Donald Pope| IPEC 2015 Conference

Slides:



Advertisements
Similar presentations
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Advertisements

Arsenic/Iron Co-Precipitation and High Rate Filtration in the City of Portage Christopher Barnes, P.E., City of Portage Kendra Gwin, P.E., City of Portage.
Young-Rainey STAR Centre
Greenwich Peninsula.
LEACHATE MANAGEMENT AND TREATMENT
Biological waste water treatment
The Effects of Soil Properties on Rain-garden Bioretention and Soil Processes in a Semi-arid City Melissa Mckinley 1, Jordan Brown 2, and Mitch Pavao-Zuckerman.
© 2011 COLUMBIA Technologies. Use of MiHpt Systems to Improve Project Outcomes Rapid, Real-Time High Resolution Site Characterization © 2013 COLUMBIA Technologies.
Environmental Geotechnology Presentation Site OT-16B, Shaw Air Force Base, South Carolina, USA By Oliver Edwards And Alaric Shenton.
A REVIEW OF THE REMEDIATION ALTERNATIVES FOR BENZENE CONTAMINATION AT THE PESTER REFINERY COMPANY SUPERFUND SITE Jonathan M. Diller, P.E., CFM for University.
Water Contaminants Soluble Contaminants - dissolve in water Particulates/Colloids - carried by the water column Insoluble Contaminants - very low solubility.
Treatment of Arsenic in Groundwater EAST HELENA D.W.A.S.W.Daladawatta Dawoud.
Air Force Plant 4 Superfund Site Evaluation of SVE Combined with ERH for the Remediation of TCE Source Material Jeffrey Ragucci SWS 6262 – Soil Contamination.
Forensic Analysis and Sorbent Collection Methods MSRAS Soil Gas Sampling Workshop Indianapolis, IN August 21-22, 2006 Gina Plantz NewFields Environmental.
Environmental Geotechnology Presentation Naval Air Station, Pensacola, Florida.
Pump and Treat Permeable Reactive Barrier Former Intersil, Inc. Site Sunnyvale, California Presented by Daniel Cheung.
Biodegradation of btex
Background Site of a former Industrial Waste Treatment Plant Contaminants accumulated in sludge drying beds and surge pond, they subsequently leaked into.
“GAS MART” petroleum facility in Florida By: Ernest Twum-Barimah Zhengzhong Fang (John) Zhengzhong Fang (John)
Clean-up at BP Paulsboro New Jersey (USA) Roxane Fisher and Mark Ferguson.
BIOREMEDIATION By: Christina Dimitrijevic, Rachel Brown & Ola Johnston.
1 Kent S. Sorenson, Jr. Ryan A. Wymore Enhanced Bioremediation for Treatment of Chlorinated Solvent Residual Source Areas – Case Study and Implications.
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
Chapter 3: Bioreactor Design
1 Soil Vapor Extraction Limitations and Enhancements LeeAnn Racz AgE 558 Semester Project April 2001.
Microwave Soil Vapor Treatment CHA Corporation Field DemonstrationWINTER 2004 CHA Corporation 372 W. Lyon Laramie, WY Telephone:(307) Fax:(307)
Fate and Transport of Chemicals A Presentation by Terrie Boguski Technical Outreach Services for Communities (TOSC) Great Plains/Rocky Mountain Hazardous.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Partitioning of Volatile Organic Carbon Compoundss.
Water quality issues – ‘natural’ controls Acidity – low pH due to infiltration of acidified precipitation; acids from mine drainage; pyrite oxidation.
1 Adsorption and Absorption l Adsorption »Process by which a solute accumulates at a solid-liquid interface l Absorption »partitioning of solute into a.
Partitioning of VOCs: Why do we care? ä Determines how best to treat a site ä vapor extraction ä pump and treat ä remove contaminated soil ä Determines.
CE 510 Hazardous Waste Engineering Department of Civil Engineering Southern Illinois University Carbondale Instructor: Dr. L.R. Chevalier Lecture Series.
