It seems LHB  RHB compared with previous version for Excel sheet.

Threshold 120 Increase noise

Threshold 160 Increase noise

Threshold 200 Decrease noise

Threshold 240 Decrease/Same? noise

Bias ON - threshold 160 - w/o charge injection test_pulse_033_old-excel_thre160_heater_on_bias_on OLD version (afeIIt_vlsb_daq_810.c.xls)Previous RHB

Bias ON - threshold 200 - w/o charge injection test_pulse_032_old-excel_thre200_heater_on_bias_on OLD version (afeIIt_vlsb_daq_810.c.xls)Previous RHB

Bias ON - threshold 240 - w/o charge injection test_pulse_031_old-excel_thre240_heater_on_bias_on OLD version (afeIIt_vlsb_daq_810.c.xls)Previous RHB

Comment for today ’ s result Noise rate seems to be reproduced as previous RHB. Noise rate seems to be reversed at threshold 160 by eye. –This may not true. For treatment of heater current, it is better to compare with the same RHB, so taking data with default setting with this new RHB.

Possible reason for RHB noise Remember that we do not see ANY noise with test charge injection data. Let ’ s check this fact by taking data as changing triggering rate. –This will be done by LED pulse injection. –If we take data with high rate, we cannot not see any noise as LED data. –It not, there is problem at the setting of self trigger mode. Our goal is to identify/remove the noise. –If heater current is the reason, then we should see any changeable results from it. –We should check it by taking data with the default setting as previous.

Run parameters Run#, #/events, File name Configuration Specify PCs for DAQ Run options Staring data taking Start/Stop/Abort This is copy from ALICE web-page.

Slow progress for DATE Last week Yesterday Goal in RAL? Yesterday, reach to goal, but 2 nd try was failed ….=> finish in next week at RAL!

VLSB data format for new firmware (ver. “ ce ” ) Old Version “ cc ” New Version “ ce ” Header First 4/5 lines (variable) 7 dummy lines (fix?) + Trigger location (line#8&9) + Discriminator hit map (line#10-17) Body Channel address/ADC(128) Channel address/ADC(128) Footer 2/3 lines 0 line? TOTAL 123456789 10101 1212 1313 1414 1515 1616 1717 1818 1919 2020 2323 2121 2424 2525 2626 2727 2828 2929 3030 3131 32322 32-bit VLSB data ADC Counter Status bit 10 lines are added for debug information. “ ce ” is soon available. -- Need to check header length to kwame --

Check numbers for cosmic-ray test 2 VME crates –Slow control will be separated from DAQ crate. 8 AFEIIt boards –To readout 5 stations, we need 3200 channels in total. 8 VLSB modules –1 VLSB is needed to readout 1 AFE board 1 ADC & TDC module –Used for readout defining counter To readout 5 stations ….

Upside Define counter Downside Define counter Low energy filter block Light shield box embedded 5 stations 2channles for TDC/ADC 3200(640 x5) channels for VLSB Patch panel Requires 4 for TDC/ADC & 3200 for VLSB How many channels are used?

#1 #2 #3 #4 #5 8 AFEIIt boards = 8 VLSB modules How about VLSB modules? This cabling is virtual.

Setup for test bench (R12) V2718 MIL 1553 V2718 V1270V1724VLSB V977 DAQ(LDC/GDC) Slow control/Monitoring Optical cable VME crate

Schedule This week (~13 th ) –Checking signals for newly RHB today! –Testing code for VLSB module in Imeprial. Waiting for driver for SBS(Bit3) dataBLIZZARD. –Implement readout code for new firmware (ce). Next week (16 th ~ 20 th ) –Set up test bench at R12 in RAL with JSG/Mike/Nicholls/Craig/etc. Clone system for Geneva University –Testing code for CAEN modules(V977, V1270, V1724) in RAL. –To test VLSB modules in RAL, need more modules! Please send to RAL! Imperial ’ s VLSB will be in use for QA. The week after next (23 rd ~ 27 th ) –DAQ workshop (23,24,25) –Finish to setup DAQ system (mainly to debug readout program, I think)

R12 Here coming 2 cryostats & 1 compressor & 1 transformer & 8 AFE boards & 5 stations & 25 inter/external waveguides & 1 patch panel & 2 VME crates & 2 NIM crates & VME/NIM modules & 2 DAQ PCs & other stuff …