SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.

Slides:



Advertisements
Similar presentations
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Advertisements

FNAL Superconducting RF Program Sergei Nagaitsev.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Superconducting RF Cavity/Cryomodule Development at Fermilab (Industrialization) C.M. Ginsburg (FNAL) Proton Accelerators for Science and Innovation 2.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
US Cavities Status and Plan Mark Champion 01 October 2009.
ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Perspective on ILC SC Technology Collaboration Fermilab-China Bob Kephart ILC Program Director Fermilab.
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
R.L. Geng, 8/28/07AES cavity meeting, JLAB1 AES 9-cell ILC Cavity Processing and Testing at JLAB What have been learned and proposals for future steps.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Update on SRF Activities at Argonne Mike Kelly, Peter Ostroumov, Mark Kedzie, Scott Gerbick (PHY) Tom Reid, Ryan Murphy (HEP) Thomas Proslier, Jeff Klug,
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
ILC Cavity and Cryomodule Overview Shekhar Mishra Fermilab.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
SRF Plans at ANL & FNAL Bob Kephart ILC Program Director, Fermilab ANL-FNAL-U of C Collaboration Meeting Oct 12, 2009.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Status of U.S. Cavity & Cryomodule Industrialization Bob Kephart LCWS10/GDE Beijing, March, 2010.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
F Fermilab ANL/FNAL SCPF EP/HPR Processing Status and Plan Allan Rowe TD/SRFDD.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
U.S. Plan for Cavity Production Bob Kephart ALCPG09/GDE Sep 30, 2009.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
Cavity Processing for 
F ILC/SRF Strategic Planning OHAP Rich Stanek September 17, 2009.
FNAL SRF Program: 1.3 GHz Camille M. Ginsburg (FNAL) Fermilab Accelerator Advisory Committee November 7-9, 2011.
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
SRF Advances for ATLAS and Other 
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
ILC-SCRF Test Facilities considerations
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
STF Plan of gradient improvement
ANL Proposal to Perform Electropolishing for the ILC
S0 Status report from KEK
ILC Cavity & Cryomodule Overview
Presentation transcript:

SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008

2 Joint ANL/FNAL 2000 ft 2 Cavity Processing Facility at Argonne Electropolishing Chemical polishing Class 10 rinsing

3 ILC –Electropolishing; have demonstrated a 30 MV/m+ cavity –High-pressure rinsing and clean assembly for 9-cell cavities –1.0 ANL FTE FY08 (Half of this used in Q1; ¼ FTE over remainder of 08) ATLAS Upgrade –7-cavity upgrade cryomodule –Demonstration of FRIB technology –2.5 ANL FTE FY08 (75% of available ANL SRF manpower) FRIB (Facility for Rare Isotope Beams) –Proposal submitted (Have CD0, waiting for ANL/MSU site selection Dec. 08) –0.25 ANL FTE APS Upgrade –SRF for ERL or recirculating linac –Minimal effort due to 08 budget SRF Activities, Goals, Manpower

4

5 HINS, Project-X –Have performed BCP, HPR on SSR1 (350 MHz single-spoke) –Will perform similar procedure on 2 nd spoke cavity –2 ANL man-weeks/procedure –Will assist FNAL with additional processing SRF Activities, Goals, Manpower

6 ANL/FNAL SRF Effort for ILC Electropolishing –System operational; 2 FTE can perform 3 procedures/week –Have electropolished 4 single-cell cavities (3 tested at FNAL) 1 nine-cell cavity (tested at JLab) High-Pressure Water Rinsing –FNAL has installed HPR in FNAL portion of the facility Clean rooms substantially re-configured (“class 10” drying area) HPR pump installed and tested HPR tool delivered to ANL & assembled and tested Control system programming being completed –ANL will operate a 2 nd HPR starting summer of ’09 (rinse ALD treated cavities)

7 ANL/FNAL SRF Effort for ILC Ultrasonic cleaning –Large 400-liter 2-meter tall tank –Vertical cleaning for all existing niobium cavities –FNAL  fixturing for 9-cell cavities; ANL  electrical hook up –Required for 9-cell processing at ANL; complete Dec. 08 Clean room assembly (FNAL lead) –Cavity pump out and back fill system, clean room tools, fixturing, ancillary systems (couplers, pickups) –Prepare clean room for class-10 operations Critical path for complete single-cell processing; complete Dec. 08

8 ANL Effort –1.25 FTE (mostly on electropolishing) 1 procedure/month (electropolish) Oct March EP /month through April 09 - Sept. 09 ~17 total EP procedures for FY09 FNAL Effort –3 FTE 2 FNAL personnel to be trained on EP (D. Bice, G. Wu) All HPR and clean assembly after EP starting Dec.08 We should have a complete single- and 9-cell cavity chemical processing, cleaning and clean room assembly capability starting around the 1 st of the year FY09 Effort (manpower) for ILC at joint ANL/FNAL Facility

9 Electropolishing system for 1.3 GHz elliptical cavities First 1.3 GHz cavity electropolished in August 2007 Reconfigured for 9-cell Q1 ’08 May be reconfigured for different cavity lengths in ~1/2 day

10 1-cell Cavity AES 4 Initially BCP’d at Cornell and tested at E ACC =25 MV/m Followed by 65 microns EP at ANL; HPR at FNAL Cold tested at FNAL  RF power limited at E ACC =33 MV/m Tried 120 o C in-situ bake  increased field emission

11 1-cell Cavity NR-1, Nov. 14, 2008 Initially BCP’d at Cornell and tested at E ACC =28 MV/m Followed by ~100 microns EP at ANL; HPR at FNAL Cold tested at FNAL  Quench at E ACC =8 MV/m ??

12 LEWA High-pressure Pump commissioned Oct. 08

13 FNAL High-Pressure Rinse at ANL for 1.3 GHz elliptical cavities Based on Cornell design Tested with LEWA pump,Oct. 08 First operation w/ 1-cell in December 08.

14 Summary/Plan At ANL/FNAL processing facility –5 electropolish procedures for ILC performed –3 cavities cold tested –Reached 33 MV/m after EP with recent single cell –Will perform additional single-cell procedure(s) before going on to 9- cell Ultrasonic cleaning for 9-cells available Dec. 08 FNAL high-pressure rinsing tool operational; need to finish setting up for clean assembly FY09 Plan– –ANL will do electropolishing (~1.25 FTE) & train 2 FNAL people –FNAL will lead HPR and clean clean assembly –Goal is complete procedures (EP, Ultrasonic, HPR, clean assembly)