Groundwater Pollution GW 12 Chemical Oxidation and Reduction 1.
Groundwater Pollution GW 14 Reactive Barriers and Funnel and Gate 1.
1 In-Situ Treatment of Groundwater with Non-aqueous Phase Liquids December 10-12, 2002, Chicago, IL Scott G. Huling, Ph.D., P.E. USEPA Robert S. Kerr Environmental.
1 Case Summary: Electrical Resistance Heating ICN Pharmaceuticals, Inc. Portland, Oregon Jennifer Sutter, Project Manager Oregon DEQ EPA Technology Innovation.
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
University of Pretoria
LOGO Feasibility Test of Applying Complex Remediation Technology for Diesel Contamination in Soil and Groundwater 2012 International Conference on Environmental.
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
2010 Long-Term Surveillance and Maintenance Conference Applied Science and Technology for the U.S. Department of Energy Office of Legacy Management Grand.
PERFORMANCE OF A GRANULAR ACTIVATED CARBON BIOFILTER IN LOW STRENGTH WASTEWATER TREATMENT D. S. Chaudhary, H. H. Ngo and S. Vigneswaran Environmental Engineering.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Monitored Natural Attenuation and Risk-Based Corrective Action at Underground Storage Tanks Sites Mike Trombetta Department of Environmental Quality Environmental.
1 FUNDAMENTAL PRINCIPALS OF In Situ THERMAL TREATMENT Professor Kent S. Udell Department of Mechanical Engineering Department of Civil and Environmental.
1 Section 6- ISCO DESIGN  Initial Site Evaluation  ISCO Compatibility  ISCO Modeling and Dosage Considerations  Bench Testing  Pilot Testing/Delivery.
Evaluation of Intrinsic Biodegradation and Amendments to Support Enhanced Monitored Natural Recovery of Sediments Tom Krug and David Himmelheber, Geosyntec.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
A Tree-Based Remediation System for Treatment and Hydraulic Control of a Hydrocarbon Plume in a 20 Foot Deep Aquifer at a Former Refinery in Central Oklahoma.
Sustainable development and the environment Remediation.
DeNovo Constructors, Inc.
Bioremediation and Bionanotechnology Part 2 Dr Russell Thomas, Parsons Brinckerhoff 19 th May 2010.
Biological Treatment of Residual DNAPL
Mike Perlmutter 5th Annual Joint Services Pollution Prevention and
In Situ Perchlorate Bioremediation for Soil and Groundwater Dan Cowan 5th Annual Joint Services Pollution Prevention and Hazardous Waste Management Conference.
1 Combined Perchlorate and RDX Treatment in Biological Fluid Bed Reactors PRESENTATION AT THE NDIA 30 TH ENVIRONMENTAL AND ENERGY SYMPOSIUM APRIL 7, 2004.
Evaluating the Practicality of LNAPL Recovery Jeff Lane, P.G. November 17, 2015 International Petroleum Environmental Conference (IPEC) IPEC 22 Contact.
Groundwater Pollution
MIC 303 INDUSTRIAL AND ENVIRONMENTAL MICROBIOLOGY
By Alex Walton Josh Bush Alex Walton, Josh Bush1.
Groundwater Pollution
Benefits of Laboratory Treatability Studies in Support of Full-Scale Design for In Situ Remedies Michaye McMaster Geosyntec Consultants Sandra Dworatzek.
Introduction Results & Discussion At present, disinfection of wells and drinking water pipelines is carried out by treating with chlorine- containing reagents.
Use of a Vadose Zone Biobarrier for Removal of Nitrate from Percolating Groundwater Jim Hunter, USDA-ARS, Fort Collins, Colorado
Microwave Soil Vapor Treatment
Groundwater Pilot Treatment System Update May 2017
What is an on-lot sewage system?
Katherine Weeks (AMEC) Scott Veenstra (AMEC) David Hill
Qays Jasim Saud Syed E. Hasan Department of Geosciences
Web-based Class Project on Geoenvironmental Remediation
Presentation transcript:

Donald Pope| IPEC 2015 Conference Permeable Reactive Barrier Treatment for Groundwater Exiting a NAPL Contaminated Area Donald Pope| IPEC 2015 Conference

Agenda Site Description Description of Non-aqueous phase liquid (NAPL) Description of Permeable Reactive Barriers Laboratory Treatability Study Design Laboratory Treatability Study Results Recommendations Conclusion

Site Description Site is located in Michigan Water treatment property Groundwater contains Volatile Organic Compounds (VOCs) and Semi-Volatile Organic Compounds (SVOCs) above the Michigan Department of Environmental Quality (MDEQ) generic clean up criteria Highest concentrations include: benzene, toluene, ethylbenzene, and xylenes (BTEX compounds) Naphthalene, trimethylbenzene, trichloroethylene (TCE), and cis-1,2-dichloroethylene (cis-1,d-DCE) Groundwater is migrating off-Site at locations that cover approximately 2,500 linear feet along the Sites western property boundary

Remedial Option under Consideration A bentonite slurry wall constructed along the western property boundary The insertion of a funnel and gate permeable reactive barrier (PRB) system into a slurry wall to treat impacted groundwater in-situ as it leaves the Site

Laboratory Study A bench-scale treatability study was performed to assess the potential technologies for their ability to remove the VOCs, SVOCs, and inorganics from the groundwater as it flows through the gate The in-situ remedial technologies evaluated in the treatability study for the gate system included enhanced biodegradation, ozone sparging, and adsorption

Description of Permeable Reactive Barriers (PRB) Passive treatment that relies on groundwater flow to bring contaminants to reactive media Permanent structure which intercepts and treats impacted groundwater Physical, chemical, and/or biological processes can be used as removal mechanisms for contaminants Con consist of a trench or rows of injection wells Various reactive media can be used for PRBs

Description of Permeable Reactive Barriers (PRB) Commonly used trench reactive media include: Zero Valent Iron (ZVI) Zeolites Granular Activated Carbon (GAC) Organic Media Proprietary Substrates such as EHC Chemical Oxidation agents Chemical Reducing Agents Emulsified Zero Valent Iron (EZVI) Ozone Sparging

Advantages of PRBs Passive, no energy input No aboveground structures Limited maintenance Low O&M costs Contaminant concentrations are rapidly reduced upon contact with the media Long lifetime, 10 to 20+ years

Disadvantages of PRBs DNAPL not treated effectively Dissolved metal species may interfere with PRB longevity (clogging) Detailed understanding of hydraulic flow characteristics (overtopping) Installation can be expensive and complex (deep plumes) May need to be maintained indefinitely if source is not removed

Types PRBs Funnel and Gate Impermeable walls guide the groundwater to reactive media Continuous Trench Treatment media extends across width and depth of plume

Treatability Study Objectives Determine the empty bed contact time (EBCT) for a GAC only column Determine whether pre-treatment with manganese green sand would enhance the performance of the GAC columns Determine the GAC change out frequency Determine the effect of sparge rates that can be achieved in a waster water treatment place setting on the residence times for aerobic treatment or ozone treatment Determine the optimum technology or combination of technologies for groundwater treatment

Initial Groundwater Characterization Parameters Units GW-001 1,2,4-Trimethlybenzene mg/L 434 Benzene 103,000 Ethylbenzene 7,800 Naphthalene 5,780 Toluene 19,600 m/p-Xylenes 1,100 O-Xylenes 938

Treatability Study Design GAC Test Set Up: 3 Columns were set up as follows: Column 1: Groundwater pumped in at a flow rate of 1.25 mL/min Column 2: Groundwater pumped in at a flow rate of 2.5 mL/min Column 3: Groundwater pumped in at a flow rate of 5 mL/min Effluent samples from the columns were analyzed for VOC after 1 hour of operation and then every 24 hours thereafter until breakthrough was observed

Treatability Study Design Column 1: Flow 1.25 mL/min Column 3: 5 mL/min Column 2: Flow 2.5 mL/min

Treatability Study Design Biodegradation Test Set Up: Testing was performed to determine the parameters for biological treatment Two identical glass columns were run as follows: Column 1: Sand only (Control) Column 2: Sand, air, and nutrients Site groundwater pumped using a multi-channel pump into the bottom of each of the columns at a rate that would give a hydraulic retention time (HRT) of 2.5 hours Air was sparged into each column at 10mL/min The water from the tops of the columns was collected after 24 hours and analyzed for VOC The flow rates were slowed to increase the HRT to increase the removal of the VOC present in the groundwater

Treatability Study Design Air Sparge Flow Meter Air Sparger Vent Column 1: Sand Only (Control) Column 2: Sand and Air

Treatability Study Design Ozone Test Set Up: Two identical columns were run as follows: Column 1: Sand only (Control) Column 2: Sand and ozone sparger Ozone was sparged into column 2 at 20 mL/min Site groundwater pumped into the bottom of each of the columns at a rate that would give a HRT of 5 hours Groundwater was collected after 5 hours of operation The flow rate of the columns were decreased to increase the HRT to increase the VOC removal The ozone sparge rate was increased to increase the VOC removal  

Treatability Study Design Ozone Sparge Flow Meter Ozone Sparger Vent Column 2: Sand and Ozone Column 1: Sand Only (Control) Ozone Generator Used to Produce Ozone

GAC Test Results Parameters Column 1 Column 2 Column 3 Flow Rate 1.25 mL min-1 2.5 mL min-1 5 mL min-1 EBCT 38.4 min 19.2 min 9.6 min Volume at Breakthrough 33.4 L 32.4 L 14.8 L Benzene Loading Rate 0.28 g benzene/g carbon 0.27 g benzene/g carbon 0.12 g benzene/g carbon An EBCT of 9.6 minutes is sufficient to treat the water A lower loading of benzene was achieved which would require more change outs of the carbon An EBCT of 19.2 minutes would reduce the change out frequency At an EBCT of 19.2 minutes 1,000 pounds of carbon would treat approximately 324,000 gallons of water prior to becoming saturated

Biodegradation Test Results Over 90 percent removal of all VOCs was observed at an HRT of 5 hours comparing Column 1 (control) to Column 2

Biodegradation Test Results Satisfactory removal of VOC was obtained once the microbial population has been established in the columns Greater than 80 percent removal of all VOCs compared column 1 (control) to column 2 except for xylenes which showed greater than 50 percent removal

Ozone Test Results HRT of 5 hours 20 mL/min Ozone HRT of 7 hours 20 mL/min Ozone HRT of 7 hours 30 mL/min Ozone HRT of 7 hours 40 mL/min Ozone % Removal of 1,2,4-Trimethlybenzene 55.1% 0.00% 83.7% 51.4% % Removal of Benzene 54.0% 88.5% 83.3% 89.5% % Removal of Ethylbenzene 47.9% 87.0% 76.2% 37.5% % Removal of Naphthalene <1% 96.0% % Removal of Toluene 52.6% 90.1% 86.0% 91.8% % Removal of m/p-Xylenes 48.0% 88.4% 86.8% 91.3% % Removal of O-Xylenes 43.1% 88.6% 80.5% 86.6% Although significant removal of VOC was observed at an ozone sparge rate of 30mL/min and 40mL/min, the VOC concentrations remained elevated. The testing was discontinued since satisfactory removal of VOC was unlikely to occur.

Recommendations GAC Tests: EBCT to 19.2 mins Change out approximately every 324,000 gallons Biodegradation Tests: The addition of nutrients to the groundwater and the provision of air to the biologically active filter The addition of a microbial inoculum is required since the groundwater contained the bacteria necessary for the treatment of the water HRT of 2.5 hours Ozone Tests:  Ozone sparging would not treat the VOC in the groundwater within a practical time period, therefore, this technology is not recommended

Conclusion Permeable Reactive Barriers are effective technologies for the treatment of groundwater before migrating off-Site Many different media are available for use in PRB and the selection of the medium depends on the contaminant(s) and site characteristics PRB can be installed using trenches or injection wells GAC and biodegradation are effective PRB media

www.ghd.com